23-Table 3 Subcontractors and Suppliers.pdf
PDF 80 KB Posted
- Solicitation number
- CIZ-DWU-26 003
- Issued by
- Dallas County, Texas
About this file
This file is a Subcontractors and Suppliers disclosure form for the Southwest 96-inch Water Transmission Pipeline Project in Texas. The project involves the installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods. The scope also includes cathodic protection systems, electrical work, instrumentation and controls for electrically actuated valves, site restoration, and paving. Plans, specifications, and bid proposal spreadsheets became available through Bonfire on March 13, 2026, prior to 4:00 p.m. The project manager is Tracey Long, PE.
Bidders must identify all subcontractors that will provide more than five percent of the work based on the proposed contract price, including the name of each subcontractor and the specific work to be provided with the estimated percentage of contract value. Additionally, bidders must list major equipment or material suppliers proposed for the project, identifying whether suppliers will furnish materials only or furnish and install materials. Additional information regarding subcontractors and suppliers may be attached as needed to support the bid proposal.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 3 – Subcontractors and Suppliers
2. Subcontractors and Suppliers
Subcontractors
Provide a list of subcontractors that will provide more than five (5) percent of the Work (based on the proposed Contract Price).
Name Work to be Provided Estimated Percentage of the Proposed Contract Price
Suppliers
Provide a list of major equipment or material suppliers proposed for this project. Attach additional information if necessary.
Supplier Name Equipment/Material to be Provided Furnish Only Furnish and Install
File details come from the government source that posted it. Updated .