Attachment C - Trinka-Davis Equipment Schedule - REV19.1.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- 36-Month Electrical Distribution Testing
- Solicitation number
- 36C24727Q0044
About this file
This is an Equipment Schedule for a 36-month electrical distribution testing, inspection, maintenance, calibration, and infrared scanning contract at the Trinka-Davis Veterans Village Clinic in Carrollton, Georgia, operated by the Atlanta VA Health Care System (Station 508).
The schedule identifies 31 pieces of electrical equipment requiring inspection and testing services across two facility locations: the CBOC/CLC (Community Based Outpatient Clinic/Community Living Center) and the FOB (Facility Operations Building). Equipment includes six distribution panelboards at the CBOC/CLC rated at 480V, six dry-type transformers (480/208V, 75 kVA each), one medium-voltage liquid-filled main distribution transformer (750 kVA; 12,470GY/7,200 to 480Y/277V), one main switchboard/MDP at 480V/400A, eleven additional distribution panelboards at various locations, four automatic transfer switches for emergency-power distribution, and four generator output main breakers. The equipment schedule specifies equipment tags, VA asset numbers, manufacturer details, voltage ratings, and applicable notes. Testing and maintenance levels for each equipment class are detailed in Attachment D and the Statement of Work (SOW Section 3.1). This schedule was issued as Revision 19 on August 25, 2026, and serves as the bidder-facing document governing asset identity, location, and base quantities for the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C
| ATTACHMENT C | EQUIPMENT SCHEDULE | Trinka-Davis Veterans Village Clinic (Carrollton, GA) | ||||||||
| Electrical distribution inspection, testing, maintenance, calibration, and infrared scanning. The required test and maintenance level for each equipment class is stated in Attachment D and in the Statement of Work. This schedule governs asset identity, asset location, and base quantities (SOW Section 3.1). | ||||||||
| Solicitation attachment control: Revision 19 | Date: August 25, 2026 | Atlanta VA Health Care System (Station 508) | Issued with the solicitation as a bidder-facing equipment schedule. | ||||||||
| Item | Building | Location | Equipment tag / description | Equipment class | VA asset number / Maximo asset ID | Make / model | Voltage / rating | Notes |
| 1 | CBOC/CLC | CBOC E096 | H1A-1 | Distribution panelboard | GE AD | 480V | ||
| 2 | CBOC/CLC | CBOC E096 | H1A-2 | Distribution panelboard | GE AD | 480V | ||
| 3 | CBOC/CLC | CLC-A A016 | HN1 | Distribution panelboard | GE AE | 480V | ||
| 4 | CBOC/CLC | CLC-B B016 | HN2 | Distribution panelboard | GE AE | 480V | ||
| 5 | CBOC/CLC | CLC-C C016 | HE | Distribution panelboard | GE AE | 480V | ||
| 6 | CBOC/CLC | CLC-D D016 | HW | Distribution panelboard | GE AE | 480V | ||
| 7 | CBOC/CLC | CBOC E096 | T-L1A | Dry-type transformer | dry-type | 480/208V, 75 kVA | ||
| 8 | CBOC/CLC | CBOC E096 | T-L1B | Dry-type transformer | dry-type | 480/208V, 75 kVA | ||
| 9 | CBOC/CLC | CLC-A A016 | T-LN1 | Dry-type transformer | dry-type | 480/208V, 75 kVA | ||
| 10 | CBOC/CLC | CLC-B B016 | T-LN2 | Dry-type transformer | dry-type | 480/208V, 75 kVA | ||
| 11 | CBOC/CLC | CLC-C C016 | T-LE | Dry-type transformer | dry-type | 480/208V, 75 kVA | ||
| 12 | CBOC/CLC | CLC-D D016 | T-P1 | Dry-type transformer | dry-type | 480/208V, 75 kVA | ||
| 13 | FOB | Outside Facility Operations Bldg | Main Distribution Transformer | Medium-voltage main distribution transformer (liquid-filled) | 20608196173 | ERMCO | 750 kVA; 12,470GY/7,200 to 480Y/277 | Liquid-filled mineral oil; VA-owned/maintained |
| 14 | FOB | Facility Operations Bldg G004 | MDP MSA | Main switchboard / MDP | Eaton Cutler Hammer | 480V, 400A | Fed from main distribution transformer | |
| 15 | FOB | F.O.B. G004 | MSA BRKR PNL L1A | Distribution panelboard | GE / Eaton | 480V | ||
| 16 | FOB | F.O.B. G004 | MSA BRKR PNL L1B | Distribution panelboard | GE / Eaton | 480V | ||
| 17 | FOB | F.O.B. G004 | MSA BRKR PNL HP | Distribution panelboard | GE / Eaton | 480V | ||
| 18 | FOB | F.O.B. G004 | INV Equip BRKR PNL EGHA | Distribution panelboard | GE / Eaton | 480V | ||
| 19 | FOB | F.O.B. G004 | MSA BRKR PNL H1A | Distribution panelboard | General Electric | 480V | Source-side panel at FOB; field-verify | |
| 20 | FOB | F.O.B. G004 | MSA BRKR PNL HN1 | Distribution panelboard | General Electric | 480V | Source-side panel at FOB; field-verify | |
| 21 | FOB | F.O.B. G004 | MSA BRKR PNL HN2 | Distribution panelboard | General Electric | 480V | Source-side panel at FOB; field-verify | |
| 22 | FOB | F.O.B. G004 | MSA BRKR PNL HE | Distribution panelboard | General Electric | 480V | Source-side panel at FOB; field-verify | |
| 23 | FOB | F.O.B. G004 | MSA BRKR PNL HW | Distribution panelboard | General Electric | 480V | Source-side panel at FOB; field-verify | |
| 24 | FOB | GEN ENCL | ATS #1 | Automatic transfer switch | Eaton Cutler Hammer | 480V | Emergency-power distribution | |
| 25 | FOB | GEN ENCL | ATS #2 | Automatic transfer switch | Eaton Cutler Hammer | 480V | Emergency-power distribution | |
| 26 | FOB | GEN ENCL | ATS #3 | Automatic transfer switch | Eaton Cutler Hammer | 480V | Emergency-power distribution | |
| 27 | FOB | GEN ENCL | ATS #4 | Automatic transfer switch | Eaton Cutler Hammer | 480V | Emergency-power distribution | |
| 28 | FOB | FOB G004 Mech Rm | MDP BRKR (GEN 1) | Generator output / main breaker | General Electric | 480V | Output breaker only; generator set excluded | |
| 29 | FOB | FOB G004 Mech Rm | MDP BRKR (GEN 2) | Generator output / main breaker | General Electric | 480V | Output breaker only; generator set excluded | |
| 30 | FOB | FOB G004 Mech Rm | MDP BRKR (GEN 3) | Generator output / main breaker | General Electric | 480V | Output breaker only; generator set excluded | |
| 31 | FOB | FOB G004 Mech Rm | MDP BRKR (GEN 4) | Generator output / main breaker | General Electric | 480V | Output breaker only; generator set excluded |
File details come from the government source that posted it. Updated .