About this file

This is a technical specifications document for solid polymer fabrication work associated with a renovation project for 20 apartments at the Parkridge family development in Bethlehem, Pennsylvania. The Bethlehem Housing Authority is accepting sealed bids for this Phase 2 renovation project, with bids due electronically through PennBid by Thursday, October 22, 2026 at 11:00 AM. The work involves providing solid polymer kitchen countertops as specified in the contract drawings, including fabrication and installation of countertops with backsplashes, drop-in sink accommodations, and special edge details. Acceptable products are limited to Corian surfaces manufactured by DuPont in the Essential series or Wilsonart Solid Surfacing from price group 3, with the specific color requirement being Corian "Sandstone" or equivalent colors chosen by the owner. Fabrication must be performed by a certified fabricator/installer approved by the owner, with components fabricated in the shop to the greatest extent possible and then installed in the field according to manufacturer specifications and contract drawings.

The contract requires a satisfactory Bid Bond secured by a Treasury Circular #570-approved surety company in the amount of 10 percent of the bid, and the successful bidder must furnish Performance and Payment Bonds. All work must include a minimum 10-year material and labor warranty from both the contractor and supplier/manufacturer. Product data must be submitted within 15 days of contract award, along with a 2-foot by 2-foot sample countertop for owner approval. The material specified must be homogeneous filled acrylic meeting ANSI Z 124.3, 124.6 Type 6, and Federal Specification WW-P-541E/GEN, with a matte finish and gloss rating of 5/20. Upon completion, the contractor must provide countertop care information and maintenance documentation to the owner and conduct a review with the maintenance supervisor. Contract documents, specifications, and drawings are available on the PennBid website, and questions should be directed to Scott Speshok at 610-483-0322.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
09670 Vinyl Composition Tile.pdf PDF
01010 General Work Requirements.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
02210 Selective Demolition.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
15400 Plumbing.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
08200 Flush Wood Doors and Frames.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01710 Cleaning.pdf PDF
01620 Storage and Protection.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 06650

SOLID POLYMER FABRICATION

SUMMARY:

Provide solid polymer kitchen countertops where shown on the contract drawings, as specified herein, and as needed for a complete and proper installation.

Documents affecting work of this section include, but are not limited to, General Conditions, Supplementary Conditions, Drawings, and these Technical Specifications.

QUALITY ASSURANCE:

Use an adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for proper performance of the work of this Section.

Provide a minimum 10 year material and labor warranty from, contractor and supplier/manufacturer, for all solid surface countertops.

SUBMITTALS:

Comply with the pertinent provisions of the General requirements.

Submit product data within 15 days of award of contract to the contractor.

Submit product data and material list of items to be provided under this Section. Supply sufficient technical data to demonstrate compliance with the specified requirements.

Manufacturers recommended installation procedures which, when approved by the Owner, will become the basis for accepting or rejecting actual installation procedures used on the work.

Provide 2’ x 2’ sample countertop for Owner approval.

DELIVERY, STORAGE AND HANDLING:

Comply with the pertinent provisions of the General Requirements.

06650-1

ACCEPTABLE PRODUCTS:

CORIAN SURFACES: As manufactured by the Dupont Co.:

Wilmington,DE 19898; Ph # (800) 426-7426

WILSONART SOLID SURFACING: As manufactured by Wilsonart International:

11 Twosome Dr., Moorestown, NJ 08057;

Ph. # (609) 866-9400

Countertop colors for Corian shall be from the Essential series.

Countertop colors for Wilsonart solid surface material shall be chosen from price group 3.

Colors from other manufacturers (that are made in the U.S.) shall be chosen from a price group that provides the same or similar color selections as Wilsonart price group 3 or Corian Essential series..

MATERIAL:

Provide homogeneous filled acrylic; not coated, laminated, or of composite construction;

meeting ANSI Z 124.3 & 124.6. Type 6, and Fed Spec.

WW-P-541E/GEN.

Material shall have minimum physical and performance properties specified in the manufacturer’s literature.

Superficial damage to the depth of 0.010” (.25mm) shall be repairable by sanding and polishing.

Countertops shall be fabricated to receive drop-in stainless steel sinks.

Countertop design shall consist of ½” thick counter top with built-up No-Drip edge at front and exposed sides (next to the range and refrigerator). Provide edge details as indicated on the contract drawings.

Provide countertop complete with backsplash of size shown on the contract drawings.

06650-2

Countertop, Backsplash, and Special Edge shall be Corian – “Essential” Series;

countertop color: “Sandstone”.

Colors from other manufacturers shall be equivalent, and chosen by the owner.

JOINT ADHESIVE:

Manufacturers standard two-part adhesive kit to create inconspicuous, non-porous joints, using a chemical bond process.

FABRICATION:

Fabrication shall be performed by a CERTIFIED FABRICATOR/INSTALLER, as approved by the Owner.

Fabricate components in shop to the greatest extent possible and practical. Fabricate in accordance with size and shape indicated on the contract drawings, approved shop drawings and manufacturers requirements.

Form joints between components using manufacturer’s standard joint adhesive. Joints shall be inconspicuous in appearance and without voids. Secure 2” (50mm) wide reinforcing strips beneath each joint. No joints shall be made in the sink cut-out section of the countertop.

Provide all necessary holes and cut-outs for plumbing fixtures and accessories as indicated on the contract drawings, plumbing fixture schedule, and contractor submittals.

Rout and finish component edges to a smooth uniform finish. Rout all cut-outs and sand all edges smooth. Repair or reject all inaccurate or defective material or workmanship, as directed by the Owner.

All surfaces shall have a uniform finish, acceptable to the Owner. Finish shall be Matte, with a gloss rating of 5/20.

Form backsplashes and special edges using the same material and finish as countertop material.

Backsplash and special edge thickness shall be ½” (13mm), fabricated in shop or field.

Provide backsplash height as shown on the contract drawings.

06650-3

EXECUTION:

Install components plumb and level, in accordance with contract drawings, approved shop drawings, product installation details and manufacturer requirements.

Form field joints using manufacturers recommended adhesive, with joints inconspicuous in finished work. Keep components and hands clean when making joints.

Secure drop-in sink bowls using manufacturers recommended adhesives and color-matched silicon sealant.

Provide backsplashes and ends splashes as indicated on the contract drawings. Adhere to countertop and wall using standard color-matched sealant.

Keep hands and components clean during installation. Promptly and properly remove excess adhesive, sealants, or other stains. Components shall be clean by date of substantial completion.

Make plumbing connections to sinks in accordance with standard plumbing practices.

Completely and properly protect all surfaces from damage until final acceptance and possession the structure is turned back over to the Owner. Repair or replace all surface material damaged or unacceptable to the Owner. Repair or replacement of work shall be at the contractor’s expense and to complete satisfaction of the Owner.

Provide countertop care information and maintenance video, or equivalent data, to the Owner. Review maintenance procedures and warranty documents with Maintenance Supervisor at completion of renovation work.

END OF SECTION