About this file

This is a Small Business Enterprise (SBE) Subcontractor Intent Form issued by the City of Dallas Business Enterprise Hub (BEH) for the Southwest 96-inch Water Transmission Pipeline Project located in Texas. The form documents the prime vendor's commitment to subcontract with a certified SBE for specific goods, services, or work elements on the project. The project involves the installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods, along with cathodic protection, electrical, instrumentation and controls for electrically actuated valves, and site and paving restoration. Plans, specifications, and bid proposal spreadsheets are available on the Bonfire platform at https://dallascityhall.bonfirehub.com/ as of Friday, March 13, 2026, prior to 4:00 p.m., with Tracey Long, PE, serving as the Project Manager.

The form requires the SBE subcontractor to be currently certified by an approved agency such as the DFW Business Council, North Central Texas Regional Certification Agency, or Women's Business Council SW, with a valid certification number and expiration date that must remain current throughout the contract duration. The SBE vendor must perform work within its certified NAICS code(s) under a Commercially Useful Function using its own workforce and supervision, with only such work counting toward the SBE participation goal specified in the solicitation. Any reduction, substitution, or reallocation of the subcontractor's scope, value, or percentage participation requires prior BEH approval, and failure to comply with DRIVE policy requirements may result in adjustment of SBE participation credit or other contractual remedies. Both the prime vendor and SBE subcontractor must certify the accuracy of the information and their commitment to the stated participation terms, subject to BEH approval and compliance monitoring.

View the file

Other files

File Type Posted
14-DWU-FRM-170-CS Request For Competitive Sealed Proposals 26 003.pdf PDF
6-BEH-FRM-607.SAW SBE Good Faith Effort Documentation Form.docx DOCX document
23-Table 3 Subcontractors and Suppliers.pdf PDF
43-Table 10 Proposed Project Quality Control Managers.docx DOCX document
28-Table 8 Proposed Project Superintendents.pdf PDF
13-Form 25 Cement Preference Certification.pdf PDF
12-Conflict of Interest Questionnaire.pdf PDF
48-26 003 Bid Proposal Spreadsheet.xlsx XLSX spreadsheet
32-Table 12 Financial Information.pdf PDF
9-Sample Contract for Services.pdf PDF
7-BEH-FRM-604.SAW Local Participation Workforce Impact.docx DOCX document
10-BIDDERS AFFIDAVIT.pdf PDF
25-Table 5 Demonstation of Budget Performance.pdf PDF
40-Table 7 Proposed Project Managers.docx DOCX document
44-Table 11 Project Information for Key Personnel.docx DOCX document
11-Acknowledgement of Addendum.docx DOCX document
15-TWDB-0459.pdf PDF
21-Table 1 General Information.pdf PDF
24-Table 4 Current Projects and Projects Completed.pdf PDF
47-Table 13 Affidavits.docx DOCX document
36-Table 3 Subcontractors and Suppliers.docx DOCX document
37-Table 4 Current Projects and Projects Completed.docx DOCX document
27-Table 7 Proposed Project Managers.pdf PDF
42-Table 9 Proposed Project Safety Managers.docx DOCX document
34-Table 1 General Information.docx DOCX document
1-DRIVE Policy.pdf PDF
49-Volume I - Specifications - SWPL.pdf PDF
29-Table 9 Proposed Project Safety Managers.pdf PDF
19-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 5.pdf PDF
39-Table 6 Demonstration of On-Time Performance.docx DOCX document
20-26-003 SWPL Summit GST to Hwy 67 BID SET FULL BW.pdf PDF
26-Table 6 Demonstration of On-Time Performance.pdf PDF
46-Table 12 Financial Information.docx DOCX document
30-Table 10 Proposed Project Quality Control Managers.pdf PDF
17-26-003 SWP Summit GST to Hwy 67+Bid Set Specs Vol 3.pdf PDF
16-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 2.pdf PDF
45-Table 11 B Project Information for Key Personnel.docx DOCX document
35-Table 2 A B Contractors Approach.docx DOCX document
4-BEH-FRM-605.SAW SBE Utilization Plan Commitment to Local Eco Impact.docx DOCX document
38-Table 5 Demonstation of Budget Performance.docx DOCX document
2-BEH-FRM-602.SAW SBE Affidavit.docx DOCX document
33-Table 13 Affidavits.pdf PDF
22-Table 2 A B Contractors Approach.pdf PDF
5-BEH-FRM-606.SAW Engagement Score Past Commitment Form.docx DOCX document
8-BEH-FRM-609.SAW Prime Self Performance Declaration.docx DOCX document
18-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 4.pdf PDF
31-Table 11 Project Information for Key Personnel.pdf PDF
41-Table 8 Proposed Project Superintendents.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dallas Regional Inclusive Vendor Enterprise SBE Subcontractor Intent Form

BEH-FRM-610.SAW

TO:
City of Dallas – Business Enterprise Hub (BEH)
DATE:
Project Name:
Solicitation#
intends to enter contract with:
,

Small Business Enterprise (SBE) Subcontracting Vendor (legal name)

Prime Vendor (legal name)

to provide the following good(s)/service/work element(s):

Under NAICS code(s): , for which company is certified to perform.

SBE vendor is currently certified by the following agency (select one):

DFW Business Council: ☐ North Central Texas Regional Certification Agency: ☐ Women’s Business Council SW ☐

Other:
☐If other, provide certification agency name:
SBE Vendor Certification Number:
#
Certification Expiration Date:

Certification must be kept current / valid for the entire duration of this contract. Failure to comply with this provision could be subject to removal from contract.

For the purpose of SBE subcontracting participation, the City of Dallas does not include amounts paid to the prime by the sub-contractor.

Prime Vendor’s Total Contract Amount:
$
Contract-Specific SBE goal per solicitation:
%
SBE Vendor’s Participation Amount:
$
SBE Vendor’s Percentage of Total Contract:
%

Prime & Subcontractor Acknowledgments

· The Prime Vendor affirms its intent to subcontract with the SBE identified herein, conditioned upon award.

· The SBE subcontractor affirms it will perform the identified scope under a Commercially Useful Function (CUF), within its certified NAICS code(s), and using its own workforce and supervision.

· Only work performed within certified NAICS code(s) and under a CUF may be counted toward the SBE goal.

· Any reduction, substitution, or reallocation of the subcontractor’s scope, value, or percentage participation requires prior BEH approval.

Failure to comply with DRIVE policy requirements may result in adjustment of SBE participation credit or other actions permitted under City policy.

By signing below, the Prime Vendor and SBE Subcontractor certify that the information provided in this Intent Form is accurate and reflects their commitment for purposes of SBE participation, subject to BEH approval and compliance monitoring.

Prime Vendor – Officer’s SignaturePrinted NameTitleDate
SBE Vendor – Officer’s SignaturePrinted NameTitleDate
BEH-FRM-610.SAWRevision Date: 2026.03.01Page 1 of 1

image1.png

File details come from the government source that posted it. Updated .