This is a Thermography Survey Report documenting an infrared inspection of the electrical systems at VA-Main Campus (VA Hospital) in Atlanta, Georgia, conducted by Georgia Power Company Power Services on August 15-17, 2022.

The report contains a comprehensive infrared (IR) list of electrical equipment scanned across multiple buildings (A, B, C, D, E, F, and auxiliary locations) during normal running and "As-Found" conditions. The inspection identified anomalies in specific equipment requiring corrective action, organized by severity category. Category 1 (Critical, temperature >70°F) requires immediate action with repair or replacement of components and infrared re-inspection after repairs. Category 2 (Serious, 41-69°F) requires scheduling repairs as soon as feasible with physical inspection of surrounding components. Category 3 (Intermediate, 21-40°F) requires repairs within a reasonable timeframe without load changes or operational modifications. Category 3 (Minor, 1-20°F) allows repairs during the next preventive maintenance outage. The IR list documents over 400 equipment items across the campus with location, building, equipment type, make/model, and completion status. Notable findings include several disconnect switches, transformers, panels, and related electrical components with detected thermal anomalies. Five detailed infrared reports with thermal images identify specific problem equipment: DPQA4 #2 disconnect (Intermediate severity, 25.3°F temperature rise), Breaker #14 Panel MCCB (Minor severity, 13.6°F rise), Breaker #3 Panel MCCB (Minor severity, 13.8°F rise), P8 Disconnect (Intermediate severity, 21.4°F rise), and P9 Disconnect (Minor severity, 14.2-15.3°F rise). Additional notations document debris stacked in front of electrical equipment in multiple rooms requiring housekeeping attention. The report was certified by Greg Bates, Level I Thermographer (ID #208629), with NFPA70E Safety Certification (ATMT0817E516A-46475).

View the file

Other files

File Type Posted
Final - AF Label List.xlsx XLSX spreadsheet
final remote - gen device eval.pdf PDF
Attachment B - Fort McPherson Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Drawing List.pdf PDF
GHTA-AG-1.pdf PDF
final main site - util input report.pdf PDF
NHSB-BG-1.pdf PDF
20200603 - Final Combined pdfs.pdf PDF
final main site - util device eval.pdf PDF
final main site - util bus eval.pdf PDF
Existing-Recommended Breaker Settings - Final.xlsx XLSX spreadsheet
GHSB-C3-1.pdf PDF
final remote - gen results report.pdf PDF
NHSB-CB-1.pdf PDF
final main site - gen bus eval.pdf PDF
Equipment Condition Assessment Sheets.xlsx XLSX spreadsheet
GHTA-CB-1.pdf PDF
final remote - gen input report.pdf PDF
final remote - util results report.pdf PDF
Questions and Answers.docx DOCX document
Attachment C - Trinka-Davis Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Switchboard C.pdf PDF
Attachment D - Equipment and Test Matrix - REV19.1.docx DOCX document
Electrical Distribution Testing SOW final.docx DOCX document
final remote - util bus eval.pdf PDF
7.6 Facility Condition Assessment - Final Submission.xlsx XLSX spreadsheet
NHSB-C3-2.pdf PDF
final main site - gen device eval.pdf PDF
GHSB-AG-1.pdf PDF
Electrical Directive 1028 D 2020-02-24.pdf PDF
GHTA-CB-2.pdf PDF
final remote - util device eval.pdf PDF
ArcFlash - Atlanta Main Site Final.xls XLS spreadsheet
Attachment A - Main Campus Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
ArcFlash - Atlanta Remote Sites Final.xls XLS spreadsheet
final remote - gen bus eval.pdf PDF
NSHB-CB-2.pdf PDF
NHSB-C3-1 Fast Transfer.pdf PDF
36C24727Q0044 0002.pdf PDF
7.7 Building System Assessment_Atlanta.xlsx XLSX spreadsheet
NHSB-C3-1.pdf PDF
Wage Determination 2015-4471.docx DOCX document
final main site - gen input report.pdf PDF
Switchgear ED.pdf PDF
final main site - gen results report.pdf PDF
final remote - util input report.pdf PDF
final main site - util results report.pdf PDF
36C24727Q0044 0001.pdf PDF
36C24727Q0044_1 36-Month Electrical Distribution Testing.docx DOCX document
Attachment D - Equipment and Test Matrix - REV19.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .