Switchgear ED.pdf

PDF 5 MB Posted

Attached to
36-Month Electrical Distribution Testing
Solicitation number
36C24727Q0044
Issued by

About this file

This is a Preventive Maintenance Report documenting electrical testing and inspection services performed by Georgia Power Company Energy Services for the VA Main Campus in Atlanta, Georgia on February 24, 2024. The report contains comprehensive test and inspection results for nine low voltage circuit breakers in the facility's electrical distribution system.

The inspection and testing covered multiple circuit breakers identified as Main Breaker, ATS-Q3, ATS-Q2, ATS-E, ATS-Q1, MTS, GHATS-1, and ATS-L. Each breaker underwent detailed evaluation including circuit breaker nameplate data, trip device data, primary fuse data, mechanical inspection, operational testing, trip unit testing, breaker/fuse DLRO (Dielectric Loss and Resistance) testing, and insulation resistance testing across all three phases (A, B, and C). All inspected equipment was cleaned, tested, and found to be in acceptable condition with secondary injection testing completed. The report indicates that test results are final and documents specifications such as manufacturer details (primarily General Electric), rated amperage, voltage ratings, and specific performance metrics for each piece of equipment inspected during the planned maintenance outage.

View the file

Other files

File Type Posted
Final - AF Label List.xlsx XLSX spreadsheet
final remote - gen device eval.pdf PDF
Attachment B - Fort McPherson Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Drawing List.pdf PDF
GHTA-AG-1.pdf PDF
final main site - util input report.pdf PDF
NHSB-BG-1.pdf PDF
20200603 - Final Combined pdfs.pdf PDF
final main site - util device eval.pdf PDF
final main site - util bus eval.pdf PDF
Existing-Recommended Breaker Settings - Final.xlsx XLSX spreadsheet
GHSB-C3-1.pdf PDF
final remote - gen results report.pdf PDF
NHSB-CB-1.pdf PDF
final main site - gen bus eval.pdf PDF
Equipment Condition Assessment Sheets.xlsx XLSX spreadsheet
GHTA-CB-1.pdf PDF
final remote - gen input report.pdf PDF
final remote - util results report.pdf PDF
Questions and Answers.docx DOCX document
Attachment C - Trinka-Davis Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Switchboard C.pdf PDF
Attachment D - Equipment and Test Matrix - REV19.1.docx DOCX document
Electrical Distribution Testing SOW final.docx DOCX document
final remote - util bus eval.pdf PDF
7.6 Facility Condition Assessment - Final Submission.xlsx XLSX spreadsheet
NHSB-C3-2.pdf PDF
final main site - gen device eval.pdf PDF
GHSB-AG-1.pdf PDF
Electrical Directive 1028 D 2020-02-24.pdf PDF
GHTA-CB-2.pdf PDF
final remote - util device eval.pdf PDF
ArcFlash - Atlanta Main Site Final.xls XLS spreadsheet
Attachment A - Main Campus Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
ArcFlash - Atlanta Remote Sites Final.xls XLS spreadsheet
final remote - gen bus eval.pdf PDF
NSHB-CB-2.pdf PDF
NHSB-C3-1 Fast Transfer.pdf PDF
36C24727Q0044 0002.pdf PDF
7.7 Building System Assessment_Atlanta.xlsx XLSX spreadsheet
NHSB-C3-1.pdf PDF
Wage Determination 2015-4471.docx DOCX document
final main site - gen input report.pdf PDF
final main site - gen results report.pdf PDF
final remote - util input report.pdf PDF
Atlanta VA Main Campus 2022 IR Report.pdf PDF
final main site - util results report.pdf PDF
36C24727Q0044 0001.pdf PDF
36C24727Q0044_1 36-Month Electrical Distribution Testing.docx DOCX document
Attachment D - Equipment and Test Matrix - REV19.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .