This is an Additional Services Request (ASR) for port closure signage at the U.S. Land Port of Entry in Alburg Springs, Vermont, issued under Solicitation No. 47PB5126R0008 with an effective date of May 14, 2026.

The contractor shall provide and install an electronic messaging board at the intersection of Vermont Route 78 and Alburg Springs Road, approximately 3 miles from the existing facility. The sign must be capable of displaying three rows of alphanumeric characters, with the Wanco Inc. Model WTLMB Message sign specified as the basis of design. The contractor is responsible for obtaining all necessary access requirements, easements, and permitting required for installation, coordinating with utility companies, local authorities (Alburg Springs Highway Department), Vermont Department of Transportation, and GSA. The contractor must maintain the sign in working order for the duration of the port closure project. The scope of work includes project management and coordination, right-of-way and easement acquisition, and providing the message board throughout the project duration. Work shall commence upon contract award and continue through project substantial completion, with proposals to be submitted as separate line items.

View the file

Other files

File Type Posted
27. Amendment 47PB5126R0008 0008 2026 07 13.pdf PDF
3. Agreement Rev 2 2026 06 18.pdf PDF
25. Amendment 47PB5126R0008 0007 2026 06 18.pdf PDF
6. WD VT20250027 2026 05 18.pdf PDF
1. Solicitation Rev 1_2026 06 11.pdf PDF
2. SF1442 Rev 1 dated 2026 06 15.pdf PDF
3. Agreement Rev 1 2026 06 12.pdf PDF
21. Amendment 47PB5126R0008 0006 2026 06 15.pdf PDF
20. Amendment 47PB5126R0008 0005 2026 06 02.pdf PDF
19. Amendment 47PB5126R0008 0004 2026 05 29.pdf PDF
15. Amendment 47PB5126R0008 0003 2026 05 21.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes_Rev 1 Amendment 0002_ 2026 05 15.pdf PDF
14. Amendment 47PB5126R0008 0002 2026 05 15.pdf PDF
13. Amendment 47PB5126R0008 0001 2026 05 12.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf PDF
RP - Vertical Radiant Panel Cutsheet.pdf PDF
RG - Return Grille Cutsheet.pdf PDF
SG - Supply Grille Cutsheet.pdf PDF
ET - Expansion Tank Cutsheet.pdf PDF
FT - Fin Tube Cutsheet.pdf PDF
GFT - Glycol Feed Tank Cutsheet.pdf PDF
BT - Buffer Tank Cutsheet.pdf PDF
FB - Filter Box Cutsheet.pdf PDF
PUH - Propeller Unit Heater Cutsheet.pdf PDF
GI and GR - Gravity Intake and Relief Cutsheet.pdf PDF
DH - Duct Mounted Humidifier Cutsheet.pdf PDF
SG and EG - Security Grille Cutsheet.pdf PDF
BSF - Booth Supply Fan Cut Sheet.pdf PDF
RP - Horizontal Radiant Panel Cutsheet.pdf PDF
AS - Air Separator Cutsheet.pdf PDF
EHC - Electric Heating Coil Cutsheet.pdf PDF
2026-02-06 Review of Proposed Renovations - Historic Context (1).pdf PDF
4. GSA527-21a 2026 04 15.pdf PDF
FCU - Fan Coil Unit Cutsheet.pdf PDF
6. WD VT20250027 2026 04 15.pdf PDF
CP and GP - Pump Cutsheets.pdf PDF
3. Agreement 2026 04 15.pdf PDF
EH - Electric Wall Heater Cutsheet.pdf PDF
7. PBS PPQ 2026 04 15.pdf PDF
GSHP - Ground Source Heat Pump Cutsheet.pdf PDF
L - Louver Cutsheet.pdf PDF
HP and CU - Heat Pump Mini-Split Cutsheet.pdf PDF
8. Tips on Preparing a Subcontracting Plan 2026 04 15.pdf PDF
HUM - Steam Humidifier Cutsheet.pdf PDF
Alburg Springs VT LPOE Code Report - 20260206 (1).pdf PDF
9. Model Subcontracting Plan 2026 04 15.docx DOCX document
5. Proprietary Information Agreement 2026 04 15.docx DOCX document
EF - Exhaust Fan Cutsheet.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Services Request 01

Port Closure Signage

U.S. Land Port of Entry, Alburg Springs, VT.

05/14/2026

PROJECT: Alburg Springs R&A, U.S. Land Port of Entry, Alburg Springs, VT

SOLICITATION NO: 47PB5126R0008

BACKGROUND

The existing facility is located approx. 3 miles from the intersection with Vermont Route

78. This project entails installing an electronic sign board at the intersection of VT Route

78 and Alburg Springs Road, which will notify the travelling public of the port closure at the Alburg Springs Land Port of Entry (LPOE).

Project Objectives:

● Provide and install an Electronic Messaging board capable of displaying three rows of alphanumeric characters for the duration of the project. Basis of Design is Wanco

Inc. Model WTLMB Message sign.

● Contractor to obtain all access requirements, easements, and permitting necessary for the installation of the sign.

● Maintain the sign in working order for the duration of the project.

GSA needs the awarded contractor to provide and install an electronic message board at the intersection of Alburg Springs Road and Vt Route 78 to notify the public that the Alburg

Springs Land Port of Entry is closed due to construction. The contractor will be responsible to all aspects of the sign including all maintenance requirements, easements and permitting needed for the duration of the port closure.

SCOPE OF WORK

This ASR shall include but not limited to:

The Contractor shall provide all services necessary to complete the project, including but not limited to:

1. Project Management and Coordination:

● Provide and install the message board.

● Provide regular maintenance as needed to ensure proper operation.

● Coordinate with all relevant stakeholders such as utility companies, local authorities, Alburg Springs Highway dept., VT Dept. of Transportation and GSA.

2. Right-of-Way and Easement Acquisition:

● Coordinate with all required entities to identify and secure all necessary easements or rights-of-way for the sign installation.

3. Project Schedule:

● The Contractor shall provide the message board for the duration of the project.

SCHEDULE

Proposal to GSA: Broken out as a separate line item

Commence: Upon award contract award

Completion: Project Substantial Completion.