26-Table 6 Demonstration of On-Time Performance.pdf
PDF 178 KB Posted
- Solicitation number
- CIZ-DWU-26 003
- Issued by
- Dallas County, Texas
About this file
This is a demonstration of on-time performance table from a state and local contract opportunity in Texas for the Southwest 96-inch Water Transmission Pipeline Project. The table is designed for bidding organizations to document their project completion history over the preceding five years. Organizations must provide comprehensive information on all projects completed within this timeframe, including the owner name, project description, original and amended contract dates for both substantial and final completion, and actual contract dates achieved for substantial and final completion. The table format allows bidders to demonstrate their track record of meeting contractual deadlines, which serves as an evaluation criterion for the water transmission pipeline project managed by Project Manager Tracey Long, PE.
The water transmission pipeline project involves the installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe using a combination of open cut and tunneling methods. The project scope also includes cathodic protection systems, electrical infrastructure, instrumentation and controls for electrically actuated valves, and site and paving restoration. Plans, specifications, and the bid proposal spreadsheet were scheduled to be available on the Bonfire platform at https://dallascityhall.bonfirehub.com/ beginning Friday, March 13, 2026, prior to 4:00 p.m. The demonstration of on-time performance table serves as a critical submission requirement for bidders to substantiate their ability to complete projects on schedule, directly supporting evaluation of contractor reliability for this infrastructure project.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 6 – Demonstration of On-Time Performace
Name of Organization Provide information on all projects completed by the Organization within the last 5 years.
Owner Name
Project Description
Original Contract Date for
Substantial Completion
Original Contract
Date for Final Completion
Amended Contract Date for
Substantial Completion
Amended Contract
Date for Final Completion
Actual Contract Date for
Substantial Completion
Actual Contract
Date for Final Completion
Notes:
Table 6 – Demonstration of On-Time Performace
BLANK
File details come from the government source that posted it. Updated .