26-John Adams Paint Plans Summer 2026.pdf

PDF 944 KB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This document is a set of architectural floor plans for John Adams Middle School prepared by Rochester Public Schools (ISD #535) in Minnesota for interior painting improvements scheduled for summer 2026. The plans include three detailed floor layouts—Lower Floor Plan (3A101), Main Floor Plan (3A102), and Second Floor Plan (3A103)—with designated room numbers and painting specifications. The scope of work identifies Priority 1 and Priority 2 painting tasks across multiple rooms and hallways. General field color is specified as Dover White SW 6385, with accent colors including Pavestone SW 7642 for standard accents, Rave Red SW 6608 for doors and high-moisture frames, and Iron Ore SW 7069 for accent grey and handrails. The plans note that certain existing paint colors must be matched during execution. Doors are to be painted to match existing conditions or to Iron Ore SW 7069 with site verification required. The document indicates no preferred painting date and emphasizes that plans are not to scale and are marked for vendor/contractor field verification only, not for direct construction use.

The specifications require contractors to complete surface preparation, priming, and painting work before the start of the 2026-27 school year as part of a district-wide initiative spanning 27 sites. Responses must be submitted through Bonfire, with no alternative submission methods accepted. Contractors will need to coordinate scheduling with district facilities staff and comply with all applicable safety and environmental standards. The document does not specify pricing terms, set-asides, contract duration, or renewal options in the floor plan itself, as these details would be contained in the formal solicitation documents and bid requirements issued separately by Rochester Public Schools.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

UP

UP

UP

UP

UP

UP

DN

DN

UP

FD

FD FD

FD

FD

FD FD FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

SBSBSBSB

SB

G006E G006D

G006

G006AG008AG006BG006C

G008

G010

G010AG010BG012AG012B

G012

G012C G012E G012D

G014 G016

G016G G016F

G020 G020A

G022 G022A

G026

G028

G030

G034D

G032

G034G036

G034CG002

G004

G001

G001A

G001BG005AG003

G005

G007

G007A

G009 G011

G013

G019A

G015

G017

G017B

G019

G023

G016A G016B

G016C

G016D G016E

G018A

G018

G018B

G000

G021

G040 C

G006F

B

G57 G60

G022D

G022E

G022B

G022C

G024

G026A

G026B

G034E

G034F

G034AG034B

G034H

G034G

D

G002A

A1

G1

G017A

G017C

G030A

100G

3 4 5

2A

2B

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 1:26:04

PM

3A101Lower Floor Plan

John Adams Middle School

Doors 1, 2, 2A, 2B, 11, 12 all enter onto the main level and actual door may not be shown on this drawing.

NOTESPRIORITY

1 1. PAINT ENTIRE WALL, DOVER WHITE SW 6385

GENERAL NOTES:

NO PREFERED DATE TO PAINT

GENERAL FIELD COLOR: DOVER WHITE SW 6385

ACCENT: PAVESTONE SW 7642

ACCENT RED/H.M. FRAMES: RAVE RED SW 6608

ACCENT GREY/HANDRAILS: IRON ORE SW 7069

EXISTING PAINT COLORS TO MATCH:

DN

DN

UP

DN

UP

DN UP

DN

DN

DN

DN

DN

DN

DN

DN

DN

102B

100B100C100D100E

102A

102D102E102F102G104A

119A

130 128

134A

136 138

131A

131B

E

108A

114A

110 108B

114B

112A

113A

132A 2

134B

134C

148A

144A

F

900A

100F 102C

100H

100I

100A

2A

2B

3 4 5

Spec Ed SP

Kitchen / Lounge

108A

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 1:26:05

PM

3A102Main Floor Plan

John Adams Middle School

Doors 3,4,5,6,7,8,9,10,11 all enter onto the lower level and actual door may not be shown on this drawing.

NOTES:PRIORITY

1 1. PAINT DOORS TO MATCH EXISTING OR

IRON ORE SW 7069 *SITE VERIFY COLOR

GENERAL NOTES:

NO PREFERED DATE TO PAINT

GENERAL FIELD COLOR: DOVER WHITE SW 6385

ACCENT: PAVESTONE SW 7642

ACCENT RED/H.M. FRAMES: RAVE RED SW 6608

DN

DN

UP

DN

211A

222 224 226

201203

200202204206

213C 215

221 219 217

208A

200A

222A

K

236A

236B

240A

239B 239A

213B213A

211B

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 1:26:06

PM

3A103Second Floor Plan

John Adams Middle School

NOTESPRIORITY

1. PAINT HALLWAY, DOVER WHITE SW 6385

2. PAINT WALL TO MATCH EXISTING COLOR

GENERAL NOTES

NO PREFERED DATE TO PAINT

GENERAL FIELD COLOR: DOVER WHITE SW 6385

ACCENT: PAVESTONE SW 7642

ACCENT RED/H.M. FRAMES: RAVE RED SW 6608

Sheets
3A101 - Lower Floor Plan
3A102 - Main Floor Plan
3A103 - Second Floor Plan

File details come from the government source that posted it. Updated .