This is a Preventive Maintenance Report documenting electrical testing and inspection services performed by Georgia Power Company Energy Services for the VA Main Campus in Atlanta, Georgia. The report, dated July 1, 2023, provides detailed test and inspection results for low voltage circuit breakers in the GHSB-AG-1 electrical distribution system.
The report contains comprehensive testing data for 13 individual low voltage circuit breakers, with each breaker inspection documented on a separate page. Testing was conducted on July 20, 2023, and June 22, 2023, and includes circuit breaker nameplate data, trip device data, primary fuse data, and detailed inspection findings. All inspected breakers were cleaned, inspected, and tested with results marked as acceptable or passing across all inspection categories, including overall condition, primary and secondary disconnects, arc chutes, contacts, insulation, operating mechanisms, lubrication, and auxiliary devices. Operational test data includes charge motor tests, close coil tests, trip coil tests, and under voltage tests, with trip unit test data showing pass results for A, B, and C phases. Additional testing covers breaker/fuse DLRO (Dual Logic Resistance Ohm) resistance measurements and insulation resistance test data across all three phases. The report indicates that secondary injection testing was performed, and all test results are final, confirming the circuit breakers are functioning within acceptable parameters for continued electrical service to the VA facility.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .