This document is a Preventive Maintenance Report documenting electrical field inspections performed by Georgia Power Company for the VA Main Campus low voltage electrical distribution system in Atlanta, Georgia. The inspection was conducted on June 22, 2023, with an outage date of July 1, 2023, and includes comprehensive test and inspection data for multiple low voltage circuit breakers located in the GHSB-C3-1 distribution area.

The report contains detailed testing results for eight circuit breakers (Main, CHATS-C3-1, EHATS-C3-1, EHATS-C3-2, EHATS-C3-3, EHATS-C3-4, EHATS-C3-5, and SHATS-C3-1), all manufactured by Eaton with ratings ranging from 800 to 4000 amperes. For each breaker, the report documents circuit breaker name plate data, trip device data, primary fuse data, circuit breaker inspection data (including overall condition, disconnects, secondary disconnects, arc chutes, contacts, and insulation), operation test data, trip unit test data, breaker/fuse DLRO resistance test data, and insulation resistance test data across three phases (A, B, and C). All inspected equipment received "Acceptable" ratings across all inspection categories, with test results indicating proper operational functionality. Each breaker was cleaned, inspected, tested, and secondary injection tested, with all test results marked as final.

View the file

Other files

File Type Posted
Final - AF Label List.xlsx XLSX spreadsheet
final remote - gen device eval.pdf PDF
Attachment B - Fort McPherson Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Drawing List.pdf PDF
GHTA-AG-1.pdf PDF
final main site - util input report.pdf PDF
NHSB-BG-1.pdf PDF
20200603 - Final Combined pdfs.pdf PDF
final main site - util device eval.pdf PDF
final main site - util bus eval.pdf PDF
Existing-Recommended Breaker Settings - Final.xlsx XLSX spreadsheet
final remote - gen results report.pdf PDF
NHSB-CB-1.pdf PDF
final main site - gen bus eval.pdf PDF
Equipment Condition Assessment Sheets.xlsx XLSX spreadsheet
GHTA-CB-1.pdf PDF
final remote - gen input report.pdf PDF
final remote - util results report.pdf PDF
Questions and Answers.docx DOCX document
Attachment C - Trinka-Davis Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
Switchboard C.pdf PDF
Attachment D - Equipment and Test Matrix - REV19.1.docx DOCX document
Electrical Distribution Testing SOW final.docx DOCX document
final remote - util bus eval.pdf PDF
7.6 Facility Condition Assessment - Final Submission.xlsx XLSX spreadsheet
NHSB-C3-2.pdf PDF
final main site - gen device eval.pdf PDF
GHSB-AG-1.pdf PDF
Electrical Directive 1028 D 2020-02-24.pdf PDF
GHTA-CB-2.pdf PDF
final remote - util device eval.pdf PDF
ArcFlash - Atlanta Main Site Final.xls XLS spreadsheet
Attachment A - Main Campus Equipment Schedule - REV19.1.xlsx XLSX spreadsheet
ArcFlash - Atlanta Remote Sites Final.xls XLS spreadsheet
final remote - gen bus eval.pdf PDF
NSHB-CB-2.pdf PDF
NHSB-C3-1 Fast Transfer.pdf PDF
36C24727Q0044 0002.pdf PDF
7.7 Building System Assessment_Atlanta.xlsx XLSX spreadsheet
NHSB-C3-1.pdf PDF
Wage Determination 2015-4471.docx DOCX document
final main site - gen input report.pdf PDF
Switchgear ED.pdf PDF
final main site - gen results report.pdf PDF
final remote - util input report.pdf PDF
Atlanta VA Main Campus 2022 IR Report.pdf PDF
final main site - util results report.pdf PDF
36C24727Q0044 0001.pdf PDF
36C24727Q0044_1 36-Month Electrical Distribution Testing.docx DOCX document
Attachment D - Equipment and Test Matrix - REV19.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .