Attachment B - Fort McPherson Equipment Schedule - REV19.1.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- 36-Month Electrical Distribution Testing
- Solicitation number
- 36C24727Q0044
About this file
This is an Equipment Schedule attachment for a 36-month electrical distribution testing contract at Fort McPherson VA Clinic in Atlanta, Georgia. The schedule documents 93 pieces of electrical equipment across five buildings (125, 128, 129, 130, and 131) that require inspection, testing, maintenance, calibration, and infrared scanning. The equipment inventory includes main switchboards/MDPs, distribution panelboards, automatic transfer switches, motor control centers, fire-pump controllers, safety switches/service disconnects, and dry-type transformers with voltage ratings ranging from 208Y/120V to 480Y/277V. Equipment is identified by building location, equipment tag, equipment class, VA asset number, manufacturer/model, and voltage rating, with specific notes on testing requirements such as external connection and infrared inspection only for the UPS unit and electrical inspection/testing only for the fire pump without flow testing.
The schedule is issued as a bidder-facing document (Revision 19, dated August 25, 2026) under the Atlanta VA Health Care System (Station 508) and governs asset identity, asset location, and base quantities as stated in the Statement of Work Section 3.1. Required test and maintenance levels for each equipment class are specified in Attachment D and the Statement of Work. The majority of equipment consists of distribution panelboards across all five buildings, with Building 125 containing the largest concentration of assets including transformers ranging from 45kVA to 112.5kVA and multiple motor control centers requiring field verification of tags and ratings.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B
| ATTACHMENT B | EQUIPMENT SCHEDULE | Fort McPherson VA Clinic, Buildings 125, 128, 129, 130, and 131 (Atlanta, GA) | ||||||||
| Electrical distribution inspection, testing, maintenance, calibration, and infrared scanning. The required test and maintenance level for each equipment class is stated in Attachment D and in the Statement of Work. This schedule governs asset identity, asset location, and base quantities (SOW Section 3.1). | ||||||||
| Solicitation attachment control: Revision 19 | Date: August 25, 2026 | Atlanta VA Health Care System (Station 508) | Issued with the solicitation as a bidder-facing equipment schedule. | ||||||||
| Item | Building | Location | Equipment tag / description | Equipment class | VA asset number / Maximo asset ID | Make / model | Voltage / rating | Notes |
| 1 | Building 125 | 127 | DP1 | Main switchboard / MDP | 3779277 | EATON / CUTLER HAMMER | 480Y/277V | |
| 2 | Building 125 | 127 | L1A (modified) | Distribution panelboard | 3779278 | Existing | ||
| 3 | Building 125 | 127 | R1A Section 1 (modified) | Distribution panelboard | 3779952 | Existing | ||
| 4 | Building 125 | 127 | R1A Section 2 (modified) | Distribution panelboard | 3779970 | Existing | ||
| 5 | Building 125 | B014 | OL | Distribution panelboard | 3779972 | EATON / CUTLER HAMMER | 208Y/120V | |
| 6 | Building 125 | 122 | SBDP | Distribution panelboard | 37799474 | EATON / CUTLER HAMMER | 480Y/277V | |
| 7 | Building 125 | B004 | CP | Distribution panelboard | 3779976 | EATON / CUTLER HAMMER | 208Y/120V | |
| 8 | Building 125 | 1124 | L2A (modified) | Distribution panelboard | 3779978 | Existing | ||
| 9 | Building 125 | 1124 | R2A1 (modified) | Distribution panelboard | 3779979 | Existing | ||
| 10 | Building 125 | 1124 | R2A2 (modified) | Distribution panelboard | 3779980 | Existing | ||
| 11 | Building 125 | 1154 | L2B (modified) | Distribution panelboard | 3779982 | Existing | ||
| 12 | Building 125 | 1154 | R2B1 (existing) | Distribution panelboard | 3779983 | Existing | ||
| 13 | Building 125 | 1154 | R2B2 (existing) | Distribution panelboard | 3779986 | Existing | ||
| 14 | Building 125 | 1154 | R2B3 (modified) | Distribution panelboard | 3779987 | Existing | ||
| 15 | Building 125 | 1154 | R2B4 | Distribution panelboard | 3779989 | EATON / CUTLER HAMMER | 208Y/120V | |
| 16 | Building 125 | 1049 | L2C (modified) | Distribution panelboard | 3779991 | Existing | ||
| 17 | Building 125 | 1049 | R2C1 (existing) | Distribution panelboard | 3779992 | Existing | ||
| 18 | Building 125 | 1049 | R2C2 (modified) | Distribution panelboard | 3779995 | Existing | ||
| 19 | Building 125 | 1049 | R2C3 (modified) | Distribution panelboard | 3779997 | Existing | ||
| 20 | Building 125 | 11C2 | R2L1 (modified) | Distribution panelboard | 3780000 | Existing | ||
| 21 | Building 125 | 11C2 | R2L2 (modified) | Distribution panelboard | 3780001 | Existing | ||
| 22 | Building 125 | 2204 | L3B (modified) | Distribution panelboard | 3780003 | Existing | ||
| 23 | Building 125 | 1170 | KP | Distribution panelboard | 3780006 | EATON / CUTLER HAMMER | 208Y/120V | |
| 24 | Building 125 | 2204 | R3B1 (modified) | Distribution panelboard | 3780008 | Existing | ||
| 25 | Building 125 | 2204 | R3B2 (modified) | Distribution panelboard | 3780011 | Existing | ||
| 26 | Building 125 | 2204 | R3B3 | Distribution panelboard | 3780015 | EATON / CUTLER HAMMER | 208Y/120V | |
| 27 | Building 125 | 122 | UPS | UPS | 3780380 | AC & DC Power Technologies LLC | External connection inspection and IR only | |
| 28 | Building 125 | 122 | ATS | Automatic transfer switch | 3780036 | Cummins Power South | ||
| 29 | Building 125 | BA004 | MCC1 | Motor control center | CH Freedom 2100 | 480V | Field verify tag and rating | |
| 30 | Building 125 | 2A200 | MCC2 | Motor control center | CH Freedom 2100 | 480V | Field verify tag and rating | |
| 31 | Building 125 | 2A202 | MCC3 | Motor control center | CH Freedom 2100 | 480V | Field verify tag and rating | |
| 32 | Building 125 | BA004 | Fire-pump CONTROLLER | Fire-pump controller / motor | Hubbell LX1300 | 480V | Electrical inspection/testing only; no flow testing | |
| 33 | Building 125 | BA004 | FIRE PUMP (motor) | Fire-pump controller / motor | US Motors | 480V | Electrical checks only; no flow testing | |
| 34 | Building 125 | BA007 | DISC-TGEN | Safety-switch / service disconnect | SQD Safety Switch | 480V | Field verify tag and rating | |
| 35 | Building 125 | BA004 | DISC-FP | Safety-switch / service disconnect | CH Safety Switch | 480V | Field verify tag and rating | |
| 36 | Building 125 | 1A201 | ELEV 1 DISC | Safety-switch / service disconnect | Westinghouse | 480V | Field verify tag and rating | |
| 37 | Building 125 | 1A201 | ELEV 2 DISC | Safety-switch / service disconnect | Westinghouse | 480V | Field verify tag and rating | |
| 38 | Building 125 | BA007 | T1A | Dry-type transformer | dry-type | 480/208V 45kVA | Field verify tag and rating | |
| 39 | Building 125 | BA007 | T-GEN | Dry-type transformer | dry-type | 480/208V 75kVA | Field verify tag and rating | |
| 40 | Building 125 | 1A328 | T2A | Dry-type transformer | dry-type | 480/208V 112.5kVA | Field verify tag and rating | |
| 41 | Building 125 | 1A454 | T2B | Dry-type transformer | dry-type | 480/208V 75kVA | Field verify tag and rating | |
| 42 | Building 125 | 1A153 | T2C | Dry-type transformer | dry-type | 480/208V 75kVA | Field verify tag and rating | |
| 43 | Building 125 | 1A153 | T3B | Dry-type transformer | dry-type | 480/208V 75kVA | Field verify tag and rating | |
| 44 | Building 125 | 2A145 | T3C | Dry-type transformer | dry-type | 480/208V 112.5kVA | Field verify tag and rating | |
| 45 | Building 125 | 2A145 | T3C2 | Dry-type transformer | dry-type | 480/208V 45kVA | Field verify tag and rating | |
| 46 | Building 128 | RM 1A-131 | MDP | Main switchboard / MDP | 3781815 | SQUARE D | 208Y/120V | |
| 47 | Building 128 | RM 1A-131 | PP-1 | Distribution panelboard | 3781816 | SQUARE D | 208Y/120V | |
| 48 | Building 128 | RM 1A-131 | MP -1 | Distribution panelboard | 3781817 | SQUARE D | 208Y/120V | |
| 49 | Building 128 | RM 1A-131 | EML | Distribution panelboard | 3781818 | SQUARE D | 208Y/120V | |
| 50 | Building 128 | RM 1A-131 | LP-1 | Distribution panelboard | 3781819 | SQUARE D | 208Y/120V | |
| 51 | Building 128 | RM 2A222 | PP_2 | Distribution panelboard | 3781820 | SQUARE D | 208Y/120V | |
| 52 | Building 128 | RM 2A222 | LP_2 | Distribution panelboard | 3781821 | SQUARE D | 208Y/120V | |
| 53 | Building 128 | 800 Amp Outside | Service Disconnect | Safety-switch / service disconnect | 3781822 | SQUARE D | 208Y/120V | |
| 54 | Building 128 | 400 Amp Outside | Service Disconnect | Safety-switch / service disconnect | 3781823 | |||
| 55 | Building 128 | RM 1A-119 | Elevator Disconnect | Safety-switch / service disconnect | 3781824 | Cooper Bussmann | ||
| 56 | Building 128 | Elec Rm 1st Flr | ATS-EML | Automatic transfer switch | 3781855 | ASCO POWER TECHNOLOGIES | ||
| 57 | Building 129 | Main Elec Room 1st Floor | Switchboard MDP | Main switchboard / MDP | 3790007 | CUTLER HAMMER | ||
| 58 | Building 129 | Main Elec Room 1st Floor | Panelboard RP1 | Distribution panelboard | 3790008 | CUTLER HAMMER | ||
| 59 | Building 129 | 2nd Flr Elec Room | Panelboard RP2 | Distribution panelboard | 3790009 | CUTLER HAMMER | ||
| 60 | Building 129 | Main Elec Room 1st Floor | Panelboard MP1 | Distribution panelboard | 3790012 | CUTLER HAMMER | ||
| 61 | Building 129 | Main Elec Room 1st Floor | Panelboard SB1 | Distribution panelboard | 3790014 | CUTLER HAMMER | ||
| 62 | Building 129 | 2nd Flr Elec Room | Panelboard SB2 | Distribution panelboard | 3790015 | CUTLER HAMMER | ||
| 63 | Building 129 | Elec Rm 1st Flr | ATS-SB1 | Automatic transfer switch | 3790017 | ASCO POWER TECHNOLOGIES | ||
| 64 | Building 129 | Elec Rm 1st Flr | ATS-SB2 | Automatic transfer switch | 3790019 | ASCO POWER TECHNOLOGIES | ||
| 65 | Building 130 | 800 AMP Outside | Service entrance Breaker | Safety-switch / service disconnect | 3784136 | SQUARE D | 208Y/120V | |
| 66 | Building 130 | RM-105 | MDP | Main switchboard / MDP | 3784140 | SQUARE D | 208Y/120V | |
| 67 | Building 130 | RM-105 | RP-1 | Distribution panelboard | 3784141 | SQUARE D | 208Y/120V | |
| 68 | Building 130 | RM-105 | SB-2 | Distribution panelboard | 3784144 | SQUARE D | 208Y/120V | |
| 69 | Building 130 | RM-105 | SB-1 | Distribution panelboard | 3784148 | SQUARE D | 208Y/120V | |
| 70 | Building 130 | RM-205 | RP-2 | Distribution panelboard | 3784150 | SQUARE D | 208Y/120V | |
| 71 | Building 130 | RM-205 | MP -1 | Distribution panelboard | 3784153 | SQUARE D | 208Y/120V | |
| 72 | Building 130 | G01 | Elevator Disconnect | Safety-switch / service disconnect | 3784154 | Cooper Bussmann | ||
| 73 | Building 130 | Elec Rm 1st Flr | ATS-SB1 | Automatic transfer switch | 3790371 | ASCO POWER TECHNOLOGIES | ||
| 74 | Building 130 | Elec Rm 1st Flr | ATS-SB2 | Automatic transfer switch | 3790374 | ASCO POWER TECHNOLOGIES | ||
| 75 | Building 131 | Elec Rm Grd Flr | Switchboard MDP | Main switchboard / MDP | 3785660 | CUTLER HAMMER | ||
| 76 | Building 131 | Elec Rm Grd Flr | Panelboard RP1 | Distribution panelboard | 3785663 | CUTLER HAMMER | ||
| 77 | Building 131 | 1st Flr Elec Rm | Panelboard RP2 | Distribution panelboard | 3785667 | CUTLER HAMMER | ||
| 78 | Building 131 | Elec Rm Grd Flr | Panelboard MP1 | Distribution panelboard | 3785670 | CUTLER HAMMER | ||
| 79 | Building 131 | 2nd Flr Elec Rm | Panelboard RP3 | Distribution panelboard | 3785673 | CUTLER HAMMER | ||
| 80 | Building 131 | Elec Rm Grd Flr | Panelboard SBDP1 | Distribution panelboard | 3785675 | CUTLER HAMMER | ||
| 81 | Building 131 | 1st Flr Elec Rm | Panelboard SB1 | Distribution panelboard | 3785678 | CUTLER HAMMER | ||
| 82 | Building 131 | 2nd Flr Elec Rm | Panelboard SB2 | Distribution panelboard | 3785681 | CUTLER HAMMER | ||
| 83 | Building 131 | 1st Flr Elec Rm | Panelboard SB1A | Distribution panelboard | 3785707 | CUTLER HAMMER | ||
| 84 | Building 131 | 2nd Flr Elec Rm | Panelboard SB2A | Distribution panelboard | 3785708 | CUTLER HAMMER | ||
| 85 | Building 131 | 1st Flr Elec Rm | Panelboard SB1B | Distribution panelboard | 3785709 | CUTLER HAMMER | ||
| 86 | Building 131 | 2nd Flr Elec Rm | Panelboard SB2B | Distribution panelboard | 3785711 | CUTLER HAMMER | ||
| 87 | Building 131 | Elec Rm Grd Flr | Panelboard SBDP2 | Main switchboard / MDP | 3785712 | CUTLER HAMMER | ||
| 88 | Building 131 | Kitchen Grd Flr | Panelboard KP | Distribution panelboard | 3785716 | CUTLER HAMMER | ||
| 89 | Building 131 | Elec Rm Grd Flr | Panelboard SBM | Distribution panelboard | 3785717 | CUTLER HAMMER | ||
| 90 | Building 131 | Elec Rm Grd Flr | Panelboard SBMA | Distribution panelboard | 3785718 | CUTLER HAMMER | ||
| 91 | Building 131 | Elec Rm Grd Flr | ATS-ELEV | Automatic transfer switch | 3785734 | ASCO POWER TECHNOLOGIES | ||
| 92 | Building 131 | Elec Rm Grd Flr | ATS-SB1 | Automatic transfer switch | 3785736 | ASCO POWER TECHNOLOGIES | ||
| 93 | Building 131 | Elec Rm Grd Flr | ATS-SB2 | Automatic transfer switch | 3785737 | ASCO POWER TECHNOLOGIES |
File details come from the government source that posted it. Updated .