This is a specification document for wood doors and frames associated with the Bethlehem Housing Authority's Renovate 20 Apartments in Parkridge - Phase 2 project in Pennsylvania. The specification requires pre-hung flush luan doors complete with painted finishes and installed hardware for interior applications as shown on project drawings. Contractors must submit product data within 15 days of contract award, including manufacturer specifications, shop drawings detailing frame types and door designs, installation procedures, and technical information for owner approval. Sealed bids for the overall apartment renovation project are due Thursday, October 22, 2026 at 11:00 AM via the PennBid electronic bidding platform. A bid bond equal to 10% of the bid amount, secured by a surety company listed in Department of Treasury Circular #570, must accompany each submission. The successful bidder will be required to furnish Performance and Payment Bonds. Contract documents and specifications are available on the PennBid website, and questions should be directed to Scott Speshok at 610-483-0322.

The specification details specific product requirements including hollow-core wood doors with luan face skins, hardwood stiles, and MDF rails as manufactured by Jeld-Wen Inc. or owner-approved equivalents. Hardware specifications include three stainless steel hinges, Schlage "A" series locks with stainless steel Plymouth knobs (model A40S for bathrooms with privacy locks; model A10S for other locations), and specified door stops. Doors must be unfinished at delivery and field-finished by the contractor with one primer coat and two finish coats per Section 09900. The specification also requires access panel doors in kitchen ceilings for upstairs tub trap access, with fireproofing of interior voids as directed by the City of Bethlehem's Inspections Department and Fire Department. Delivery must occur after plaster and cement are dry and after the building reaches average prevailing humidity. The Bethlehem Housing Authority reserves the right to reject any or all bids or waive irregularities.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
09670 Vinyl Composition Tile.pdf PDF
01010 General Work Requirements.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
02210 Selective Demolition.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
06650 Solid Polymer Fabrication.pdf PDF
15400 Plumbing.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01710 Cleaning.pdf PDF
01620 Storage and Protection.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 08200

WOOD DOORS

SUMMARY:

Provide pre-hung flush luan doors; complete in place, painted and with hardware installed; where shown on the drawings; as specified herein, and as needed for a complete and proper installation.

Documents affecting work of this section include, but are not necessarily limited to General Conditions, Supplementary Conditions, Drawings, and these specifications.

SUBMITTALS:

Comply with pertinent provisions of the General Requirements.

Submit product data within 15 days of award of the contract to the contractor.

Provide material list of items proposed to be incorporated into the project which are included under this section of the specifications. Include manufacturer’s specifications and other data needed to prove compliance with the specified requirements; shop drawings showing details of each frame type, elevations of door designs, details of openings, and details of construction, installation and anchorage.

Provide manufacturer’s recommended installation procedures which, when approved by the owner, will become the basis for accepting or rejecting actual installation procedures used on the work.

Provide technical information on doors for owner approval.

QUALITY ASSURANCE:

Use adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for the proper performance of work covered under this section.

In addition to complying with pertinent codes and regulations of governmental agencies having jurisdiction, comply with:

1. Architectural Woodwork Quality Standards of the Architectural Woodwork Institute, for the grade or grades specified.

08200-1

DELIVERY, STORAGE AND HANDLING:

Deliver doors to the job site after plaster and cement are dry, and after the building has reached average prevailing humidity of its locality.

Deliver doors in manufacturer’s original containers, clearly marked with manufacturer’s name, brand name, size, thickness and identifying symbol on the covering.

Seal all four edges of unfinished doors when delivered to the job site.

STORAGE:

Stack flat on 2’ X 4’ lumber, laid 12” from the ends and across the center. Under the bottom door and over the top of the stack provide corrugated cardboard or plywood tO protect the door surfaces.

Store doors in areas where there will be no great variations in humidity.

Do not drag doors across one another; lift doors and carry them into position.

PRODUCTS:

Provide hollow core wood doors of the type and style indicated on the drawings and/or herein.

1. Warp tolerance shall be in accordance with NWMA I.S.-1

2. Face skins: Luan wood – unfinished. As manufactured by Jeld-Wen Inc., or owner approved equal.

3. Stiles and rails: Stiles shall be 7/8” hardwood. Top and bottom rails shall be 2” MDF.

4. Hinges: Provide three raised hinges, 3 1/2” x 3 1/2 “; stainless steel; with light brush satin finish.

5. Finish: Doors shall be supplied unfinished. Doors shall be finished in the field by the Contractor with one primer coat and two finish coats per section 09900.

08200-2

PRE-HUNG FRAMES:

Provide adjustable “Split Jamb” wood pre-hung frames for all interior swing doors.

EXECUTION:

Examine the areas and conditions under which work of this section will be performed.

Correct all conditions detrimental to timely and proper completion of the work. Do not proceed until all unsatisfactory conditions are corrected.

Installation:

1. Fitting and Machining: Unless doors are completely fitted and machined at the mill, fit them for width by planing and fit for height by sawing.

a. Bottom – ¾” clearance maximum.

b. Top – 1/8” clearance maximum.

c. Lock edge and hinge edge – Bevel 1/8” in 2” maximum.

2. Machine doors for hardware in accordance with recommendations of the hardware manufacturers, as those recommendations have been approved by the owner.

Replace or re-hang doors which are hinge bound and do not swing or operate properly.

HARDWARE:

Locks:

1. Bathrooms: Schlage “A” series # A40S. Privacy. Stainless steel Plymouth knob with #630 satin finish. Include latch, strike and all necessary accessories.

2. All other locations: Schlage “A” series # A10S. Passage. Stainless Steel Plymouth knob with #630 satin finish. Include latch, strike and all necessary accessories.

Door Stops:

5” dia. self-adhesive plastic disc, Prime Line U-9244 or 1 7/8” dia. self-adhesive with raised rubber center, Ives 411RW’ depending on application.

08200-3

ACCESS PANEL DOORS:

Provide access panel door and frame for each apartment. Door shall be located in kitchen ceiling below upstairs tub trap for trap access. Refer to contract drawings for size and specifications of door and frame. Properly fire-proof void inside of access panel as directed by the City of Bethlehem’s Inspections Department, Fire Department, and Owner.

COMPLIANCE:

The owner reserves the right to request and pay for an inspection by a representative of the referenced organization to determine that the work of this section has been performed in accordance with the specified standard.

END OF SECTION