NHSB-C3-1.pdf
PDF 4 MB Posted
- Attached to
- 36-Month Electrical Distribution Testing
- Solicitation number
- 36C24727Q0044
About this file
This is a Preventive Maintenance Report documenting electrical testing and inspection services performed by Georgia Power Company for the VA Administration at the VA Main Campus in Atlanta, Georgia on February 24, 2024. The report summarizes field preventive maintenance inspections and testing results for the low voltage electrical distribution system, specifically addressing circuit breakers in the NHSB-C3-1 location.
The report includes detailed inspection and test data for five low voltage circuit breakers: Main 52-1 (Eaton Magnum DS, 4000A/200kA), Main 52-2 (Eaton Magnum DS, 4000A/200kA), Tie 52-T (Eaton Magnum DS, 4000A/200kA), Chiller #2 (Eaton Magnum DS, 1600A/200kA), and Provision Front Parking Lot Deck 5 (Eaton Magnum DS, 800A/65kA). Each breaker underwent comprehensive testing including circuit breaker inspection data, operation tests, trip unit test data, breaker/fuse DLRO resistance testing, and insulation resistance testing across all three phases. All inspected equipment was rated as acceptable in condition and operation, with test results documented as final. The breakers were cleaned, inspected, tested, and underwent secondary injection testing. All components including disconnects, arc chutes, contacts, insulation, operating mechanisms, lubrication, and auxiliary devices were verified as acceptable for continued service.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .