2-BEH-FRM-602.SAW SBE Affidavit.docx

DOCX document 116 KB Posted

Attached to
Southwest 96-inch Water Transmission Pipeline Project
Solicitation number
CIZ-DWU-26 003
Issued by
Dallas County, Texas

About this file

This is a Small Business Enterprise (SBE) Affidavit form issued by the City of Dallas under its Dallas Regional Inclusive Vendor Enterprise (DRIVE) Policy for the Southwest 96-inch Water Transmission Pipeline Project in Texas. The project involves installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods, along with cathodic protection, electrical systems, instrumentation and controls for electrically actuated valves, and site and paving restoration. Plans, specifications, and bid proposal spreadsheets are available on Bonfire at https://dallascityhub.bonfirehub.com/ beginning Friday, March 13, 2026 prior to 4:00 p.m. The project manager is Tracey Long, PE.

The affidavit establishes SBE participation requirements and aspirational benchmarks by procurement category, including 33% for Goods and Construction, 34% for Architecture & Engineering, 38% for Professional Services, and 30% for Other Services. Contract-specific SBE goals are determined through marketplace research and historical participation data. Respondents must commit to subcontracting with Small Business Enterprises that perform a Commercially Useful Function (CUF) using their own labor and resources. Any changes to SBE subcontractors require submission of revised forms BEH-FRM-603.SAW and BEH-FRM-501.PAC for Business Enterprise Hub approval prior to implementation. Both prime vendors and all subcontractors are subject to monthly compliance audits through the City of Dallas Compliance System at https://dallas.gob2g.com/, with designated points of contact required throughout the contract term. Misrepresentation of CUF performance, participation, certification status, or vendor location may result in corrective actions or sanctions.

View the file

Other files

File Type Posted
14-DWU-FRM-170-CS Request For Competitive Sealed Proposals 26 003.pdf PDF
6-BEH-FRM-607.SAW SBE Good Faith Effort Documentation Form.docx DOCX document
23-Table 3 Subcontractors and Suppliers.pdf PDF
43-Table 10 Proposed Project Quality Control Managers.docx DOCX document
28-Table 8 Proposed Project Superintendents.pdf PDF
13-Form 25 Cement Preference Certification.pdf PDF
12-Conflict of Interest Questionnaire.pdf PDF
3-BEH-FRM-610.SAW SBE Subcontractor Intent Form.docx DOCX document
48-26 003 Bid Proposal Spreadsheet.xlsx XLSX spreadsheet
32-Table 12 Financial Information.pdf PDF
9-Sample Contract for Services.pdf PDF
7-BEH-FRM-604.SAW Local Participation Workforce Impact.docx DOCX document
10-BIDDERS AFFIDAVIT.pdf PDF
25-Table 5 Demonstation of Budget Performance.pdf PDF
40-Table 7 Proposed Project Managers.docx DOCX document
44-Table 11 Project Information for Key Personnel.docx DOCX document
11-Acknowledgement of Addendum.docx DOCX document
15-TWDB-0459.pdf PDF
21-Table 1 General Information.pdf PDF
24-Table 4 Current Projects and Projects Completed.pdf PDF
47-Table 13 Affidavits.docx DOCX document
36-Table 3 Subcontractors and Suppliers.docx DOCX document
37-Table 4 Current Projects and Projects Completed.docx DOCX document
27-Table 7 Proposed Project Managers.pdf PDF
42-Table 9 Proposed Project Safety Managers.docx DOCX document
34-Table 1 General Information.docx DOCX document
1-DRIVE Policy.pdf PDF
49-Volume I - Specifications - SWPL.pdf PDF
29-Table 9 Proposed Project Safety Managers.pdf PDF
19-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 5.pdf PDF
39-Table 6 Demonstration of On-Time Performance.docx DOCX document
20-26-003 SWPL Summit GST to Hwy 67 BID SET FULL BW.pdf PDF
26-Table 6 Demonstration of On-Time Performance.pdf PDF
46-Table 12 Financial Information.docx DOCX document
30-Table 10 Proposed Project Quality Control Managers.pdf PDF
17-26-003 SWP Summit GST to Hwy 67+Bid Set Specs Vol 3.pdf PDF
16-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 2.pdf PDF
45-Table 11 B Project Information for Key Personnel.docx DOCX document
35-Table 2 A B Contractors Approach.docx DOCX document
4-BEH-FRM-605.SAW SBE Utilization Plan Commitment to Local Eco Impact.docx DOCX document
38-Table 5 Demonstation of Budget Performance.docx DOCX document
33-Table 13 Affidavits.pdf PDF
22-Table 2 A B Contractors Approach.pdf PDF
5-BEH-FRM-606.SAW Engagement Score Past Commitment Form.docx DOCX document
8-BEH-FRM-609.SAW Prime Self Performance Declaration.docx DOCX document
18-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 4.pdf PDF
31-Table 11 Project Information for Key Personnel.pdf PDF
41-Table 8 Proposed Project Superintendents.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dallas Regional Inclusive Vendor Enterprise Small Business Enterprise (SBE) Affidavit

