46-Table 12 Financial Information.docx

DOCX document 17 KB Posted

Attached to
Southwest 96-inch Water Transmission Pipeline Project
Solicitation number
CIZ-DWU-26 003
Issued by
Dallas County, Texas

About this file

This is a financial information submission form for offerors responding to the Southwest 96-inch Water Transmission Pipeline Project in Texas. The project involves the installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using a combination of open cut and tunneling methods. The scope also includes cathodic protection systems, electrical work, instrumentation and controls for electrically actuated valves, site restoration, and paving. Plans, specifications, and the bid proposal spreadsheet became available on the Bonfire platform at https://dallascityhall.bonfirehub.com/ on Friday, March 13, 2026 prior to 4:00 p.m. The project manager is Tracey Long, PE.

Offerors are required to submit comprehensive financial documentation including the date of their most current financial statement and audited financial statement, along with key financial indicators such as current ratio and quick ratio calculations. Vendors must provide complete financial statements for fiscal years 2024 and 2025, including income statement data (revenues, cost of goods sold, and operating expenses) and balance sheet information (current assets, other assets, current liabilities, and other liabilities), all in thousands of dollars. Additionally, offerors must submit a letter from their insurance provider confirming commitment to provide the types of coverage specified in the contract's General and Supplementary Conditions, and a letter from a surety confirming commitment to provide performance and payment bonds as specified in those same conditions.

View the file

Other files

File Type Posted
14-DWU-FRM-170-CS Request For Competitive Sealed Proposals 26 003.pdf PDF
6-BEH-FRM-607.SAW SBE Good Faith Effort Documentation Form.docx DOCX document
23-Table 3 Subcontractors and Suppliers.pdf PDF
43-Table 10 Proposed Project Quality Control Managers.docx DOCX document
28-Table 8 Proposed Project Superintendents.pdf PDF
13-Form 25 Cement Preference Certification.pdf PDF
12-Conflict of Interest Questionnaire.pdf PDF
3-BEH-FRM-610.SAW SBE Subcontractor Intent Form.docx DOCX document
48-26 003 Bid Proposal Spreadsheet.xlsx XLSX spreadsheet
32-Table 12 Financial Information.pdf PDF
9-Sample Contract for Services.pdf PDF
7-BEH-FRM-604.SAW Local Participation Workforce Impact.docx DOCX document
10-BIDDERS AFFIDAVIT.pdf PDF
25-Table 5 Demonstation of Budget Performance.pdf PDF
40-Table 7 Proposed Project Managers.docx DOCX document
44-Table 11 Project Information for Key Personnel.docx DOCX document
11-Acknowledgement of Addendum.docx DOCX document
15-TWDB-0459.pdf PDF
21-Table 1 General Information.pdf PDF
24-Table 4 Current Projects and Projects Completed.pdf PDF
47-Table 13 Affidavits.docx DOCX document
36-Table 3 Subcontractors and Suppliers.docx DOCX document
37-Table 4 Current Projects and Projects Completed.docx DOCX document
27-Table 7 Proposed Project Managers.pdf PDF
42-Table 9 Proposed Project Safety Managers.docx DOCX document
34-Table 1 General Information.docx DOCX document
1-DRIVE Policy.pdf PDF
49-Volume I - Specifications - SWPL.pdf PDF
29-Table 9 Proposed Project Safety Managers.pdf PDF
19-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 5.pdf PDF
39-Table 6 Demonstration of On-Time Performance.docx DOCX document
20-26-003 SWPL Summit GST to Hwy 67 BID SET FULL BW.pdf PDF
26-Table 6 Demonstration of On-Time Performance.pdf PDF
30-Table 10 Proposed Project Quality Control Managers.pdf PDF
17-26-003 SWP Summit GST to Hwy 67+Bid Set Specs Vol 3.pdf PDF
16-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 2.pdf PDF
45-Table 11 B Project Information for Key Personnel.docx DOCX document
35-Table 2 A B Contractors Approach.docx DOCX document
4-BEH-FRM-605.SAW SBE Utilization Plan Commitment to Local Eco Impact.docx DOCX document
38-Table 5 Demonstation of Budget Performance.docx DOCX document
2-BEH-FRM-602.SAW SBE Affidavit.docx DOCX document
33-Table 13 Affidavits.pdf PDF
22-Table 2 A B Contractors Approach.pdf PDF
5-BEH-FRM-606.SAW Engagement Score Past Commitment Form.docx DOCX document
8-BEH-FRM-609.SAW Prime Self Performance Declaration.docx DOCX document
18-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 4.pdf PDF
31-Table 11 Project Information for Key Personnel.pdf PDF
41-Table 8 Proposed Project Superintendents.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 12—Financial Information Financial Summary Information for Offeror

Date of Offeror’s most current financial statement

Date of Offeror’s most current audited financial statement

Financial indicators from the most current financial statement:

Offeror’s Current Ratio (Current Assets / Current Liabilities)

Offeror’s Quick Ratio ((Cash and Cash Equivalents + Accounts Receivable + Short Term Investments) / Current Liabilities))

Describe the resources that are available to the Offeror to provide adequate cash flow for the project if Offeror’s Current Ratio or Quick Ratio are less than 1.0:

Table 12 – Financial Information (Continued)

10. Complete the key financial information from the financial statements.

Key Financials (in thousands)
FY 2024
FY 2025

From Income Statement

Revenues

Cost of Goods Sold (COGS)

Operating Expenses

From Balance Sheet

Current Assets

Other Assets

Current Liabilities

Other Liabilities

11. Provide financial statements, for years 2024 and 2025, showing the name and address of the firm preparing the financial statements and the date of preparation.

Attachment No.

12. Provide a letter from the insurance provider stating the provider's commitment to insure the Contractor for the types of coverages specified in the General and Supplementary Conditions, if awarded the Contract.

Attachment No.

13. Provide a letter from the surety stating commitment to provide the performance and payment bonds specified in the General and Supplementary Conditions, if awarded the Contract.

Attachment No.

File details come from the government source that posted it. Updated .