15400 Plumbing.pdf

PDF 137 KB Posted

Attached to
Renovate 20 Apartments in Parkridge - Phase 2
Solicitation number
US.245854
Issued by
Northampton County, Pennsylvania

About this file

This is a plumbing specification document (Section 15400) for the Bethlehem Housing Authority's apartment renovation project at Parkridge family development in Pennsylvania. The specification outlines comprehensive plumbing system work including removal and replacement of hot and cold water distribution systems, vents, waste lines, sewer lines, fixtures, trim, and gas line alterations. The project involves renovating 20 apartments in Phase 2, with sealed bids due electronically through the PennBid site by Thursday, October 22, 2026 at 11:00 AM. All plumbing installation and materials must comply with the latest edition of the BOCA Plumbing Code and all applicable local, state, and federal regulations. Contractors must submit a bid bond in the amount of 10% of the bid value, secured by a Department of Treasury Circular #570 approved surety company, and the successful bidder will be required to furnish performance and payment bonds.

The specification mandates specific material standards including Schedule 40 ABS/PVC DWV piping for soil, waste, and vents; copper Type L piping for domestic water distribution with soldered fittings (excluding PEX, Pro-press, shark bites, and compression fittings); and standard weight steel piping for gas lines. All plumbing work must be inspected and approved in writing by a certified BOCA Plumbing Inspector and the City of Bethlehem Plumbing Inspector prior to covering pipes, with all inspection costs the responsibility of the general contractor. Testing requirements include air testing soil and waste lines at 5 psi for one hour and water lines at 150 psi for four hours. The Bethlehem Housing Authority reserves the right to reject any or all bids or waive any informalities. Additional contract documents and specifications are available on the PennBid website, with questions directed to Scott Speshok at 610-483-0322.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
09670 Vinyl Composition Tile.pdf PDF
01010 General Work Requirements.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
02210 Selective Demolition.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
06650 Solid Polymer Fabrication.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
08200 Flush Wood Doors and Frames.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01710 Cleaning.pdf PDF
01620 Storage and Protection.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 15400

PLUMBING

SUMMARY:

Work included under this Section includes removal and proper replacement of the plumbing system for hot and cold water distribution, vents, waste lines and main sewer lines, plumbing fixtures and trim, all other associated existing plumbing items; and gas line alterations indicated on the drawings or described in theses specifications, plus all other plumbing items required for a complete and proper installation.

QUALITY ASSURANCE:

Use sufficient journeyman plumbers and competent supervisor in execution of this portion of the Work to ensure proper and adequate installation throughout. In the acceptance or rejection of the installed plumbing, no allowance will be made for lack of skill on part of the workmen.

All plumbing installation and materials shall be in strict compliance with the Latest Edition of BOCA Plumbing Code and all Local, State and Federal agencies having jurisdiction.

SUBMITTALS:

Comply with the pertinent provisions of the General Requirements.

Submit product data with 15 days of award of the contract to the contractor.

Upon completion of this portion of work, and as a condition of its acceptance, compile and submit manuals of operation and maintenance procedures for all products being used.

Submit product data and material list of items to be provided under this section. Supply sufficient technical data to demonstrate compliance with the specified requirements.

PRODUCT HANDLING:

Protection: Use all means necessary to protect the materials of this Section before, during, and after installation and protect the work and materials of all other trades.

15400-1

Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Owner and at no additional cost to the Owner.

PIPE:

Soil, Waste, and Vents in Building: Except for fixture connections, all pipe and fittings shall be schedule 40 ABS/PVC, DWV piping, ASTM-D2661-73/D2265-72.

Exterior underground lines shall be SDR-35.

Domestic Water Distribution Piping: all hot and cold water piping, unless otherwise shown on the Drawings, shall be copper type and fittings capable of operating at 100 psi at a temperature of 180 degrees F.: with soldered watertight fittings, of wrought copper hard-drawn tubing shall be used throughout. No PEX, Pro-press, shark bites, crimp or compression fittings, etc. shall be accepted.

Underground water supply piping shall have a minimum working pressure of 160 psi at

73.4 degrees F.

All copper piping shall be Type “L”. ASTM-B-76.

Gas Piping: Shall be standard weight steel with malleable iron fittings in accordance with Gas Company Specification of the Gas Company having jurisdiction. Provide capped drip pockets at all low points.

PIPE SLEEVES AND ESCUTCHEONS:

Provide chrome-plated escutcheons on all water and waste line penetrations in walls, floors, ceilings, and cabinets, sized to suit pipe diameter. Seal voids around pip using specified sealant prior to installing escutcheons.

FIXTURES AND EQUIPMENT:

Provide fixtures and equipment equal or exceeding the quality of the manufacturer and model numbers shown on the Drawings, or specified herein. Provide fixtures and equipment complete with all required stops, supplies backing, drain, trim and all other items or accessories required for a complete and proper installation. Fixture and equipment colors shall be as selected by the Owner.

15400-2

PIPE INSULATION:

Use ½” walled closed cell foam type pipe insulation as required. Install to all new above grade and crawl space hot and cold water copper lines.

CLEANOUTS:

Zurn #2-1400-2 or Owner approved equal.

UNIONS:

Install adjacent to all equipment, special valves or wherever their presence will facilitate the removal of equipment or fixtures.

VALVES:

Provide an assembly located ball valve in each hot and cold water branch connection, and at all other points as specified or required for proper installation, operation or maintenance. Include ball valves at each plumbing fixture.

Working pressure and manufacturer’s name shall be cast on each valve body.

Except as noted all valves shall be Crane, Jenkins, Fairbanks, Kennedy, Nibco-Scott, Lunkenheimer, or Stockham.

Valves in copper tubing lines shall be bronze, screwed bonnet, ball valves.

DIELECTRIC COUPLINGS:

Furnish and install insulating couplings at all interconnections between piping systems of dissimilar materials, and all connections of piping systems to equipment where piping and equipment are of dissimilar metals. Couplings shall be specifically designed for the purpose of electrically isolating pipe lines from other piping systems and/or equipment.

Couplings shall be manufactured by Epco Sales, Inc. or Owner approved equal.

EXECUTION:

Surface Conditions: Examine all areas and conditions under which work of this Section will be performed. Promptly correct all conditions detrimental to timely and proper completion of the work. Do no proceed until all unsatisfactory conditions are corrected.

15400-3

Inspection: All plumbing work installed underground within the contract limits on site and inside all buildings, shall be inspected and approved in writing (at final completion and prior to covering pipe), by a certified “BOCA” Plumbing Inspector and the City of Bethlehem Plumbing Inspector.

Contractor must provide proof of certification of inspector being used for inspection at the pre-construction conference.

All costs for the services by the inspector shall be the responsibility of the General Contractor.

Plumbing System Layout: Lay out the plumbing system in careful coordination with the Drawings and Specifications, determining the proper elevations for all components of system and using only a minimum number of bends to produce a satisfactorily functioning system. Follow the general layout shown on the Drawings in all cases except where other work may interfere or, otherwise directed by the Owner or governmental agencies having jurisdiction. Lay all pipe to call within partition, walls, or roof cavities, and to not require furring other than shown on the Drawings.

Consult with Owner in field for exact location of fixtures and lines.

Installation: Do not cut into or reduce the size of any load-carrying member without the prior approval of the Owner. Install all pipes to clear all beams and obstructions and in accordance with the following:

1.) Install all piping promptly, capping or plugging open ends.

2.) Provide traps and cleanouts on all waste lines, at each plumbing fixture, at each washer drain line and each floor drain.

3.) Install all piping generally level and plumb, free from traps, and in a manner to conserve space for other work.

4.) Cushion all traps and bearings to minimize transfer of sound.

5.) Provide complete isolation of all dissimilar metals, and firmly anchor all pipes into position.

15400-4

6.) Provide uniform pitch of at least ¼” per foot for all horizontal waste and soil piping within the building.

7.) Pitch all vents for proper drainage. Install vent piping with each bend 45 degrees minimum from the horizontal wherever structural conditions permit.

8.) Provide air chambers at all fixtures; 16” minimum length and same diameter as the branch.

9.) Conceal all piping unless otherwise shown on the Drawings.

10.) Inspect each piece of pipe, couplings, fittings, and equipment for defects and obstructions. Promptly remove all defective materials from the site.

11.) Where holes for piping are bored in wood framing members, the edge of the hole shall be a minimum of 1 ¼” from the nearest edge of the framing member. Where this is not possible, steel “nail plates” shall be installed to protect the piping from penetration by nails or screws. Steel nail plates shall be a minimum of 1/16” thick and of adequate length and width to totally cover and protect the pipe.

12.) Where a recess is provided in concrete slab for connection of an underground trap, such as at tub/shower units, recessed area shall have sides and bottom of corrosion resistant, insect and vermin proof.

JOINTS AND CONNECTIONS:

Properly cut and ream all pipes. Cut all threads straight and true. Apply best quality

Teflon tape to male pipe threads but not to inside of fittings. Use graphite on all cleanout plugs.

Make all joints in copper tubing with 95-5 tin antimony solder, applied in strict accordance with the manufacturer’s recommendations.

15400-5

SUPPORTING:

Use a separate hanger for each branch. Support vertical risers at the floor with extension pipe clamps approved by the Owner. Wherever insulated pipe is supported by ring hangers, the rings shall pass freely around the insulation. Protect the insulation at point of contact with saddles approved by the Owner.

SPACING:

Do not exceed the following spacing, on centers:

TYPE OF PIPE SPACING

1.) PVC Four Feet (4’)

2.) Copper Six Feel (6’)

CLOSING IN UNFINISHED WORK:

Do not cover up or enclose work until it has been properly and completely inspected and approved. Should any work be covered up or enclosed prior to all required inspections and approvals, uncover work as required and, after it has been completely inspected and approved, make all repairs and replacements with such materials and workmanship as necessary to the approval of the Owner and at no additional cost to the Owner.

TESTING:

Furnish all test pumps, gauges, equipment and personnel required to test as necessary to demonstrate the integrity of the finished installation to the approval of the Owner and all other pertinent authorities have jurisdiction.

Soil and Waste: Plug all openings and air test at gauge pressure of 5 psi.

Retain pressure for one (1) hour; repair all faulty joints and retest.

Water Lines: Air test and make tight at 150 psi water gauge. Retain pressure for four (4) hours; repair all leaking joints as directed; and retest.

Valves: Test all valve bonnets for tightness. Test operate all valves at least once from closed-to-open to closed-positions while valve is under pressure. Test all automatic valves for proper operation at the settings indicated. Test pressure relief valves at least three (3) times.

15400-6

Other Tests: Test all piping specialties for proper operation. Test all air vent points to ensure that air has been vented.

END OF SECTION