NHSB-CB-1.pdf
PDF 4 MB Posted
- Attached to
- 36-Month Electrical Distribution Testing
- Solicitation number
- 36C24727Q0044
About this file
This is a Preventive Maintenance Report documenting electrical testing and inspection services performed by Georgia Power Company Energy Services for the VA Administration Main Campus located in Atlanta, Georgia.
Georgia Power Company Power Services conducted electrical field preventive maintenance inspections on the VA Main Campus low voltage electrical distribution system on June 22, 2023, with an outage date of June 1, 2023. The report provides comprehensive test and inspection data for six low voltage circuit breakers located in the NHSB-CB-1 unit. All inspected breakers—identified as Main Bldg D, MESE, MS, Provision, and SWHKA—are manufactured by Eaton with ratings ranging from 800A to 2000A. Each breaker underwent detailed circuit breaker inspection data collection, operation testing, trip unit testing, breaker/fuse DLRO resistance testing, and insulation resistance testing across three phases (A, B, and C). All inspection results were documented as "Acceptable" for overall condition, primary disconnects, secondary disconnects, arc chutes, contacts, insulation, operating mechanisms, lubrication, auxiliary devices, and frame/interlocks. Operation tests including anti-pump, trip tests, racking mechanics, and spring dumps all resulted in acceptable performance. The report notes that all breakers were cleaned, inspected, and tested, with secondary injection testing performed. Test results are confirmed as final.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .