09650 Resilient Sheet Flooring.pdf
PDF 128 KB Posted
- Attached to
- Renovate 20 Apartments in Parkridge - Phase 2
- Solicitation number
- US.245854
- Issued by
- Northampton County, Pennsylvania
About this file
This is a specification section for resilient sheet flooring installation related to the Bethlehem Housing Authority's project to renovate 20 apartments at the Parkridge family development in Pennsylvania. The scope of work requires contractors to provide and install resilient sheet vinyl flooring, vinyl wall base, resilient edge strips, and all necessary adhesives and accessories as specified. The project calls for AHF Contract 2.0 mm inlaid heterogeneous vinyl sheet flooring, 4-inch high vinyl wall base per FS SS-W-40 Type II specifications, and installation over ¾-inch CDX plywood subfloors with ⅜-inch luan underlayment. Contractors must submit product data, materials lists, and samples within 15 days of contract award for owner approval. Sealed bids for the overall apartment renovation project are due Thursday, October 22, 2026 at 11:00 AM, submitted electronically through the PennBid website. A bid bond secured by a Department of Treasury Circular #570-approved surety company in the amount of 10 percent of the bid is required with each submission.
Installation requirements specify that work must commence only after all other finishing operations and painting are complete and the permanent heating system is operational. The contractor must maintain minimum temperatures of 65 degrees Fahrenheit for 48 hours prior to, during, and 48 hours following installation, with a minimum of 55 degrees Fahrenheit thereafter. A successful bond and moisture test must be completed before installation begins. Approved adhesives include Armstrong S-599 or Henry 356, with Armstrong S-185 primer required for luan underlayment. The contractor is responsible for substrate preparation including patching, leveling, sealing gaps, and cleaning, and must use only skilled, experienced workmen familiar with manufacturer-recommended installation procedures. Upon completion, the contractor must strip, damp mop, and apply two coats of floor wax using manufacturer-recommended materials, then polish and buff floors with an owner-approved commercial electric buffing machine. The successful bidder must furnish satisfactory Performance and Payment Bonds as determined by the Bethlehem Housing Authority.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 09650
RESILIENT SHEET FLOORING
SUMMARY:
Provide resilient sheet flooring where shown on the drawings, as specified herein, and as needed for a complete and proper installation. Include all necessary manufacturer recommended accessories and adhesives.
Documents affecting work of this section include, but are not necessarily limited to, General Conditions Supplementary Conditions, Drawings, and these specifications.
SUBMITTALS:
Comply with the pertinent provisions of the General Requirements.
Submit product data within 15 days of award of contract to the contractor.
Submit product data and materials list of items to be provided under this section.
Supply sufficient technical data to demonstrate compliance with the specified requirements.
Provide manufacturer’s recommended installation procedures which, when approved by the owner, will be incorporated into these Specifications and contract documents.
Provide samples of each item proposed for use under this section. Provide samples for color, pattern and specified grade.
QUALITY ASSURANCE:
Use adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for the proper performance of work covered under this section.
DELIVERY, STORAGE, AND HANDLING:
Comply with pertinent provisions of the General Requirements.
MATERIALS:
Provide colors and patterns as selected by the Owner from standard colors and patterns of the approved manufacturer or as otherwise shown on the drawings or further specified in this section of the specifications.
09650-1
ADHESIVES:
Sheet Vinyl: Armstrong S-599 or Henry 356 adhesive
ASPHALT EMULSIONS AND OTHER NON-WATERPROOF ADHESIVES WILL
NOT BE ACCEPTED.
Underlayment Primer: Apply Armstrong S-185 primer on all luan underlayment.
Vinyl Sheet Flooring: Shall be AHF Contract, 2.0 mm Inlaid Heterogeneous vinyl sheet flooring. Color: As selected by Owner.
Vinyl Wall Base: FS SS-W-40, Type II, 4” high, 0.080” thick. Use standard top-set cove unless otherwise noted. Provide in continuous rolls. Color: as selected by the Owner.
Resilient Edge Strips: Not less than 1” width, 1/8” gauge, tapered bull-nose edge, color to match flooring edge or as selected by the Owner.
OTHER MATERIALS:
Provide all other material, not specifically described but required for a complete and proper installation, subject to Owner approval.
Sub-floor: ¾” CDX plywood, as shown on the drawings.
Underlayment: ¼” luan plywood.
EXECUTION:
Examine all areas and conditions under which work of this section will be performed.
