VINYL COMPOSITION TILE FLOORING SPECIFICATION

This specification document outlines the requirements for vinyl composition tile (VCT) flooring installation as part of the Bethlehem Housing Authority's renovation project for 20 apartments at the Parkridge family development in Pennsylvania. The scope of work requires contractors to provide 1/8" gauge, 12" x 12" Imperial Series VCT flooring by AHF/Armstrong Excelon Tile in asbestos-free composition with colors and patterns selected by the Owner. All necessary materials including Armstrong S-515 or Henry 430 adhesive, Armstrong S-185 primer for underlayment, resilient edge strips, and manufacturer-recommended accessories must be supplied. Contractors must submit product data, material lists, technical documentation, and samples within 15 days of contract award. The project involves sealed bid submission through PennBid with a bid deadline of Thursday, October 22, 2026 at 11:00 AM, and a satisfactory Bid Bond equal to 10% of the bid amount is required with submission.

Installation must comply with manufacturer recommendations and occur only after all other finishing operations and painting are completed and the permanent heating system is operational. Specific execution requirements include substrate preparation to achieve smooth, level surfaces without variations exceeding 1/8" in 10 feet, proper moisture verification, and tile installation with patterns running in alternate directions staggered by course. The contractor shall ensure all material in each apartment originates from the same lot number, maintain tight joints with maximum 1/8" width sealant at perimeter, and install continuous aluminum thresholds and L-shaped angles at appropriate transitions. Prior to returning possession of apartments to the Owner, the contractor must strip all floors, damp mop, and apply three coats of floor wax using manufacturer-recommended materials. The successful bidder will be required to furnish Performance and Payment Bonds, and the Bethlehem Housing Authority reserves the right to reject any or all bids.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
01010 General Work Requirements.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
02210 Selective Demolition.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
06650 Solid Polymer Fabrication.pdf PDF
15400 Plumbing.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
08200 Flush Wood Doors and Frames.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01710 Cleaning.pdf PDF
01620 Storage and Protection.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VINYL COMPOSITION TILE FLOORING

SECTION 09670

SUMMARY:

Provide vinyl composition tile flooring where shown on the drawings, as specified herein, and as needed for a complete and proper installation. Include all necessary manufacturer recommended accessories and adhesives.

Documents affecting work of this section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, Drawings, and these specifications.

SUBMITTALS:

Comply with the pertinent provisions of the General Requirements.

Submit product data within 15 days of award of contract to the contractor.

Submit product data and material list of items to be provided under this section. Supply sufficient technical data to demonstrate compliance with the specified requirements.

Provide manufacturer’s recommended installation procedures which, when approved by the Owner, will be incorporated into these Specifications and contract documents.

Provide samples of each item proposed for use under this section. Provide samples for color, pattern and specified grade.

QUALITY ASSURANCE:

Use adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for the proper performance of work covered under this section.

DELIVERY, STORAGE, AND HANDLING:

Comply with pertinent provision of the General Requirements.

09670-1

MATERIALS:

Provide colors and patterns as selected by the Owner from standard colors and patterns of the approved manufacturer and as further specified in this section of the specifications.

Adhesives: Provide Armstrong S-515 or Henry 430 adhesive.

ASPHALT EMULSIONS AND OTHER NON-WATERPROOF ADHESIVES WILL

NOT BE ACCEPTED.

Underlayment Primer: Apply Armstrong S-185 primer on all luan underlayment.

Vinyl Composition Tile: Flooring shall be (1/8”) gauge, 12” x 12”, “Imperial

Series” by AHF/Armstrong Excelon Tile. Tile shall be asbestos free composition; Colors to be selected by Owner.

Resilient Edge Strips: Not less than 1” width, 1/8” gauge, tapered bull-nose edge, color to match flooring edge or as selected by the Owner.

OTHER MATERIALS:

Provide all other materials, not specifically described but required for a complete and proper installation, subject to Owner approval.

EXECUTION:

Examine all areas and conditions under which work of this section will be performed.

Promptly correct all conditions detrimental to timely and proper completion of the work.

Do not proceed until all unsatisfactory conditions are corrected.

Install new floor sub-floor and underlayment as shown on the contract drawings.

Stagger joints of differing layers of plywood in both directions.

Prepare and verify that substrate is smooth, level, at required finish elevation, and without 1/8” in 10’- 0” variation for entire substrate area.

09670-2

Patch and level all joints and nails or staples using leveling material recommended by the manufacturer of flooring material approved for use, subject to Owner approval.

Patch and seal all gaps in plywood floor including the perimeter of pipe and any other material protruding through plywood flooring material.

Prior to laying material, broom clean and vacuum the surface to be covered, and inspect sub-floor.

Apply concrete primer, for installation upon concrete slabs, in accordance with manufacturer’s recommendations and as approved by the Owner. Prepare concrete floor per manufacturer’s instructions prior to installing VCT.

INSTALLATION:

Install material only after all other finishing operations, (including painting), have been completed and after permanent heating system is fully operational.

Verify that the moisture content of all concrete slab areas, building air temperature, and relative humidity are within the limit recommended by the manufacturer of material being used.

Maintain reference markers, holes, and openings that are in place or plainly marked for future cutting by repeating on the finish surface as marked in the sub-floor. Use chalk or other non-permanent marking devices. Ensure all cuts in material are accurate and neat in appearance with smooth, distinct edges.

Place units with adhesive cement in strict compliance with the manufacturer’s recommendation and as approved by the owner.

Butt units tightly to vertical surfaces, nosing, edging, and thresholds.

Scribe as necessary around obstructions and at perimeter to produce tight, neat joints.

Place tiles tightly laid, even, and with joints in straight parallel lines.

Extend units into tow spaces, door revels, and closets and similar spaces.

Lay units from center marks established with principal walls, discounting minor offsets, so that units at opposite edges of the room are of equal width.

09670-3

Adjust as necessary to avoid use of cut widths less than 3” wide at the room perimeter.

Lay units square to axis of the room or space and parallel to one another forming tight, straight, true joints the entire width and length of the area being covered.

Match units for color and pattern by using material from cartons in the same sequence as manufactured and packaged. Ensure all material used in any single apartment originated from the same material lot number.

Floor tile shall be installed with the pattern in all units running in alternate directions staggered from course to course.

Place resilient edge strips tightly butted to units and secured with adhesive, providing at all unprotected edges unless otherwise shown.

Caulk perimeter of floor where tile meets wood baseboard. Maximum width of sealant joint shall be 1/8”. Provide type and color of sealant as directed by Owner.

Provide 1” wide, continuous aluminum threshold strip at all locations Sheet Vinyl meets VCT. Provide aluminum, “L” shaped angle where V.C.T. terminates at top of stairways.

All flooring material shall be installed to the full with of each room prior to installation of vinyl or wood base material.

CLEANING AND PROTECTING:

Protect all newly installed flooring material by whatever means necessary. Repair or replace material damaged during or following installation and prior to final acceptance, as directed by the Owner.

Remove all excess adhesive and other blemishes from exposed surfaces, using neutral cleaner recommended by the manufacturer of the resilient material.

The contractor shall strip all floors, damp mop and apply three coats of floor wax prior to returning possession of the apartment back over to the Owner. Use stripping and waxing material as recommended by the manufacturer of the approved flooring material being used. See section 01710, Cleaning.

END OF SECTION