GFT - Glycol Feed Tank Cutsheet.pdf

PDF 282 KB Posted

Attached to
Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of Entry (LPOE), Alburg, Vermont
Solicitation number
47PB5126R0008
Issued by
Not on record

About this file

This is a product specification submittal document for a packaged glycol solution make-up unit (GMU560P/GMU560S) manufactured by Bell & Gossett. The specification requires furnish and installation of an automatic unit designed for closed-loop heating, chilled water, process, snowmelt, or radiant heat systems.

The unit shall include a 55-gallon HDPE polyethylene storage tank with removable lid, visible solution level scale in gallons and liters, 5-gallon accumulator tank (3-gallon fluid volume), VersiJet series diaphragm pump manufactured by FloJet, TENV motor, pressure relief valve, pressure reducing valve, y-strainer, isolation valve, and necessary interconnecting piping. The control panel must be NEMA 4X rated and include a motor contactor and control circuit with green indicator light for power status, separate light for pump run status, system on-off switch, and hand-off-auto switch. The pump shall start based on falling pressure and include low-level cutoff with red indicator light and horn alarm. The unit requires a single 115/1/60 VAC power connection and 3/4" MNPT system piping connection. Performance specifications include maximum flow of 6 GPM at open flow, maximum fill pressure of 60 PSI, cut-in range of 10-40 PSI, cut-out range of 20-60 PSI, and differential range of 10-30 PSI. The GMU560P model includes PVC pipe and fittings with maximum liquid temperature of 85°F, while the GMU560S includes metallic piping and fittings with maximum liquid temperature of 150°F. Both models feature a proximity sensor for low water cut-off and spun-welded connection on the suction side.

View the file

Other files

File Type Posted
27. Amendment 47PB5126R0008 0008 2026 07 13.pdf PDF
3. Agreement Rev 2 2026 06 18.pdf PDF
25. Amendment 47PB5126R0008 0007 2026 06 18.pdf PDF
6. WD VT20250027 2026 05 18.pdf PDF
1. Solicitation Rev 1_2026 06 11.pdf PDF
2. SF1442 Rev 1 dated 2026 06 15.pdf PDF
3. Agreement Rev 1 2026 06 12.pdf PDF
21. Amendment 47PB5126R0008 0006 2026 06 15.pdf PDF
20. Amendment 47PB5126R0008 0005 2026 06 02.pdf PDF
19. Amendment 47PB5126R0008 0004 2026 05 29.pdf PDF
16. Alburg Springs - Port Signage SOW-ASR 01.pdf PDF
15. Amendment 47PB5126R0008 0003 2026 05 21.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes_Rev 1 Amendment 0002_ 2026 05 15.pdf PDF
14. Amendment 47PB5126R0008 0002 2026 05 15.pdf PDF
13. Amendment 47PB5126R0008 0001 2026 05 12.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
RP - Vertical Radiant Panel Cutsheet.pdf PDF
RG - Return Grille Cutsheet.pdf PDF
SG - Supply Grille Cutsheet.pdf PDF
ET - Expansion Tank Cutsheet.pdf PDF
FT - Fin Tube Cutsheet.pdf PDF
BT - Buffer Tank Cutsheet.pdf PDF
FB - Filter Box Cutsheet.pdf PDF
PUH - Propeller Unit Heater Cutsheet.pdf PDF
GI and GR - Gravity Intake and Relief Cutsheet.pdf PDF
DH - Duct Mounted Humidifier Cutsheet.pdf PDF
SG and EG - Security Grille Cutsheet.pdf PDF
BSF - Booth Supply Fan Cut Sheet.pdf PDF
RP - Horizontal Radiant Panel Cutsheet.pdf PDF
AS - Air Separator Cutsheet.pdf PDF
EHC - Electric Heating Coil Cutsheet.pdf PDF
2026-02-06 Review of Proposed Renovations - Historic Context (1).pdf PDF
4. GSA527-21a 2026 04 15.pdf PDF
FCU - Fan Coil Unit Cutsheet.pdf PDF
6. WD VT20250027 2026 04 15.pdf PDF
CP and GP - Pump Cutsheets.pdf PDF
3. Agreement 2026 04 15.pdf PDF
EH - Electric Wall Heater Cutsheet.pdf PDF
7. PBS PPQ 2026 04 15.pdf PDF
GSHP - Ground Source Heat Pump Cutsheet.pdf PDF
L - Louver Cutsheet.pdf PDF
HP and CU - Heat Pump Mini-Split Cutsheet.pdf PDF
8. Tips on Preparing a Subcontracting Plan 2026 04 15.pdf PDF
HUM - Steam Humidifier Cutsheet.pdf PDF
Alburg Springs VT LPOE Code Report - 20260206 (1).pdf PDF
9. Model Subcontracting Plan 2026 04 15.docx DOCX document
5. Proprietary Information Agreement 2026 04 15.docx DOCX document
EF - Exhaust Fan Cutsheet.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL

BG-GMURD-SUB-516 R1

SPECIFICATION

Furnish and install as shown on the plans and specifications a packaged, automatic glycol solution make up unit model GMU560P/GMU560S as manufactured by Bell & Gossett or approved equal. The package shall consist of a base, polyethylene reservoir with removable lid, visible solution level scale in gallons and liters, y-strainer, isolation valve, pump, TENV motor, pressure relief valve, pressure reducing valve, expansion tank (5 gallon), discharge pressure gage, motor contactor and control circuit in a NEMA 4X panel, and necessary interconnecting piping. Green light shall indicate power supplied to the unit, an additional light shall indicate pump run status. The control panel shall also include a system on-off switch and hand-off-auto switch. Pump shall start based on falling pressure. System shall require a 115/1/60 single power connection and a 3/4" MNPT system piping connection. GMU shall provide up to 6 GPM at open flow and maintain a max fill pressure of 60 PSI. Unit includes low level cutout, with red indicator light and horn for alarm indication, to stop the pump during low level condition.

GMU560P (with PVC pipe and fittings):

- Pump: VersiJet series diaphragm pump manufactured by FloJet

- Tank: 55 gallon HDPE

- Accumulator Tank: 5 gallon (3 gallon fluid volume)

- Low Water Cut Off: proximity sensor

- Spun-welded connection on suction side

- Y-Strainer: pressure reducing valve, pressure relief valve included

- 3/4" MNPT system connection

JOB: REPRESENTATIVE:

UNIT TAG: DATE:

ENGINEER: DATE:

CONTRACTOR:

ORDER NUMBER:

SUBMITTED BY:

APPROVED BY: DATE:

Glycol Make-Up Unit

(GMU560P, GMU560S)

The Pressurized Solution for Closed-Hydronic Heating or Cooling Systems

DESCRIPTION

The Bell & Gossett Glycol Make-up Units, part numbers GMU560P and GMU560S, are automated systems designed to add water or a water-glycol mix to a closed loop heating, chilled water, process, snowmelt or radiant heat system.

Not for potable water use

GMU560S (with metallic piping and fittings):

- Pump: VersiJet series diaphragm pump manufactured by FloJet

- Tank: 55 gallon HDPE

- Accumulator Tank: 5 gallon (3 gallon fluid volume)

- Low Water Cut Off: proximity sensor

- Spun-welded connection on suction side

- Y-Strainer: pressure reducing valve, pressure relief valve included

- 3/4" MNPT system connection

Glycol Make-Up Unit (GF60) D-21-501-GMU-R2

Xylem Inc.

8200 N. Austin Avenue Morton Grove, IL 60053 Tel: (847) 966–3700 Fax: (847) 965–8379 www.xylem.com/bellgossett Xylem and Bell & Gossett are registered trademarks of Xylem Inc. or one of its subsidiaries. All other trademarks or registered trademarks are property of their respective owners.

© 2023 Xylem BG-GMURD-SUB-516 R1 April 2023

Learn more about the GMU

Max Flow 6 GPM (open flow)

Max Liquid Temperature GMU560P 85° F

GMU560S 150° F

Cut-In 10-40 PSI

Cut-Out 20-60 PSI

Differential Range 10-30 PSI

Power 115 VAC

Pump Glass filled nylon diaphragm pump

Discharge Port 3/4" MNPT

Storage Tank 55 gallon HDPE

Accumulator Tank 5 gallon (3 gallon fluid volume)

Specifications

Glycol Make-Up Unit (GMU560P, GMU560S) BG-GMURD-SUB-516 R1

File details come from the government source that posted it. Updated .