24-Table 4 Current Projects and Projects Completed.pdf
PDF 137 KB Posted
- Solicitation number
- CIZ-DWU-26 003
- Issued by
- Dallas County, Texas
About this file
This is a project history documentation file used by a Texas municipality in connection with the Southwest 96-inch Water Transmission Pipeline Project. The document is formatted as Table 4, a standardized template designed to capture current and recently completed projects within a ten-year lookback period. The table structure requires bidders or contractors to document project details including project owner, project name, general description, project cost, completion date, and key personnel across multiple project entries. For each project listed, the template requires identification of the project manager, superintendent, safety manager, and quality control manager, along with reference contact information for the owner, designer, and construction manager, with explicit notation that named individuals have approved contact.
The Southwest 96-inch Water Transmission Pipeline Project itself involves installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using combined open cut and tunneling construction methods. The scope includes cathodic protection systems, electrical infrastructure, instrumentation and controls for electrically actuated valves, and site and paving restoration. Plans, specifications, and bid proposal spreadsheets are available through the Bonfire procurement platform at https://dallascityhall.bonfirehub.com/ with a release date of Friday, March 13, 2026 at 4:00 p.m. The project manager is Tracey Long, PE.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 4—Current Projects and Project Completed within the last 10 Years Name of Organization Project Owner Project Name General Description of Project
Project Cost Date Project Completed
Key Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager Name Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email Owner Designer Construction Manager
Project Owner Project Name General Description of Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email Owner Designer Construction Manager
Project Owner Project Name General Description of Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email Owner Designer Construction Manager
File details come from the government source that posted it. Updated .