Promptly correct all conditions detrimental to timely and proper completion of the work.
Do not proceed until all unsatisfactory conditions are corrected.
Install new floor joists, sub-floor and underlayment as shown on the contract drawings.
Stagger joints of differing layers of plywood in both directions.
09650-2
Prepare and verify that substrate is smooth, level, at required finish elevation, and without 1/8” in 10’- 0” variation for entire substrate area.
Patch and level all joints and nails or staples using leveling material recommended by the manufacturer of flooring material approved for use, subject to Owner approval.
Patch and seal all gaps in plywood floor including the perimeter of pipe and any other material protruding through plywood flooring material.
Prior to laying material, broom clean and vacuum the surface to be covered, and inspect the sub-floor.
Apply concrete primer, for installation upon concrete slabs, in accordance with manufacturer’s recommendations and as approved by the Owner.
INSTALLATION:
Install material only after all other finishing operation, (including painting), have been completed and after permanent heating system is fully operational.
Verify that the moisture content of all concrete slab areas, building air temperature, and relative humidity are within the limit recommended by the manufacturer of material being used.
Maintain reference markers, holes, and openings that are in place or plainly marked for future cutting by repeating on the finish surface as marked in the sub-floor. Use chalk or other nonpermanent marking devices. Ensure all cut in material are accurate and neat in appearance with smooth distinct edges.
Sub-floors/underlayment shall be dry, clean, and smooth. They shall be free from paint, varnish, solvents, wax, oil, dust, dirt, and all other foreign matter.
For more detailed requirements of concrete sub-floors, and for trowelable, metal, and wood sub-floor and underlayment requirements, refer to Armstrong Engineered Installation System manual, F-5061, or equal.
09650-3
A successful Bond and Moisture Test must be completed before starting installation.
The Calcium Chloride Test for moisture may also be conducted.
Temperatures shall be maintained at a minimum of 65 degrees F. (18C) for a minimum of 48 hours prior to, during installation, and for a minimum of 48 hours following installation of flooring material. A minimum temperature of 55 degrees F. shall be maintained thereafter. Condition all flooring materials and adhesives to room temperature prior to starting the installation. Protect all material form the direct flow of heat from hot air registers, radiators, or other heating fixture or appliances.
Use adhesive, welded seams and under cuts in accordance with the floor manufacturer’s requirements. Fill and seal all joints or seams at the top of flooring material following installation. Use Armstrong S-585 seam cleaner & Armstrong S-570 seam coating or, seam cleaner and coating as recommended by the manufacturer and approved by the Owner. Follow the manufacturer’s recommended procedure for seam filling and coating. Armstrong S-591 seam coating accelerator may be used when approved in advance by the manufacturer and the Owner.
Cut sheet vinyl into required lengths and sizes.
Layout material in a manner to achieve a minimum number of seams, and to allow for pattern match where abutting edges meet. Double cut if necessary.
Lay cut sheets flat and allow to come to room temperature prior to installation.
Install the sheets, and roll the floor surface to work wrinkles and air pockets out pat the outermost edges.
Fit the sheet vinyl neatly and tightly into breaks, recesses, against bases, around pipes and penetrations, under saddles and thresholds, and around permanent cabinets and equipment.
Where integral base is called for: Provide cove strip to ease transition at intersection between floor and wall. Cut fit and miter-weld at internal and external corners. Cap exposed edge with metal trim securely fastened in place, with top edge of trim level, and with all trim joints mitered.
09650-4
Install vinyl cove base or wood baseboard as shown on the drawings.
Install cove base in strict accordance with the manufacturer’s recommended installation procedures as approved by the Owner.
Caulk perimeter of floor where floor material meets wood baseboard. Maximum width of sealant joint shall be 1/8”. Provide type and color of sealant as directed by Owner.
CLEANING AND PROTECTING:
Protect all newly installed flooring material by whatever means necessary. Repair or replace material damaged during or following installation and prior to final acceptance, as directed by the Owner.
Remove all excess adhesive and other blemishes from exposed surfaces, using neutral cleaner recommended by the manufacturer of the resilient material.
The contractor shall strip all floors, damp mop and apply two coats of floor wax prior to returning possession of the apartment back over to the Owner. Use stripping and waxing material as recommended by the manufacturer of the approved flooring material being used. Polish and buff floors using an Owner approved commercial electric buffing machine.
END OF SECTION
09650-5