6-BEH-FRM-607.SAW SBE Good Faith Effort Documentation Form.docx

DOCX document 131 KB Posted

Attached to
Southwest 96-inch Water Transmission Pipeline Project
Solicitation number
CIZ-DWU-26 003
Issued by
Dallas County, Texas

About this file

This is a Small Business Enterprise (SBE) Good Faith Effort Documentation Form (BEH-FRM-607.SAW) issued by the City of Dallas for the Southwest 96-inch Water Transmission Pipeline Project in Texas. The form is required from prime vendors who fail to meet contract-specific SBE participation goals or when requested by the City for compliance review. The project involves installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods, along with cathodic protection, electrical, instrumentation and controls work, and site restoration. Plans, specifications, and bid proposal spreadsheets were made available on the Bonfire platform on Friday, March 13, 2026, prior to 4:00 p.m., with Tracey Long, PE, serving as the project manager.

The form requires prime vendors to document commercially reasonable subcontracting opportunities, demonstrate intentional and adequate outreach to certified SBEs with a minimum seven-business-day response window, and provide evidence of support offered to SBEs during the bidding process. Vendors must attest that they did not artificially consolidate or restrict scopes of work, artificially limit subcontracting opportunities, and that all contacted SBEs hold active certification in the relevant NAICS codes. The form requires detailed documentation of SBE identification and segmentation, outreach efforts with timestamps, quote responses, cost justifications for rejections, and a certification statement confirming the accuracy of all information provided and compliance with Good Faith Effort requirements throughout the contract term.

View the file

Other files

File Type Posted
14-DWU-FRM-170-CS Request For Competitive Sealed Proposals 26 003.pdf PDF
23-Table 3 Subcontractors and Suppliers.pdf PDF
43-Table 10 Proposed Project Quality Control Managers.docx DOCX document
28-Table 8 Proposed Project Superintendents.pdf PDF
13-Form 25 Cement Preference Certification.pdf PDF
12-Conflict of Interest Questionnaire.pdf PDF
3-BEH-FRM-610.SAW SBE Subcontractor Intent Form.docx DOCX document
48-26 003 Bid Proposal Spreadsheet.xlsx XLSX spreadsheet
32-Table 12 Financial Information.pdf PDF
9-Sample Contract for Services.pdf PDF
7-BEH-FRM-604.SAW Local Participation Workforce Impact.docx DOCX document
10-BIDDERS AFFIDAVIT.pdf PDF
25-Table 5 Demonstation of Budget Performance.pdf PDF
40-Table 7 Proposed Project Managers.docx DOCX document
44-Table 11 Project Information for Key Personnel.docx DOCX document
11-Acknowledgement of Addendum.docx DOCX document
15-TWDB-0459.pdf PDF
21-Table 1 General Information.pdf PDF
24-Table 4 Current Projects and Projects Completed.pdf PDF
47-Table 13 Affidavits.docx DOCX document
36-Table 3 Subcontractors and Suppliers.docx DOCX document
37-Table 4 Current Projects and Projects Completed.docx DOCX document
27-Table 7 Proposed Project Managers.pdf PDF
42-Table 9 Proposed Project Safety Managers.docx DOCX document
34-Table 1 General Information.docx DOCX document
1-DRIVE Policy.pdf PDF
49-Volume I - Specifications - SWPL.pdf PDF
29-Table 9 Proposed Project Safety Managers.pdf PDF
19-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 5.pdf PDF
39-Table 6 Demonstration of On-Time Performance.docx DOCX document
20-26-003 SWPL Summit GST to Hwy 67 BID SET FULL BW.pdf PDF
26-Table 6 Demonstration of On-Time Performance.pdf PDF
46-Table 12 Financial Information.docx DOCX document
30-Table 10 Proposed Project Quality Control Managers.pdf PDF
17-26-003 SWP Summit GST to Hwy 67+Bid Set Specs Vol 3.pdf PDF
16-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 2.pdf PDF
45-Table 11 B Project Information for Key Personnel.docx DOCX document
35-Table 2 A B Contractors Approach.docx DOCX document
4-BEH-FRM-605.SAW SBE Utilization Plan Commitment to Local Eco Impact.docx DOCX document
38-Table 5 Demonstation of Budget Performance.docx DOCX document
2-BEH-FRM-602.SAW SBE Affidavit.docx DOCX document
33-Table 13 Affidavits.pdf PDF
22-Table 2 A B Contractors Approach.pdf PDF
5-BEH-FRM-606.SAW Engagement Score Past Commitment Form.docx DOCX document
8-BEH-FRM-609.SAW Prime Self Performance Declaration.docx DOCX document
18-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 4.pdf PDF
31-Table 11 Project Information for Key Personnel.pdf PDF
41-Table 8 Proposed Project Superintendents.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dallas Regional Inclusive Vendor Enterprise SBE Good Faith Effort Documentation Form

BEH-FRM-607.SAW

Prime Vendor Information

Prime Vendor Name:
Solicitation Title:
Solicitation Number:

Good Faith Effort (GFE) documentation is required only if a respondent does not meet the contract-specific SBE goal or when specifically requested by the City of Dallas for compliance review. This form is not required from respondents who meet or exceed the SBE goal at time of submission unless otherwise directed by the City.

Prime Attestations (check all that apply):

We evaluated commercially reasonable subcontracting opportunities consistent with DRIVE policy and did not artificially consolidate or restrict scopes of work.
☐
We did not artificially limit or withhold subcontracting opportunities in order to increase SBE prime self-performance. (If applicable)
☐
We verified that every SBE contacted holds active certification in the NAICS code for the scope of work for which they were contacted.
☐
We understand that only SBE firms performing under a Commercially Useful Function (CUF) may be counted toward the SBE goal.
☐

Identification & Segmentation of Subcontracting Opportunities The DRIVE Policy requires respondents to evaluate commercially reasonable subcontracting opportunities and segment work into economically feasible packages consistent with market availability and the contract-specific SBE goal.

A. Describe how your firm identified subcontracting opportunities:

B. Describe how scopes were segmented into economically feasible subcontracting packages:

C. Attach or summarize applicable portions of your SBE Team Make-Up and Trade Summary information.

Outreach to SBE’s: Notice and Response Window Respondents must demonstrate intentional, timely, and adequate outreach to available SBEs.

A. Minimum Response Window We provided at least 7 business days for SBEs to respond to our request for quotes.

(If fewer than 7 days, explanation required.)

☐
Explanation:

B. Information Provided

We provided SBEs with complete and accurate plans/specifications
☐
We provided written notice detailing scopes, deadlines, and points of contact
☐
We responded to SBE inquiries or requests for clarification
☐

C. Documentation Required Attach proof of outreach, such as:

· Email notices with timestamps

· Call logs (date/time)

· Screenshots or distribution lists

· Copies of bid solicitation requests

· Date range of outreach activity (first notice through final follow-up)

BEH-FRM-607.SAW

BEH-FRM-607.SAW Revision Date: 2026.03.01 Page 1 of 1 SBE Response & Quote Evaluation List all SBEs contacted for this solicitation and describe the outcome. (Add additional pages as needed.)

SBE Firm
Work Element
Date Contacted
Quote Received (Y/N)
Quote Amount
Reason Selected / Not Selected
Reason No Quote Received (if applicable)
Other Response Provided

BEH-FRM-607.SAW

BEH-FRM-607.SAW Revision Date: 2026.03.01 Page 1 of 1 If an SBE quote was rejected due to cost, indicate percentage difference from selected quote:

If SBE(s) not selected, provide justification:

(Examples: did not meet scope, materially higher cost, incomplete quote.)

Assistance Provided to SBE’s Respondents must demonstrate efforts to support SBEs in competing for subcontracting opportunities.

Check all that apply:

Provided bonding or insurance guidance
☐
Provided clarification of plans or specifications
☐
Offered flexible scheduling or phased work
☐
Assisted with supplier or material sourcing
☐
Broke out work into smaller components to increase opportunity
☐
Other:
☐

Provide narrative summary:

Summary of Good Faith Efforts Provide a brief summary explaining the proposed SBE participation percentage and how it compares to the contract-specific SBE goal.

If the goal is not met, describe the specific impediments encountered despite genuine outreach:

Certification I certify that:

· The information provided in this Good Faith Effort Form is true and correct;

· Our firm did not artificially reduce subcontracting opportunities;

· All SBEs listed were contacted for scopes matching their certified NAICS codes;

· All work proposed for SBE participation will be performed under a CUF; and

· Documentation attached is accurate and complete.

We understand that Good Faith Efforts and SBE participation commitments are subject to monitoring and compliance review throughout the life of the contract.

Officer Signature:

Printed Name:
Title:
Date:

BEH-FRM-607.SAW Revision Date: 2026.03.01 Page 1 of 1 image1.png