This document is a Preventive Maintenance Report from Georgia Power Company detailing electrical testing and inspection results for low voltage circuit breakers at the VA Main Campus in Atlanta, Georgia. The report documents inspections performed on seven circuit breakers (Main, ATS-MTS, ATS-Q2, ATS-L, ATS-Q1, ATS-E, and ATS-Q3) as of the planned maintenance outage date of July 1, 2023, with testing conducted on June 22, 2023, and June 28, 2023.
Each circuit breaker inspection includes comprehensive data on circuit breaker name plate information, trip device data, primary fuse data, and detailed inspection results across multiple categories including overall condition, disconnects, secondary disconnects, arc chutes, contacts, insulation, operating mechanism, lubrication, auxiliary devices, barriers, frame, and interlocks. All inspected units received "Acceptable" ratings in both "As-Found" and "As-Left" conditions. Testing data encompassed operational tests, trip unit test data with specific measurements across multiple phases (A, B, C), breaker/fuse DLRO (Dry Low Resistance Ohm) resistance test data, and insulation resistance test data. All circuit breakers were cleaned, inspected, and tested with secondary injection testing performed, and all test results are documented as final. The report was prepared by Greg Bates, Utility Service Team Member at Georgia Power Company.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .