This is a site-specific painting plan document for Morris Friedell Middle School prepared for Rochester Public Schools (ISD #535) in Minnesota as part of a district-wide interior painting initiative scheduled for summer 2026. The document provides a floor plan identifying Priority 1 painting work requiring the entire wall where damage occurred to be painted with Pure White SW 7005 paint using a glue gun application method. Work can commence in June 2026 and must be substantially completed before the start of the 2026-27 school year. The project must accommodate summer school operations during the painting period. This scope represents one of 27 district sites included in the overall summer 2026 painting improvements contract opportunity.

The document does not specify pricing terms, contract duration, or renewal options. As part of the broader district-wide solicitation, contractors must coordinate scheduling with district facilities staff, comply with all applicable safety standards and environmental regulations, and submit responses through the Bonfire platform. The scope of work includes surface preparation, priming, and painting of designated interior and exterior areas as specified in site-by-site documentation. No preferred start date has been established, providing flexibility for contractor scheduling within the June start window and before the new school year begins.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

137A

134A

135C 135D

134C

136B

E

136A

137B

134B

100F 100E 100D 100C 100B 100A

117A

117B

119A

121120

118 123

126A

126B

130A

127A

B

B

C

C

124B 124A

124D

116A

116B

111108

109 110

104A

100H

100G

100J

131A

128B

406 407

Rochester Public

Schools Date

Drawn By

NOT TO BE USED FOR CONSTRUCTION

CONTACT CONSTRUCTION

SERVICES WITH CORRECTIONS

4/22/2026 11:13:30 AM

3A101Floor Plan

Morris Friedell Middle School

Author

Issue Date

NOTES:PRIORITY

1 1. PAINT ENTIRE WALL WHERE DAMAGE HAPPENED WITH

GLUE GUN, PURE WHITE SW 7005

GENERAL NOTES:

NO PREFERED DATE TO PAINT. CAN START IN

JUNE. THERE WILL BE SUMMER SCHOOL.

Sheets
3A101 - Floor Plan