45-Table 11 B Project Information for Key Personnel.docx

DOCX document 26 KB Posted

Attached to
Southwest 96-inch Water Transmission Pipeline Project
Solicitation number
CIZ-DWU-26 003
Issued by
Dallas County, Texas

About this file

This is a project information documentation form for key personnel related to a water infrastructure construction project in Texas. The Southwest 96-inch Water Transmission Pipeline Project, managed by Project Manager Tracey Long, PE, involves the installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods. The project scope includes cathodic protection, electrical systems, instrumentation and controls for electrically actuated valves, site restoration, and paving work with all appurtenances. Plans, specifications, and bid proposal spreadsheets became available on the Bonfire platform at https://dallascityhall.bonfirehub.com/ beginning Friday, March 13, 2026, at 4:00 p.m.

The form itself functions as a standardized template requiring bidders to provide comprehensive project history documentation for all key personnel and their organizations. Bidders must submit detailed information on projects completed within the last five years, including project budgets, schedules, performance metrics, original contract prices, change orders, actual completion dates, and staffing assignments. The form requests identification of key project personnel (project manager, superintendent, safety manager, and quality control manager) with their time commitments and continuity on projects, along with reference contact information for owners, designers, construction managers, and sureties. Additionally, bidders must disclose any issues or disputes resolved or pending through arbitration, litigation, or dispute review boards, specifying the number and financial amounts involved.

View the file

Other files

File Type Posted
14-DWU-FRM-170-CS Request For Competitive Sealed Proposals 26 003.pdf PDF
6-BEH-FRM-607.SAW SBE Good Faith Effort Documentation Form.docx DOCX document
23-Table 3 Subcontractors and Suppliers.pdf PDF
43-Table 10 Proposed Project Quality Control Managers.docx DOCX document
28-Table 8 Proposed Project Superintendents.pdf PDF
13-Form 25 Cement Preference Certification.pdf PDF
12-Conflict of Interest Questionnaire.pdf PDF
3-BEH-FRM-610.SAW SBE Subcontractor Intent Form.docx DOCX document
48-26 003 Bid Proposal Spreadsheet.xlsx XLSX spreadsheet
32-Table 12 Financial Information.pdf PDF
9-Sample Contract for Services.pdf PDF
7-BEH-FRM-604.SAW Local Participation Workforce Impact.docx DOCX document
10-BIDDERS AFFIDAVIT.pdf PDF
25-Table 5 Demonstation of Budget Performance.pdf PDF
40-Table 7 Proposed Project Managers.docx DOCX document
44-Table 11 Project Information for Key Personnel.docx DOCX document
11-Acknowledgement of Addendum.docx DOCX document
15-TWDB-0459.pdf PDF
21-Table 1 General Information.pdf PDF
24-Table 4 Current Projects and Projects Completed.pdf PDF
47-Table 13 Affidavits.docx DOCX document
36-Table 3 Subcontractors and Suppliers.docx DOCX document
37-Table 4 Current Projects and Projects Completed.docx DOCX document
27-Table 7 Proposed Project Managers.pdf PDF
42-Table 9 Proposed Project Safety Managers.docx DOCX document
34-Table 1 General Information.docx DOCX document
1-DRIVE Policy.pdf PDF
49-Volume I - Specifications - SWPL.pdf PDF
29-Table 9 Proposed Project Safety Managers.pdf PDF
19-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 5.pdf PDF
39-Table 6 Demonstration of On-Time Performance.docx DOCX document
20-26-003 SWPL Summit GST to Hwy 67 BID SET FULL BW.pdf PDF
26-Table 6 Demonstration of On-Time Performance.pdf PDF
46-Table 12 Financial Information.docx DOCX document
30-Table 10 Proposed Project Quality Control Managers.pdf PDF
17-26-003 SWP Summit GST to Hwy 67+Bid Set Specs Vol 3.pdf PDF
16-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 2.pdf PDF
35-Table 2 A B Contractors Approach.docx DOCX document
4-BEH-FRM-605.SAW SBE Utilization Plan Commitment to Local Eco Impact.docx DOCX document
38-Table 5 Demonstation of Budget Performance.docx DOCX document
2-BEH-FRM-602.SAW SBE Affidavit.docx DOCX document
33-Table 13 Affidavits.pdf PDF
22-Table 2 A B Contractors Approach.pdf PDF
5-BEH-FRM-606.SAW Engagement Score Past Commitment Form.docx DOCX document
8-BEH-FRM-609.SAW Prime Self Performance Declaration.docx DOCX document
18-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 4.pdf PDF
31-Table 11 Project Information for Key Personnel.pdf PDF
41-Table 8 Proposed Project Superintendents.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 11— (Cont.) Project Information for Key Personnel

Name of Organization

Provide information on all projects completed by the Organization within the last 5 years.

Project Owner

Project Name

General Description of Project:

Project Budget and Schedule Performance

Budget History
Amount
% of Bid

Amount

Schedule Performance
Date
Days

Original Contract Price

Notice to Proceed

Change Orders

Contract Substantial Completion Date at Notice to Proceed

Owner Enhancements

Contract Final Completion Date at Notice to Proceed

Unforeseen Conditions

Change Order Authorized Substantial Completion Date

Design Issues

Change Order Authorized Final Completion Date

Total

Actual / Estimated Substantial Completion Date

Final Cost

Actual / Estimated Final Completion Date

Key Project Personnel

Project Manager
Project Superintendent
Safety Manager
Quality Control

Manager

Name

Percentage of time devoted to the project.

Percentage of time proposed for this Project.

Did Individual start and complete the project?

If not, who started or completed the project in their place?

Reason for change?

Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)

Name
Title/Position
Organization
Telephone
Email

Owner

Designer

Construction Manager

Surety

Issues / disputes resolved or pending resolution by arbitration, litigation, or dispute review boards

Number of issues resolved

Total amount involved in resolved issues

Number of issues pending

Total amount involved in issues pending

File details come from the government source that posted it. Updated .