PBS Past Performance Questionnaire Summary

This is a General Services Administration (GSA) past performance evaluation form used for the Public Buildings Service (PBS) contract vehicle. The questionnaire is designed to be completed by both contractors/offerors and clients to document and evaluate contractor performance on completed federal projects. Contractors complete Blocks 1-4 providing firm information, work classification (prime, subcontractor, joint venture), contract details including contract number, type (firm fixed price or cost reimbursement), award date, completion date, original and final contract prices, and a description of project complexity and relevance to current solicitations. Clients complete the remainder of the questionnaire, providing point of contact information and detailed performance ratings across seven evaluation categories: Quality, Schedule/Timeliness of Performance, Customer Satisfaction, Management/Personnel/Labor, Cost/Financial Management, Safety/Security, and General performance. Each category contains multiple sub-elements rated using a five-point scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, or Not Applicable). Additional sections address sustainability practices, overall hiring recommendation, and require narrative comments addressing strengths, weaknesses, and performance risk factors. The form includes definitions and guidance notes for each rating level and allows for attachment of supplementary documentation. Completed questionnaires are submitted by offerors with their proposals and may be reused for multiple PBS solicitations.

View the file

Other files

File Type Posted
27. Amendment 47PB5126R0008 0008 2026 07 13.pdf PDF
3. Agreement Rev 2 2026 06 18.pdf PDF
25. Amendment 47PB5126R0008 0007 2026 06 18.pdf PDF
6. WD VT20250027 2026 05 18.pdf PDF
1. Solicitation Rev 1_2026 06 11.pdf PDF
2. SF1442 Rev 1 dated 2026 06 15.pdf PDF
3. Agreement Rev 1 2026 06 12.pdf PDF
21. Amendment 47PB5126R0008 0006 2026 06 15.pdf PDF
20. Amendment 47PB5126R0008 0005 2026 06 02.pdf PDF
19. Amendment 47PB5126R0008 0004 2026 05 29.pdf PDF
16. Alburg Springs - Port Signage SOW-ASR 01.pdf PDF
15. Amendment 47PB5126R0008 0003 2026 05 21.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes_Rev 1 Amendment 0002_ 2026 05 15.pdf PDF
14. Amendment 47PB5126R0008 0002 2026 05 15.pdf PDF
13. Amendment 47PB5126R0008 0001 2026 05 12.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
RP - Vertical Radiant Panel Cutsheet.pdf PDF
RG - Return Grille Cutsheet.pdf PDF
SG - Supply Grille Cutsheet.pdf PDF
ET - Expansion Tank Cutsheet.pdf PDF
FT - Fin Tube Cutsheet.pdf PDF
GFT - Glycol Feed Tank Cutsheet.pdf PDF
BT - Buffer Tank Cutsheet.pdf PDF
FB - Filter Box Cutsheet.pdf PDF
PUH - Propeller Unit Heater Cutsheet.pdf PDF
GI and GR - Gravity Intake and Relief Cutsheet.pdf PDF
DH - Duct Mounted Humidifier Cutsheet.pdf PDF
SG and EG - Security Grille Cutsheet.pdf PDF
BSF - Booth Supply Fan Cut Sheet.pdf PDF
RP - Horizontal Radiant Panel Cutsheet.pdf PDF
AS - Air Separator Cutsheet.pdf PDF
EHC - Electric Heating Coil Cutsheet.pdf PDF
2026-02-06 Review of Proposed Renovations - Historic Context (1).pdf PDF
4. GSA527-21a 2026 04 15.pdf PDF
FCU - Fan Coil Unit Cutsheet.pdf PDF
6. WD VT20250027 2026 04 15.pdf PDF
CP and GP - Pump Cutsheets.pdf PDF
3. Agreement 2026 04 15.pdf PDF
EH - Electric Wall Heater Cutsheet.pdf PDF
GSHP - Ground Source Heat Pump Cutsheet.pdf PDF
L - Louver Cutsheet.pdf PDF
HP and CU - Heat Pump Mini-Split Cutsheet.pdf PDF
8. Tips on Preparing a Subcontracting Plan 2026 04 15.pdf PDF
HUM - Steam Humidifier Cutsheet.pdf PDF
Alburg Springs VT LPOE Code Report - 20260206 (1).pdf PDF
9. Model Subcontracting Plan 2026 04 15.docx DOCX document
5. Proprietary Information Agreement 2026 04 15.docx DOCX document
EF - Exhaust Fan Cutsheet.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PBS Past Performance Questionnaire July 2014

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Firm Name:

Address:

Phone Number: DUNs Number:

Contact Name

Email Address: : Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: Prime Contractor Sub Contractor Joint Venture Other (Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please explain)

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

CLIENT INFORMATION

Client Point of Contact Information

Name:

Title:

Phone Number:

Email Address:

Project Information

Contract Type:

Contract Title:

Contract Location:

Describe your role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of technical data/report preparation efforts.

(b) Ability to meet quality standards specified for technical performance.

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project?

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

(d) Overall customer satisfaction.

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

(b) Ability to hire, apply, and retain a qualified workforce to this effort.

4. MANAGEMENT/ PERSONNEL/LABOR - Continued E VG S M U N

(c) Government Property Control.

(d) Knowledge/expertise demonstrated by contractor personnel.

(e) Utilization of Small Business concerns.

(f) Ability to simultaneously manage multiple projects with multiple disciplines.

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program).

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)?

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).

(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)

Yes No

(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

Yes No

(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)

Yes No

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all security requirements for the project and personnel security requirements.

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below

(c) In summary, provide an overall rating for the work performed by this contractor.

8. SUSTAINABILITY

Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.)

Yes No

9. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.)

Yes No

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):