This is an SBE Utilization Plan and Commitment to Local Economic Impact form (BEH-FRM-605.SAW) developed by the City of Dallas for the Southwest 96-inch Water Transmission Pipeline Project. The project involves installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods, along with cathodic protection, electrical, instrumentation and controls for electrically actuated valves, and site and paving restoration. Plans, specifications, and bid proposal spreadsheets became available on the Bonfire platform on Friday, March 13, 2026, prior to 4:00 p.m. The project is managed by Tracey Long, PE.

The form requires respondents to document Small Business Enterprise (SBE) participation commitments and plan team composition, with scoring allocated across multiple evaluation criteria: four points for meeting the established contract-specific SBE goal, two additional points for exceeding that goal by at least 5%, two points for first-time contracting with new SBE partners or as a first-time SBE prime, three points for local workforce impact (evaluated separately through form BEH-FRM-604.SAW), two points for local supply chain usage within Dallas or the Dallas-Fort Worth-Arlington Metropolitan Statistical Area, and one point for local community impact through training, internship, apprenticeship, or community partnership activities. All proposed subcontractors must perform a Commercially Useful Function and cannot serve as pass-throughs or administrative conduits. No vendor substitution is permitted without prior submission of revised forms and written approval from the City of Dallas Business Enterprise Hub. Respondents must provide detailed team composition tables including company names, addresses, NAICS codes, contact information, estimated contract values, and percentage allocations.

View the file

Other files

File Type Posted
14-DWU-FRM-170-CS Request For Competitive Sealed Proposals 26 003.pdf PDF
6-BEH-FRM-607.SAW SBE Good Faith Effort Documentation Form.docx DOCX document
23-Table 3 Subcontractors and Suppliers.pdf PDF
43-Table 10 Proposed Project Quality Control Managers.docx DOCX document
28-Table 8 Proposed Project Superintendents.pdf PDF
13-Form 25 Cement Preference Certification.pdf PDF
12-Conflict of Interest Questionnaire.pdf PDF
3-BEH-FRM-610.SAW SBE Subcontractor Intent Form.docx DOCX document
48-26 003 Bid Proposal Spreadsheet.xlsx XLSX spreadsheet
32-Table 12 Financial Information.pdf PDF
9-Sample Contract for Services.pdf PDF
7-BEH-FRM-604.SAW Local Participation Workforce Impact.docx DOCX document
10-BIDDERS AFFIDAVIT.pdf PDF
25-Table 5 Demonstation of Budget Performance.pdf PDF
40-Table 7 Proposed Project Managers.docx DOCX document
44-Table 11 Project Information for Key Personnel.docx DOCX document
11-Acknowledgement of Addendum.docx DOCX document
15-TWDB-0459.pdf PDF
21-Table 1 General Information.pdf PDF
24-Table 4 Current Projects and Projects Completed.pdf PDF
47-Table 13 Affidavits.docx DOCX document
36-Table 3 Subcontractors and Suppliers.docx DOCX document
37-Table 4 Current Projects and Projects Completed.docx DOCX document
27-Table 7 Proposed Project Managers.pdf PDF
42-Table 9 Proposed Project Safety Managers.docx DOCX document
34-Table 1 General Information.docx DOCX document
1-DRIVE Policy.pdf PDF
49-Volume I - Specifications - SWPL.pdf PDF
29-Table 9 Proposed Project Safety Managers.pdf PDF
19-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 5.pdf PDF
39-Table 6 Demonstration of On-Time Performance.docx DOCX document
20-26-003 SWPL Summit GST to Hwy 67 BID SET FULL BW.pdf PDF
26-Table 6 Demonstration of On-Time Performance.pdf PDF
46-Table 12 Financial Information.docx DOCX document
30-Table 10 Proposed Project Quality Control Managers.pdf PDF
17-26-003 SWP Summit GST to Hwy 67+Bid Set Specs Vol 3.pdf PDF
16-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 2.pdf PDF
45-Table 11 B Project Information for Key Personnel.docx DOCX document
35-Table 2 A B Contractors Approach.docx DOCX document
38-Table 5 Demonstation of Budget Performance.docx DOCX document
2-BEH-FRM-602.SAW SBE Affidavit.docx DOCX document
33-Table 13 Affidavits.pdf PDF
22-Table 2 A B Contractors Approach.pdf PDF
5-BEH-FRM-606.SAW Engagement Score Past Commitment Form.docx DOCX document
8-BEH-FRM-609.SAW Prime Self Performance Declaration.docx DOCX document
18-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 4.pdf PDF
31-Table 11 Project Information for Key Personnel.pdf PDF
41-Table 8 Proposed Project Superintendents.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dallas Regional Inclusive Vendor Enterprise SBE Utilization Plan & Commitment to Local Economic Impact

BEH-FRM-605.SAW

Prime Vendor Information

Solicitation Name:
Solicitation #:
Prime Vendor Name:

SBE Utilization Commitment Summary (6 Points) This section captures the respondent’s planned Small Business Enterprise (SBE) participation for this solicitation. The information provided will be used to evaluate the SBE Utilization scoring component, which includes:

· 4 points for meeting the established contract-specific SBE goal

· 2 additional points for exceeding the goal by at least 5% BEH staff will verify certification status, calculate the final utilization percentage, and apply scoring.

SBE Participation Goal (%):

This percentage will be provided in the bid specifications or solicitation document. See section 6.1 Developing Regional Inclusive Vendor Enterprises (DRIVE) Policy.

Planned SBE Participation (%):

Calculated based on the Proposed Team Make-Up Table on page 2. Participation percentage calculated against the total estimated contract amount.

First-Time Contracting (2 Points) The City of Dallas seeks to expand opportunities for small businesses by encouraging both new SBE firms and established primes to broaden their subcontracting networks. Under the DRIVE Policy, “first-time contracting” refers to either (a) an SBE vendor who has not been previously awarded a City of Dallas contract as a prime, or (b) a prime establishing a new partnership with an SBE firm they have not previously contracted with on a City of Dallas project/contract.

Please select one of the following:

☐ Our firm has not previously been awarded a City of Dallas contract as a SBE prime.

☐ We are using at least one new SBE partner we have never partnered with before on a City of Dallas contract.

SBE Firm Name:
SBE POC:
Email:
Phone:

☐ Not applicable.

(A maximum of two (2) points may be awarded for this section, regardless of how many qualifying first-time contracting actions are identified.)

Dallas Regional Inclusive Vendor Enterprise SBE Utilization Plan & Commitment to Local Economic Impact

BEH-FRM-605.SAW

BEH-FRM-605.SAW Revision Date: 2026.03.01 Page 1 of 1 Proposed Team Make-Up

Scope/Work Element
NAICS
Company Name
Company Address City, State
Contact Name, Phone & Email
SBE # if applicable
Estimated Value ($)
% of Contract

Include all subcontractors who will be performing on this project.

NAICS codes can be found at: https://www.census.gov/naics Dallas Regional Inclusive Vendor Enterprise SBE Utilization Plan & Commitment to Local Economic Impact

BEH-FRM-605.SAW

BEH-FRM-605.SAW Revision Date: 2026.03.01 Page 1 of 1

CUF COMMITMENT

☐ We certify that each subcontractor listed in the Proposed Team Make-Up will perform a Commercially Useful Function (CUF) within its certified NAICS code(s) and will not serve as a pass-through, broker, or administrative conduit.

☐ We certify that commercially reasonable subcontracting opportunities were evaluated consistent with DRIVE goal-setting methodology and that scopes of work were not artificially consolidated or restricted in order to influence scoring.

If awarded, the SBE commitments reflected in this Utilization Plan will become contractual obligations and subject to monitoring and compliance review in accordance with DRIVE Policy requirements.

NO SUBSTITUTION STATEMENT

☐ We acknowledge that no vendor/subcontractor listed herein may be substituted, replaced, downgraded in scope, or removed without prior submission of a revised BEH-FRM-603.SAW — Schedule of Work and Actual Payment form, Change of SBE Subcontractor Request form and written approval from Business Enterprise Hub (BEH).

Local Workforce (3 Points) Local Workforce under the DRIVE policy evaluation criteria is not collected or evaluated through this form. Local Workforce scoring is determined exclusively from the information provided on BEH-FRM-604.SAW — Local Workforce Impact form, which must also be submitted with solicitation response.

Local Supply Chain Usage (2 Points) The City of Dallas seeks to strengthen and expand the local supplier ecosystem by increasing the use of businesses that are headquartered within the City of Dallas or the Dallas–Fort Worth–Arlington Metropolitan Statistical Area (MSA) as identified by the Office of Management and Budget (OMB). This requirement applies to all subcontractors and suppliers regardless of certification. (SBE Certification is not required for this scoring category.)

Provide the name and headquarters address for supplier(s) or subcontractor(s) proposed for this contract that is:

· Headquartered in the City of Dallas (1 point)

· Headquartered in the Dallas – Fort Worth – Arlington MSA (1 point) (If no proposed suppliers or subcontractors are headquartered in the City of Dallas, a maximum of one (1) point may be awarded for a supplier or subcontractor headquartered elsewhere in the Dallas–Fort Worth–Arlington MSA, if applicable.)

Local Supplier & Subcontractor Table

Vendor / Subcontractor Name
Role (Supplier/Subcontractor

Or Other)

Headquarters Address
Estimated Spend ($)

(A maximum of two (2) points may be awarded for this section, regardless of how many local suppliers are identified.)

Local Community Impact (1 Point) The City of Dallas values vendors that demonstrate a sustained commitment to supporting the local community. Under the DRIVE Policy, respondents may earn one (1) point by documenting participation in Dallas-based training, internship, apprenticeship, workforce-development, or community partnership activities that contribute to long-term economic opportunity in the region.

Provide a brief description (3–5 sentences) of at least one qualifying activity your firm has participated in within the last three (3) years. Activities may include, but are not limited to the following examples:

· Hosting or funding internships or apprenticeships for Dallas residents or students

· Participating in local workforce-development programs, including upskilling or training initiatives

· Serving as a partner or volunteer with a Dallas-based nonprofit, educational institution, or community organization

· Supporting City of Dallas youth, veteran, or re-entry employment initiatives

· Providing mentorship, technical assistance, or capacity-building to Dallas small businesses Narrative (Required for Scoring):

Describe your firm’s qualifying activity, including the name(s) of the organization(s) involved, the type of participation, and the projected or actual community impact.

Respondents may attach supporting documentation (e.g., letters, program descriptions, partnership agreements, photographs, or event materials) to supplement their narrative; however, supporting documentation is optional.

Certification Officer Signature:

Printed Name:
Title:
Date:

BEH-FRM-605.SAW Revision Date: 2026.03.01 Page 1 of 1 image1.png