This file is Section 16000 of the electrical specifications for the Bethlehem Housing Authority's project to renovate 20 apartments at the Parkridge family development in Pennsylvania. The specifications establish general administrative and procedural requirements for all electrical installations on the project, including submittals, maintenance manuals, rough-in work, electrical installations, and cutting and patching operations. Contractors must submit two copies of electrical shop drawings, product data, and technical information in accordance with General Requirements procedures. Sealed bids are due electronically on the PennBid site by Thursday, October 22, 2026 at 11:00 AM. The successful bidder must provide a satisfactory Bid Bond in the amount of 10% of the bid amount, secured by a surety company appearing in the Department of Treasury Circular #570, and furnish Performance and Payment Bonds upon contract award. Contract documents and drawings are available on the PennBid website, and questions may be directed to Scott Speshok at 610-483-0322.
The specifications require contractors to deliver all electrical products properly identified and store them in secure, dry locations protected from damage or weather. All electrical systems, equipment, and materials must be coordinated and sequenced for efficient work flow, with dimensions verified by field measurements and installations conforming to approved submittals and drawings. The Electrical Contractor is responsible for sealing all penetrations in fire-rated assemblies and crawl space walls with approved fire-rated foam or sealant. Cutting and patching work must protect adjacent structures and finishes, with dust and noise barriers installed to prevent transmission to adjacent occupied areas. The Bethlehem Housing Authority reserves the right to reject any or all bids or waive any informalities or irregularities. Additional project information is available at www.Bethlehemhousing.org.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 16000
BASIC ELECTRICAL REQUIREMENTS
SUMMARY:
This Section includes general administrative and procedural requirements for electrical installations. The following administrative and procedural requirements are included in this Section to expand the General Requirements already specified:
1. Submittals.
2. Maintenance manuals.
3. Rough-ins.
4. Electrical installations.
5. Cutting and patching.
Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, Drawings, and these specifications.
SUBMITTALS:
Follow the procedures set forth in the General Requirements.
Submit two (2) copies of related electrical shop drawings, product data, and technical information.
MAINTENANCE MANUALS:
Prepare maintenance manuals in accordance with the General Requirements. In addition include 3 copies of the following information for equipment items:
1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts for all electrical equipment scheduled to be installed.
1. Manufacturer’s printed operating procedures to include start-up, break-in, and routine and normal operating instructions: regulation, control, stopping, shutdown, and emergency instructions; and summer and winter operating instructions.
2. Maintenance procedures for routine preventative maintenance and trouble-shooting; disassembly, repair and reassemble; aligning and adjusting instruction.
BASIC ELECTRIC REQUIREMENTS
16000-1
DELIVERY, STORAGE AND HANDLING:
Deliver product to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification.
Store products and material in a secure, dry location; and protect from damage or weather.
ROUGH-IN:
Verify final locations for rough-ins with field measurements and the requirements of the actual equipment or material being connected.
Refer to any and all equipment specifications, which may be contained in other Sections of these specifications or on the Drawings, for additional rough-in requirements.
ELECTRICAL INSTALLATIONS:
Sequence, coordinate, and integrate the various elements of electrical systems, materials and equipment. Comply with the following requirements:
1. Coordinate electrical systems, equipment, and materials installation with other building components.
2. Sequence, coordinate, and integrate installations of electrical materials and equipment for efficient flow of the work.
3. Verify all dimensions by field measurements.
4. Where mounting heights of exact rough-in dimensions are not detailed, install system, material, and equipment as directed by the Owner and to provide the maximum head room possible.
5. Install system, material and equipment to conform with approved submittal data and drawing to the greatest extent possible. Conform to arrangements indicated by the contract documents, recognizing that portions of the work are shown only in diagrammatic form. If coordination requirements would conflict with individual system requirements, refer conflicts to the Owner.
16000-2
6. Install systems, material, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed in exposed finished spaces.
7. Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment or equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. Consult with Owner in field for exact fixture locations.
8. Install systems, material, and equipment giving right-of-way priority to systems required to be installed at a specific slope.
9. Electrical Contractor shall seal all penetrations in fire-rated assemblies, and crawl space walls with approved fire-rated foam or sealant.
CUTTING AND PATCHING:
Perform cutting and patching in accordance with the following requirements:
1. Uncover work to provide for installation of ill-timed work.
2. Remove and replace defective work.
3. Remove and replace work not conforming to the requirements of the contract documents.
4. Install equipment and materials in existing and/or new structures.
5. Upon written instructions from the Owner, uncover and restore work to provide for Owner observation of concealed work.
6. Remove samples of installed work as specified for testing.
Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical items indicated to be removed and items make obsolete by new work.
Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed.
16000-3
Provide temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to the adjacent areas.
Protect adjacent installations of equipment and materials during cutting and patching operations.
Patch existing finished surfaces and building components using the materials matching existing materials using experienced workmen qualified in using the methods and material for the type of surface or building component being patched.
Patch finished surfaces and building components using new material specified for the original installation and using experienced workmen.
PROJECT CONDITIONS:
In addition to Section 02210, the following project conditions apply in conditions affecting Selective Demolition in existing buildings:
1. Protect adjacent materials indicated to remain. Install and maintain dust and noise barriers to keep dirt dust, and noise from being transmitted to adjacent occupied areas. Remove protection and barriers when demolition is complete, or as otherwise directed by the Owner.
END OF SECTION
BASIC ELECTRIC REQUIREMENTS
16000-4