This is a Standard Form 1442 (SF 1442) – Solicitation, Offer, and Award for Construction, Alteration, or Repair work issued by the General Services Administration (GSA), Public Buildings Service (PBS).

The solicitation (47PB5126R0008) seeks a construction contractor for a Repair and Alteration (R&A) and Driveway Extension project at the Land Port of Entry (LPOE) in Alburg Springs, Vermont. The project employs a Design-Bid-Build (DBB) delivery method and will modernize the port to correct deficiencies and meet current standards per GSA and Customs and Border Protection (CBP) 2023 Land Port of Entry Design Standards. Major work includes installation of gates and guardrails for passenger and commercial lanes, a new officer inspection booth, interior upgrades including new floorplan, and new/upgraded mechanical, electrical, plumbing (MEP) and security systems. The driveway extension addresses security challenges by redirecting local traffic away from port entry/exit points. The project incorporates the existing Historic Facility, which is listed in the National Register of Historic Places, and the port will remain fully closed during construction. The contract includes four line items: (0001) Base Award construction, (0002) Option 1 – Driveway Extension, (0003) Port Closure Signage (electronic message board), and (0004) Option 2 – Inspection Booth. All items are Firm Fixed Price with a performance period of approximately 13 months (base award: 07/03/2026 – 08/31/2027). Sealed bids are due by 2:00 PM EST on 7/27/2026, with offers requiring 90 calendar days for Government acceptance. Performance and payment bonds are required within 7 calendar days of award. An offer guarantee is required. Contractors must begin performance within 10 calendar days of receiving notice to proceed.

View the file

Other files

File Type Posted
27. Amendment 47PB5126R0008 0008 2026 07 13.pdf PDF
3. Agreement Rev 2 2026 06 18.pdf PDF
25. Amendment 47PB5126R0008 0007 2026 06 18.pdf PDF
6. WD VT20250027 2026 05 18.pdf PDF
1. Solicitation Rev 1_2026 06 11.pdf PDF
3. Agreement Rev 1 2026 06 12.pdf PDF
21. Amendment 47PB5126R0008 0006 2026 06 15.pdf PDF
20. Amendment 47PB5126R0008 0005 2026 06 02.pdf PDF
19. Amendment 47PB5126R0008 0004 2026 05 29.pdf PDF
16. Alburg Springs - Port Signage SOW-ASR 01.pdf PDF
15. Amendment 47PB5126R0008 0003 2026 05 21.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes_Rev 1 Amendment 0002_ 2026 05 15.pdf PDF
14. Amendment 47PB5126R0008 0002 2026 05 15.pdf PDF
13. Amendment 47PB5126R0008 0001 2026 05 12.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
RP - Vertical Radiant Panel Cutsheet.pdf PDF
RG - Return Grille Cutsheet.pdf PDF
SG - Supply Grille Cutsheet.pdf PDF
ET - Expansion Tank Cutsheet.pdf PDF
FT - Fin Tube Cutsheet.pdf PDF
GFT - Glycol Feed Tank Cutsheet.pdf PDF
BT - Buffer Tank Cutsheet.pdf PDF
FB - Filter Box Cutsheet.pdf PDF
PUH - Propeller Unit Heater Cutsheet.pdf PDF
GI and GR - Gravity Intake and Relief Cutsheet.pdf PDF
DH - Duct Mounted Humidifier Cutsheet.pdf PDF
SG and EG - Security Grille Cutsheet.pdf PDF
BSF - Booth Supply Fan Cut Sheet.pdf PDF
RP - Horizontal Radiant Panel Cutsheet.pdf PDF
AS - Air Separator Cutsheet.pdf PDF
EHC - Electric Heating Coil Cutsheet.pdf PDF
2026-02-06 Review of Proposed Renovations - Historic Context (1).pdf PDF
4. GSA527-21a 2026 04 15.pdf PDF
FCU - Fan Coil Unit Cutsheet.pdf PDF
6. WD VT20250027 2026 04 15.pdf PDF
CP and GP - Pump Cutsheets.pdf PDF
3. Agreement 2026 04 15.pdf PDF
EH - Electric Wall Heater Cutsheet.pdf PDF
7. PBS PPQ 2026 04 15.pdf PDF
GSHP - Ground Source Heat Pump Cutsheet.pdf PDF
L - Louver Cutsheet.pdf PDF
HP and CU - Heat Pump Mini-Split Cutsheet.pdf PDF
8. Tips on Preparing a Subcontracting Plan 2026 04 15.pdf PDF
HUM - Steam Humidifier Cutsheet.pdf PDF
Alburg Springs VT LPOE Code Report - 20260206 (1).pdf PDF
9. Model Subcontracting Plan 2026 04 15.docx DOCX document
5. Proprietary Information Agreement 2026 04 15.docx DOCX document
EF - Exhaust Fan Cutsheet.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

