This is a subcontractor and supplier disclosure form for the Southwest 96-inch Water Transmission Pipeline Project in Texas. The project involves the installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods. Additional work includes cathodic protection systems, electrical installations, instrumentation and controls for electrically actuated valves, site restoration, and paving. Plans, specifications, and bid proposal spreadsheets were made available on the Bonfire platform on Friday, March 13, 2026, prior to 4:00 p.m. Tracey Long, PE, serves as the Project Manager.
The form requires bidders to provide a list of subcontractors contributing more than five percent of the proposed contract price, including the work to be provided and estimated percentage of the contract price. Bidders must also submit a list of major equipment and material suppliers for the project, indicating whether suppliers will furnish materials only or furnish and install materials. This disclosure requirement ensures transparency regarding the subcontracting and supply chain structure supporting the bid proposal.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 3 – Subcontractors and Suppliers
2. Subcontractors and Suppliers
Subcontractors
Provide a list of subcontractors that will provide more than five (5) percent of the Work (based on the proposed Contract Price).
| Name |
| Work to be Provided |
| Estimated Percentage of the Proposed Contract Price |
Suppliers
Provide a list of major equipment or material suppliers proposed for this project. Attach additional information if necessary.
| Supplier Name |
| Equipment/Material to be Provided |
| Furnish Only |
| Furnish and Install |