BEH-FRM-602.SAW

Solicitation Name:
Solicitation #:

Prime Vendor Information

Prime Vendor Legal Business Name:
Headquarters (HQ) Address:
City:
State:
County:
Local Office Address (if different than HQ):
City:
State:
County:
Primary Contact Name:
Title:
Email:
Phone:

SBE Program Acknowledgement It is the policy of the City of Dallas to promote contracting and broaden opportunities for small businesses through the Dallas Regional Inclusive Vendor Enterprise (DRIVE) Policy, adopted by City Council under Council Resolution #25-1879. All respondents to City solicitations are required to support the City’s goals of increasing small business participation, strengthening the regional vendor marketplace, and advancing economic impact across Dallas and the Dallas–Fort Worth–Arlington Metropolitan Statistical Area (MSA).

The respondent acknowledges that the City establishes two types of SBE goals under the DRIVE Policy: (1) annual aspirational SBE benchmarks by procurement category, and (2) contract-specific SBE subcontracting goals.

Aspirational benchmarks represent the City’s overall, program-wide participation goals for major procurement categories such as Goods, Construction, Architecture & Engineering, Professional Services, and Other Services. These benchmarks are based on regional marketplace conditions and may be adjusted periodically. They are used to measure the City’s overall progress in advancing small business participation.

Category
Aspirational Benchmark Goal
Category
Aspirational Benchmark Goal
Goods
33%
Architecture & Engineering (A/E)
34%
Construction
33%
Professional Services
38%
Other Services
30%

The City updates these benchmarks periodically based on market availability, utilization data, and regional capacity. The respondent is responsible for complying with the most current benchmarks as published or referenced in the solicitation.

Contract-specific SBE goals are tailored for each solicitation and reflect the availability of ready, willing, and able SBE firms for the scopes, trades, and disciplines included in that contract. The Business Enterprise Hub (BEH) uses marketplace research, availability analysis, and historical participation data to determine these goals. Contract-specific goals may be higher or lower than the aspirational benchmarks depending on the opportunities associated with the specific solicitation.

By signing this Affidavit, the respondent acknowledges receipt of the SBE Program requirements, including the annual aspirational benchmarks and any contract-specific SBE goals established for this procurement. The respondent further affirms responsibility for submitting accurate and truthful information regarding SBE participation, subcontractor commitments, SBE self-performance (if applicable), and any documentation required to demonstrate good-faith efforts under the DRIVE Policy.

Subcontracting, CUF Obligation, & Change of Sub Requirements The respondent understands that the SBE subcontracting commitments submitted with their solicitation response constitute material representations of intent. Only the work performed by subcontractors who execute a Commercially Useful Function (CUF) including managing, supervising, and performing their contracted scope of work with their own labor and resources may be counted toward SBE participation.

Any proposed change involving SBE subcontractors including reductions in scope, reassignment of work, substitution, or removal requires prior submission of:

(1) a revised BEH-FRM-603.SAW — Schedule of Work and Actual Payment, and

(2) a BEH-FRM-501.PAC — Change of SBE Subcontractor Request Form to the Business Enterprise Hub (BEH) for review and approval before any change may be implemented. Work shall not proceed under a modified subcontracting arrangement until written approval is issued by BEH.

Misrepresentation of CUF performance, subcontractor participation, certification status, or vendor location may result in corrective actions or sanctions consistent with City policy.

Monthly Compliance & Auditing Reporting The respondent acknowledges that the City conducts monthly compliance audits through its designated City of Dallas Compliance System [https://dallas.gob2g.com/]. Both the Prime and all subcontractors are required to respond to audit inquiries, including payment verification, CUF confirmation, and progress reporting.

A designated point of contact must be identified and updated throughout the contract term.

Failure to provide timely audit responses may result in payment delays, adjustments to SBE participation, corrective actions, or impacts to future contract eligibility.

Audit Reporting Point-of-Contact (POC):

Name:
Phone:
Email:

Affidavit & Certification By signing below, I certify that all information provided in this Affidavit and accompanying documentation is true and complete. I further acknowledge and will comply with the requirements of the DRIVE Policy and Program.

Officer Signature:

Printed Name:
Title:
Date:

BEH-FRM-602.SAW Revision Date: 2026.03.01 Page 1 of 1 image1.png

File details come from the government source that posted it. Updated .