01710 Cleaning.pdf

PDF 113 KB Posted

Attached to
Renovate 20 Apartments in Parkridge - Phase 2
Solicitation number
US.245854
Issued by
Northampton County, Pennsylvania

About this file

This is a Technical Specifications document for Section 01710 Cleaning, prepared by the Bethlehem Housing Authority in Pennsylvania for the renovation of 20 apartments at the Parkridge family development. The specification outlines comprehensive cleaning requirements to be maintained throughout the construction period and upon project completion. The contractor must conduct daily inspections to verify cleanliness standards, provide all necessary personnel, equipment, and materials compatible with surfaces being cleaned, and remove scrap, debris, and waste material from the job site daily. Interior spaces must be swept clean daily, and newly installed finish floor materials must be cleaned and protected throughout construction. Final cleaning operations must be completed only upon completion of all building work, with the Owner's final inspection and approval required before occupancy. Sealed bids are due electronically on the PennBid site by Thursday, October 22, 2026 at 11:00 AM, with a 10% Bid Bond required from each bidder.

Final cleaning requirements are rigorous and include exterior inspection and removal of all soil, waste material, splatter, and foreign materials, with power washing of paved surfaces as required; interior final cleaning must include inspection and removal of all dust, debris, and foreign matter from all surfaces, complete cleaning of windows inside and outside, and application of a minimum of four thin coats of commercial polish/wax (ZEP High Traffic Floor Polish at 20% solid formula or approved equivalent) with proper drying time between coats. If the Owner determines that cleaning operations are unsatisfactory, the contractor must re-clean affected areas at no additional expense. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds. Contract documents, specifications, and drawings are available on the PennBid website, and questions should be directed to Scott Speshok at 610-483-0322.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
09670 Vinyl Composition Tile.pdf PDF
01010 General Work Requirements.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
02210 Selective Demolition.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
06650 Solid Polymer Fabrication.pdf PDF
15400 Plumbing.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
08200 Flush Wood Doors and Frames.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01620 Storage and Protection.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01710

CLEANING

SUMMARY:

Throughout the construction period, maintain the buildings and site in a standard of cleanliness as described in this Section.

Documents affecting work of this section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, Contract Drawings, and these complete Technical Specifications.

QUALITY ASSURANCE:

Conduct daily inspections, and more often if necessary or directed by the Owner, to verify that the requirements for cleanliness are being met.

In addition to the standards described in this Section, comply with the pertinent requirements of all governmental agencies having jurisdiction.

CLEANING MATERIALS AND EQUIPMENT:

Provide required personnel, equipment and materials needed to maintain the specified standard of cleanliness.

COMPATIBILITY:

Use only the cleaning materials and equipment which are compatible with the surface being cleaned; and as recommended by the manufacturer of the individual item being cleaned.

EXECUTION:

Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection for all materials.

Do not allow scrap, debris, waste material, and/or other items to accumulate on the job site.

Completely remove all scrap, debris, and waste material, from the job site on a daily basis.

01710-1

Provide adequate storage for all materials temporarily awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.

Inspect all arrangements of material stored on site on a daily basis. Re-stack, tidy or otherwise service arrangements to meet the requirements of this Section.

Maintain the site in a neat and orderly condition at all times.

Sweep interior spaces clean on a daily basis, and more often if needed or directed by the Owner.

As required, preparatory to installation of succeeding materials, clean structures or pertinent portions thereof, to the degree of cleanliness recommended by the manufacturer of the succeeding material being installed. Use equipment and materials required to achieve the necessary cleanliness. Do not bury dirt, dust, or other debris in walls or behind newly installed equipment or material.

Following the installation of new finish floor material, clean finished floor daily, or more often if necessary or directed by Owner. Protect all new finished floor coverings following installation and at all times work is being performed in the work space new materials were installed to.

Properly protect all newly installed material from damage during the progression of work and until the building is returned to the possession of the Bethlehem Housing Authority.

FINAL CLEANING:

Broom clean all paved areas on site and public paved areas adjacent to the site and remove all swept debris from the site. Following broom cleaning, where required, power wash all paved surfaces clean. Clean grass areas free of debris, construction material or waste material. Perform final cleaning operations as follows:

EXTERIOR:

1.) Visually inspect exterior surfaces and remove all traces of soil, waste material, smudges, concrete or mortar splatter, and all other foreign materials.

2.) Remove all traces of splashed material from adjacent surfaces.

3.) In the event of stubborn stains not removable with water, the Owner may require light sandblasting, or other necessary cleaning methods, at no additional cost to the Owner.

01710-2

INTERIOR:

1.) Visually inspect interior surfaces and remove all traces of soil, waste materials, smudges, pencil marks, dust, dirt, paint droppings, and all other foreign material.

2.) Completely clean and wipe all walls, ceilings, shelves, cabinets, drawers, countertops, doors, and all other surfaces and newly installed equipment or material free from dust or other foreign matter. Use only the cleaning material and equipment as so recommended by the manufacturer of the material being cleaned.

3.) Clean all window glass and frames on the inside and outside of the building.

4.) Apply a minimum of four (4) thin coats of polish/wax. Use a commercial polish/wax compatible with the flooring material being polished. Polish/wax shall be applied with the proper equipment at a rate specified by the wax manufacturer.

Polish/wax shall be sufficiently dry (minimum 30 minutes) prior to applying additional coat(s). Finish shall be smooth and even when looking at 30 degree angle from floor. Polish/wax shall be ZEP High Traffic Floor Polish (20% solid formula), or approved

5.) Schedule final cleaning as approved by the Owner, and only at completion of all work to the building to enable the Owner to accept a clean and newly renovated structure.

The Owner will inspect final cleaning for final approval. If in the Owner’s opinion, cleaning operations were less than satisfactory, the contractor shall be directed to re-clean all or part of any apartment at no additional expense to the Owner.

END OF SECTION