GHTA-CB-2.pdf
PDF 2 MB Posted
- Attached to
- 36-Month Electrical Distribution Testing
- Solicitation number
- 36C24727Q0044
About this file
This is a Preventive Maintenance Report documenting electrical field inspections conducted by Georgia Power Company for the VA Main Campus low voltage electrical distribution system in Atlanta, Georgia. The report, dated July 28, 2023, summarizes test and inspection results for low voltage circuit breakers during planned maintenance activities.
The inspection covered two Eaton Magnum DSI/MDS20 circuit breakers (Main #1 and Main #2), each rated at 2000A/65 kA with Eaton Digitrip 1150+ trip devices rated at 1600A. Both breakers underwent comprehensive testing including circuit breaker inspection data, operation tests, trip unit test data, breaker/fuse DLRO (dead load resistance) testing, and insulation resistance testing across all three phases (A, B, and C). All inspection categories—overall condition, primary disconnects, secondary disconnects, arc chutes, contacts, and insulation—were marked as "Acceptable" in both as-found and as-left conditions. Operation tests for anti-pump, trip fires, racking mechanism, and spring dump all returned "Acceptable" results. Trip unit testing data showed all parameters within acceptable ranges, with specific test settings for LTPU, LTD, STPU, STD, INST PU, and GFPU documented. Both breakers were cleaned, inspected, tested, and underwent secondary injection testing, with final test results confirmed as final. The report was signed by Greg Bates, Utility Service Team Member.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .