27-Table 7 Proposed Project Managers.pdf

PDF 107 KB Posted

Attached to
Southwest 96-inch Water Transmission Pipeline Project
Solicitation number
CIZ-DWU-26 003
Issued by
Dallas County, Texas

About this file

This is a Proposed Project Managers table template for a state and local contract opportunity in Texas related to the Southwest 96-inch Water Transmission Pipeline Project. The project involves installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using open cut and tunneling methods. The scope also includes cathodic protection, electrical systems, instrumentation and controls for electrically actuated valves, site and paving restoration, and all appurtenances. Plans, specifications, and bid proposal spreadsheets are available on Bonfire at https://dallascityhall.bonfirehub.com/ beginning Friday, March 13, 2026 prior to 4:00 p.m. The designated Project Manager is Tracey Long, PE.

The document serves as a standardized form for proposing primary and alternate project managers, requiring bidders to provide detailed information about each candidate including years of experience as a project manager, tenure with the organization, number of similar projects managed, current project assignments with time allocations and estimated completion dates, and reference contact information. The form structure allows for comprehensive evaluation of proposed project management capabilities and ensures bidders have identified individuals pre-approved for reference contact.

View the file

Other files

File Type Posted
14-DWU-FRM-170-CS Request For Competitive Sealed Proposals 26 003.pdf PDF
6-BEH-FRM-607.SAW SBE Good Faith Effort Documentation Form.docx DOCX document
23-Table 3 Subcontractors and Suppliers.pdf PDF
43-Table 10 Proposed Project Quality Control Managers.docx DOCX document
28-Table 8 Proposed Project Superintendents.pdf PDF
13-Form 25 Cement Preference Certification.pdf PDF
12-Conflict of Interest Questionnaire.pdf PDF
3-BEH-FRM-610.SAW SBE Subcontractor Intent Form.docx DOCX document
48-26 003 Bid Proposal Spreadsheet.xlsx XLSX spreadsheet
32-Table 12 Financial Information.pdf PDF
9-Sample Contract for Services.pdf PDF
7-BEH-FRM-604.SAW Local Participation Workforce Impact.docx DOCX document
10-BIDDERS AFFIDAVIT.pdf PDF
25-Table 5 Demonstation of Budget Performance.pdf PDF
40-Table 7 Proposed Project Managers.docx DOCX document
44-Table 11 Project Information for Key Personnel.docx DOCX document
11-Acknowledgement of Addendum.docx DOCX document
15-TWDB-0459.pdf PDF
21-Table 1 General Information.pdf PDF
24-Table 4 Current Projects and Projects Completed.pdf PDF
47-Table 13 Affidavits.docx DOCX document
36-Table 3 Subcontractors and Suppliers.docx DOCX document
37-Table 4 Current Projects and Projects Completed.docx DOCX document
42-Table 9 Proposed Project Safety Managers.docx DOCX document
34-Table 1 General Information.docx DOCX document
1-DRIVE Policy.pdf PDF
49-Volume I - Specifications - SWPL.pdf PDF
29-Table 9 Proposed Project Safety Managers.pdf PDF
19-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 5.pdf PDF
39-Table 6 Demonstration of On-Time Performance.docx DOCX document
20-26-003 SWPL Summit GST to Hwy 67 BID SET FULL BW.pdf PDF
26-Table 6 Demonstration of On-Time Performance.pdf PDF
46-Table 12 Financial Information.docx DOCX document
30-Table 10 Proposed Project Quality Control Managers.pdf PDF
17-26-003 SWP Summit GST to Hwy 67+Bid Set Specs Vol 3.pdf PDF
16-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 2.pdf PDF
45-Table 11 B Project Information for Key Personnel.docx DOCX document
35-Table 2 A B Contractors Approach.docx DOCX document
4-BEH-FRM-605.SAW SBE Utilization Plan Commitment to Local Eco Impact.docx DOCX document
38-Table 5 Demonstation of Budget Performance.docx DOCX document
2-BEH-FRM-602.SAW SBE Affidavit.docx DOCX document
33-Table 13 Affidavits.pdf PDF
22-Table 2 A B Contractors Approach.pdf PDF
5-BEH-FRM-606.SAW Engagement Score Past Commitment Form.docx DOCX document
8-BEH-FRM-609.SAW Prime Self Performance Declaration.docx DOCX document
18-26-003 SWP Summit GST to Hwy 67 Bid Set Specs Vol 4.pdf PDF
31-Table 11 Project Information for Key Personnel.pdf PDF
41-Table 8 Proposed Project Superintendents.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 7—Proposed Project Managers Name of Organization

Primary Candidate Name of individual Years of experience as project manager Years of experience with this organization Number of similar projects as project manager Number of similar projects in other positions Current Project Assignments

Name of assignment Percent of time used for this project

Estimated project completion date

Reference Contact Information (listing names indicates approval to contact named individuals as a reference) Name Name Title/Position Title/Position Organization Organization Telephone Telephone Email Email Project Project

Candidate’s role on project

Candidate’s role on project

Alternate Candidate Name of individual Years of experience as project manager Years of experience with this organization Number of similar projects as project manager Number of similar projects in other positions Current Project Assignments

Name of assignment Percent of time used for this project

Estimated project completion date

Reference Contact Information (listing names indicates approval to contact named individuals as a reference) Name Name Title/Position Title/Position Organization Organization Telephone Telephone Email Email Project Project

Candidate’s role on project

Candidate’s role on project

File details come from the government source that posted it. Updated .