Switchgear ED.pdf
PDF 5 MB Posted
- Attached to
- 36-Month Electrical Distribution Testing
- Solicitation number
- 36C24727Q0044
About this file
This is a Preventive Maintenance Report documenting electrical testing and inspection services performed by Georgia Power Company Energy Services for the VA Main Campus in Atlanta, Georgia on February 24, 2024. The report contains comprehensive test and inspection results for nine low voltage circuit breakers in the facility's electrical distribution system.
The inspection and testing covered multiple circuit breakers identified as Main Breaker, ATS-Q3, ATS-Q2, ATS-E, ATS-Q1, MTS, GHATS-1, and ATS-L. Each breaker underwent detailed evaluation including circuit breaker nameplate data, trip device data, primary fuse data, mechanical inspection, operational testing, trip unit testing, breaker/fuse DLRO (Dielectric Loss and Resistance) testing, and insulation resistance testing across all three phases (A, B, and C). All inspected equipment was cleaned, tested, and found to be in acceptable condition with secondary injection testing completed. The report indicates that test results are final and documents specifications such as manufacturer details (primarily General Electric), rated amperage, voltage ratings, and specific performance metrics for each piece of equipment inspected during the planned maintenance outage.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .