NHSB-C3-1 Fast Transfer.pdf

PDF 4 MB Posted

Attached to
36-Month Electrical Distribution Testing
Solicitation number
36C24727Q0044
Issued by

About this file

This is a Preventive Maintenance Report documenting electrical testing and inspection services performed by Georgia Power Company Energy Services for the VA Administration's Main Campus in Atlanta, Georgia. The report covers low voltage circuit breaker inspections conducted on February 24, 2024, for the VA Main Campus Atlanta electrical distribution system, specifically addressing the NHSB-C3-1 Fast Transfer Circuit Breaker system.

The report presents detailed inspection and test data for five circuit breakers: Main 52-1, Main 52-2, Tie 52-T, Chiller #2, and Provision Front Parking Lot Deck 5. All breakers were manufactured by Eaton with ratings ranging from 800A to 4000A. Testing included comprehensive evaluations of circuit breaker functionality, trip device settings, insulation resistance, breaker/fuse DLRO resistance, and primary fuse resistance. The inspection findings indicate all circuit breakers achieved "Acceptable" condition ratings in both as-found and as-left states across all tested parameters, including overall condition, disconnects, arc chutes, contacts, insulation, operating mechanism, lubrication, and auxiliary devices. All operational and trip unit test data passed specifications, and all insulation resistance tests confirmed acceptable performance across all three phases. The report notes that each breaker was cleaned, inspected, tested, and secondary injection tested, with final test results confirmed as valid.

View the file

Other files

File Type Posted
Final - AF Label List.xlsx XLSX spreadsheet
final remote - gen device eval.pdf PDF
Attachment B - Fort McPherson Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Drawing List.pdf PDF
GHTA-AG-1.pdf PDF
final main site - util input report.pdf PDF
NHSB-BG-1.pdf PDF
20200603 - Final Combined pdfs.pdf PDF
final main site - util device eval.pdf PDF
final main site - util bus eval.pdf PDF
Existing-Recommended Breaker Settings - Final.xlsx XLSX spreadsheet
GHSB-C3-1.pdf PDF
final remote - gen results report.pdf PDF
NHSB-CB-1.pdf PDF
final main site - gen bus eval.pdf PDF
Equipment Condition Assessment Sheets.xlsx XLSX spreadsheet
GHTA-CB-1.pdf PDF
final remote - gen input report.pdf PDF
final remote - util results report.pdf PDF
Questions and Answers.docx DOCX document
Attachment C - Trinka-Davis Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Switchboard C.pdf PDF
Attachment D - Equipment and Test Matrix - REV19.1.docx DOCX document
Electrical Distribution Testing SOW final.docx DOCX document
final remote - util bus eval.pdf PDF
7.6 Facility Condition Assessment - Final Submission.xlsx XLSX spreadsheet
NHSB-C3-2.pdf PDF
final main site - gen device eval.pdf PDF
GHSB-AG-1.pdf PDF
Electrical Directive 1028 D 2020-02-24.pdf PDF
GHTA-CB-2.pdf PDF
final remote - util device eval.pdf PDF
ArcFlash - Atlanta Main Site Final.xls XLS spreadsheet
Attachment A - Main Campus Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
ArcFlash - Atlanta Remote Sites Final.xls XLS spreadsheet
final remote - gen bus eval.pdf PDF
NSHB-CB-2.pdf PDF
36C24727Q0044 0002.pdf PDF
7.7 Building System Assessment_Atlanta.xlsx XLSX spreadsheet
NHSB-C3-1.pdf PDF
Wage Determination 2015-4471.docx DOCX document
final main site - gen input report.pdf PDF
Switchgear ED.pdf PDF
final main site - gen results report.pdf PDF
final remote - util input report.pdf PDF
Atlanta VA Main Campus 2022 IR Report.pdf PDF
final main site - util results report.pdf PDF
36C24727Q0044 0001.pdf PDF
36C24727Q0044_1 36-Month Electrical Distribution Testing.docx DOCX document
Attachment D - Equipment and Test Matrix - REV19.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .