06200 Finish Carpentry.pdf
PDF 118 KB Posted
- Attached to
- Renovate 20 Apartments in Parkridge - Phase 2
- Solicitation number
- US.245854
- Issued by
- Northampton County, Pennsylvania
About this file
This is a Technical Specifications document for Finish Carpentry (Section 06200) associated with the Bethlehem Housing Authority's project to renovate 20 apartments at the Parkridge family development in Pennsylvania. The specifications detail the materials, quality standards, and installation requirements for finish carpentry work, including wood baseboard (pine, 9/16" x 4"), door trim and window trim (Number 1 clear pine clamshell trim, 2-1/2" wide), window shades (Number 1 clear pine, 1" x 4"), and window head and jamb extenders. All materials must be primed and painted. The work must be executed by skilled and experienced carpenters in accordance with contract drawings and specifications, with joints required to be true, tight, and well-nailed. Sealed bids are due electronically on PennBid by Thursday, October 22, 2026 at 11:00 AM, with contract documents available on the PennBid website. Questions may be directed to Scott Speshok at 610-483-0322, and additional information is available at www.Bethlehemhousing.org.
A satisfactory Bid Bond in the amount of 10% of the bid, secured by a Surety Company listed in the Department of Treasury Circular #570, must accompany each bid submission. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds. The specifications emphasize quality workmanship, proper finishing with sanding to produce uniform smooth surfaces, and daily cleanup requirements, including removal of debris from the job site. All exterior trim must utilize galvanized nails and waterproof glue or sealant. The Bethlehem Housing Authority reserves the right to reject any or all bids or to waive any informalities or irregularities in the bids.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 06200
FINISH CARPENTRY
SUMMARY:
Provide wood, nails, screws, and other items as needed, and perform finish carpentry work for the construction shown on the contract drawings, as specified herein, and as required for a complete and proper installation.
Documents affecting work of this section include, but are not limited to, General Conditions, Supplementary Conditions, Drawings, and these Technical Specifications.
QUALITY ASSURANCE:
Use an adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for proper performance of the work of this Section.
DELIVERY, STORAGE AND HANDLING:
Comply with the pertinent provisions of the General Requirements.
GRADE STAMPS:
Identify lumber by grade stamp of the applicable lumber inspection bureau, or such grade stamp as approved in advance by the Owner.
Identify plywood as to species, grade, number of plies, and glue type by stamp of the “American Plywood Association”.
06200-1
MATERIALS:
Provide materials in the quantities needed for the for the work as shown on the contract drawings, and meeting or exceeding the following standard of quality:
1.) Wood Baseboard: pine, 9/16” x 4 ¼” (actual) with rounded top edge, primed and painted.
2.) Door Trim & Number 1 clear pine clamshell trim, 2-1/2” wide (actual), Window Trim primed and painted.
3.) Window Shade Number 1 clear pine, 1” x 4”, primed and painted.
4.) Window Head Number 1 clear pine 1” thick by necessary width, & Jamb Extenders primed and painted.
OTHER MATERIALS:
Provide other materials, not specifically described, but required for complete and proper installation, as selected by the contractor and subject to approval by the Owner.
EXECUTION:
Examine the areas and conditions under which work of this Section will be performed.
Correct conditions detrimental to timely and proper condition of the work. Do not proceed until unsatisfactory conditions are corrected.
Produce joints which are true, tight and well nailed with all members assembled in accordance with the contract drawings and specifications. Scribe materials to properly fit new or existing conditions. Provide a ¼” reveal for all window and door trim or casing.
Create joints to conceal shrinkage, miter exterior joints, cope interior joints, and miter or scarf end to end joints.
Install trim in as long continuous lengths as possible, jointing only where absolutely necessary and where solid support and backing is obtained.
Install all items straight, true, level, plumb, and firmly anchored into place.
06200-2
Where blocking or backing is required, coordinate as necessary with other trades to ensure placement of required backing and blocking in a timely manner.
Nail trim work secure with finishing nails of proper dimension to hold member firmly in place without splitting the wood. Set finish nails using “nail set tool” and fill holes with non-shrink wood filler. Sand wood filler smooth and flush following proper curing period.
Nail all exterior trim using galvanized nails, making joints waterproof. In addition to nailing, attach material being nailed using waterproof glue or sealant.
Screw, do not drive, wood screws; except when using screws which are designed to be started by driving and then screwed “home”.
INSTALLATION OF OTHER ITEMS:
Install items in strict accordance with the drawings and the recommended methods of the manufacturer, and as approved by the Owner.
FINISHING:
Sandpaper exposed finished surfaces thoroughly as required to produce a uniform smooth surface, always sanding in the same direction the grain is running in. Do no sand wood which is designed to remain rough or rustic in appearance.
At no time will any course sandpaper marks, hammer marks, or other imperfections in finish wood be accepted.
Paint all newly installed finish items as designated in the Painting Section of these Specifications.
CLEAN-UP:
Keep the premises in a neat, safe and orderly condition at all times during the execution of work of this Section. Keep area free from accumulation of saw-dust, cut-ends and other debris.
At the end of each work day, and more often if necessary or directed by the Owner, thoroughly sweep surfaces where refuse from this portion of work has settled.
06200-3
Remove the cleaned-up debris from the job site on a daily basis.
At completion of this portion of work, thoroughly broom clean and wipe down all surfaces. Following clean-up, properly protect all in-place finish work from damage until possession of the building is signed back over to the Owner.
END OF SECTION
06200-3