47PB5126R0008

PBS Office of Acquisition Management/Capital Project Acquisition Delivery Division Capital Contracting Branch - Northeast 1800 F Street NW Washington , DC 20405 USA

The General Services Administration (GSA), Public Buildings Service (PBS) Office of Acquisition Management intends to hire a construction contractor for a Repair and Alteration (R&A) and Driveway Extension project at the Land Port of Entry (LPOE) in Alburg Springs, VT. The Driveway Extension will be included in the project as a contract option. The Government will utilize the Design-Bid-Build (DBB) delivery method. The main goal for this project is to provide a renovated LPOE with the addition of a driveway extension for CBP and GSA that will meet each agency’s requirements and allow for efficient operations. The R&A portion is needed to modernize the port, correct port deficiencies, and bring the LPOE up to current standards based on the Program of Requirements provided by GSA and CBP. The project will be completed in a way that will incorporate the existing Historic Facility, which is listed in the National Register of Historic Places. Major elements of the project will include gates and guardrails for primary passenger and commercial lanes, a new officer inspection booth, interior upgrades, such as all new floorplan, and new and upgraded MEP and Security. The driveway portion will address the security challenges at the LPOE with local traffic entering and exiting their residential properties directly in front of the port. The project shall adhere to the GSA PBS Core Building Standards and the Customs and Border Protection (CBP) 2023 Land Port of Entry Design Standard. The port will be fully closed during all construction activities.

EQPXCAA-26-0003

PQAA

Emily Jackson 5555555555

1 36/12/2026

7/27/2026

2:00 PM (EST)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

PQAA

PBS Office of Acquisition Management/Capital Project Acquisition Delivery Division Capital Contracting Branch - Northeast 1800 F Street NW Washington , DC 20405 USA

PBS Office of Acquisition Management/Capital Project Acquisition Delivery Division Capital Contracting Branch - Northeast 1800 F Street NW Washington , DC 20405 USA

Emily Jackson

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

0003 Port Closure Signage

AND SERVICE BUILDINGS

HIGHWAY ALBURG SPRINGS, VT 05440

RD ALBURG SPRINGS, VT 05440-0000

Deliverable

PSC: Y1AZ -- CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES

PSC: Y1AZ -- CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES

Deliverable

Place of Performance: VT0551BS LPOE, Alburg Springs US

Place of Performance: US BORDER STATION 303 ALBURG SPRINGS

Land Port of Entry is closed due to construction.

HIGHWAY ALBURG SPRINGS, VT 05440

RD ALBURG SPRINGS, VT 05440-0000

Deliverable

Alburg Springs LPOE Construction Base Award

Place of Performance: US BORDER STATION 303 ALBURG SPRINGS

Deliverable

PoP: 07/03/2026 - 08/31/2027

PoP: 09/01/2026 - 08/31/2027

Vt Route 78 to notify the public that the Alburg Springs

Place of Performance: VT0551BS LPOE, Alburg Springs US

Option 2 Inspection Booth

Option 1, Driveway Extension

Alburg Springs LPOE Construction Base Award

Contract Type: Firm Fixed Price

Contract Type: Firm Fixed Price message board at the intersection of Alburg Springs Road and

PoP: 07/03/2026 - 08/31/2027

PoP: 07/03/2026 - 08/31/2027

Option 2 Inspection Booth

AND SERVICE BUILDINGS

LS

Contract Type: Firm Fixed Price

Contract Type: Firm Fixed Price

AND SERVICE BUILDINGS

LS

Option 1, Driveway Extension LS

Port Closure Signage. Provide and install an electronic

LS

PSC: Y1AZ -- CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES

AND SERVICE BUILDINGS

PSC: Y1AZ -- CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES

File details come from the government source that posted it. Updated .