This is a General Work Requirements specification document prepared by the Bethlehem Housing Authority for the renovation of 20 apartment units at the Parkridge Housing Development in West Bethlehem, Pennsylvania. The project encompasses complete demolition and remodeling of apartment interiors with limited exterior renovations as depicted in the accompanying drawings and specifications. Work shall be performed Monday through Friday between 8:00 AM and 4:30 PM, with the contractor required to comply with all applicable federal, state, and local codes including OSHA, NEC, and 2002 BOCA Standards. The Housing Authority will release a maximum of two apartments at any one time to the contractor, with an initial 90-day vacancy period for the first two units following contract execution. A phased sequence will follow whereby completed apartments are returned to occupancy, residents are relocated from temporary host apartments, and subsequent apartment pairs are released for renovation. The contractor must allow 15 business days for moves and cleaning between phases. Sealed bids are due electronically on PennBid by October 22, 2026 at 11:00 AM, with a 10% Bid Bond required at submission.

The contractor is responsible for all material and labor costs, including applicable sales tax, permit acquisition and associated fees, and all tests and inspections required by local and state authorities, though the Housing Authority will reimburse permit costs and reasonable administrative time. The contractor bears responsibility for site security, snow and ice removal, property maintenance, debris removal and legal disposal, landscaping repairs, and all damage occurring during possession of the units. The contractor must field-verify all dimensions and existing conditions prior to bidding, perform all cutting and patching to match adjacent undisturbed areas, and maintain weather-tight conditions throughout construction. Construction keying systems may be implemented at the contractor's expense, with four copies of each temporary key to be provided to the Housing Authority. The successful bidder will be required to furnish Performance and Payment Bonds.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
09670 Vinyl Composition Tile.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
02210 Selective Demolition.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
06650 Solid Polymer Fabrication.pdf PDF
15400 Plumbing.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
08200 Flush Wood Doors and Frames.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01710 Cleaning.pdf PDF
01620 Storage and Protection.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01010

GENERAL WORK REQUIREMENTS

These specifications shall explain and define the contractor’s responsibility for the renovation of 20 apartment units in the Bethlehem Housing Authority’s Parkridge Housing Development. Parkridge is located in West Bethlehem, PA.

SCOPE OF WORK:

The scope of work includes, but may not be limited to the following:

- Complete demolition and remodeling of the interior of the dwelling units and, limited exterior renovations, as shown on the drawings and as specified in this manual.

GENERAL:

Work shall take place Monday through Friday between 8:00AM and 4:30 PM.

The contractor shall comply with all laws, ordinances or regulations of all authorities having jurisdiction, either borough, city, county, state or public utility.

Nothing contained in these specifications or shown on the drawings shall be construed to be in conflict with any state or local codes, ordinances or regulations governing the installation of the class of work specified herein.

All laws, ordinances, codes and regulations, including those of the Department of Environmental resources, Department of Public Welfare, Department of Labor and Industry, the National Fire Protection Association, ASME, OSHA, NEC, 2002 BOCA Standards (or latest edition), and all public bodies bearing conduct on this work are hereby incorporated into these specifications.

All work shall be performed by skilled mechanics in each individual trade involved with this contract.

The Contractor is responsible to pay all applicable sales tax on material and equipment.

GENERAL

01010-1

The drawings and specifications are intended to provide a complete and perfectly operating system. Therefore, it is specifically agreed upon and understood by the contractor that anything, be it labor, material or equipment, which is not described in the specifications or specifically shown on the drawings, but is necessary for the operation and completion of a perfectly operating system, according to the true intent of the drawings and specifications and as interpreted by the Owner, shall be furnished by the contractor as part of the contract, at no extra charge, as though it were specifically detailed and described.

This contract includes, all associated architectural, civil, structural, electrical, plumbing and mechanical drawings listed in the “Table of Contents”, these technical specifications, general conditions, supplementary conditions, all other related provisions and contract documents in this booklet and all local, federal and state codes, rules and regulations, of all governmental agencies having jurisdiction, are hereby incorporated into these contract documents. The contractor shall be responsible to field verify all dimensions and existing conditions prior to submitting the bid.

The contractor shall repair any damage which occurs to the existing landscaping during the performance of this contract.

The contractor shall be responsible for all material and labor necessary to complete all work included in the contract documents.

The contractor shall be responsible to obtain and pay for all permits. The authority shall reimburse the contractor for the cost of the permit and reasonable administrative time to prepare the permit applications. The Authority will not pay for any pass through costs a subcontractor charges a general contractor for obtaining a permit.

The contractor shall pay all deposits and fees necessary for the installation, tests and inspections of all work provided under these specifications. These tests shall be conducted as required by the Owner and regulations of the local and/or state authorities having jurisdiction.

The contractor shall be responsible for all cutting, patching, and finishing of existing construction for the proper installation of equipment and materials to be installed during the performance of this contract.

All patching shall be performed utilizing materials of the same quality and texture of the adjacent undisturbed areas. All finishing shall match the undisturbed adjacent areas perfectly and to the approval of the Owner.

01010-2

No cutting shall be done which may affect the building structurally or architecturally without first securing approval from the Owner.

Cutting shall be accomplished in such a manner as not to cause damage to the building or leave unsightly surfaces. Where such unsightly conditions occur, the contractor shall repair the damaged areas at his expense and to the Owner’s approval.

The contractor shall confine operations at the site to the specific areas designated on the contract drawings. Portions of the site beyond the areas of which work is indicated to be performed at shall not be disturbed.

Keep the driveways and entrances to BHA property clear and available at all times. Do not use for parking or storage of material.

Do not encumber the site with material, equipment or construction debris. Confine stockpiling of material to the areas previously authorized by the Owner.

Lock automotive type vehicles and other motorized construction equipment when parked and unattended. Do not leave vehicles or equipment unattended with motor running, or with key left in ignition.

Maintain the buildings in a safe and weather tight condition throughout the construction period. Repair any damage caused by construction operations to the approval of the Owner. Take all precautions necessary to properly protect, the buildings, building occupants, neighboring occupants, and the general public from damage or harm during the construction period.

Do not interrupt utility services serving occupied or in-use buildings, except as authorized by the Owner.

The contractor shall properly cover and secure all floor openings to provide pedestrian safety.

Provide protective devices, such as barricades, construction fencing, shoring, planking, guards, warning signs and lights, and similar devices necessary or required for the protection of life, limb, and property. CAUTION TAPE WILL NOT BE ACCEPTED AS

A METHOD TO SECURE CONSTRUCTION AREAS OR OPEN EXCAVATED AREAS.

USE ONLY SECURELY PLACED CONSTRUCTION FENCING AS APPROVED BY

THE OWNER.

01010-3

Where protection devices occur in exterior walls, they shall be waterproof and insulated against heat loss in cold weather.

Maintain protection devices in good condition and working order during the progression of work.

The contractor shall be responsible for removing excess material and construction debris resulting from renovation work from the job site. The contractor shall properly and legally dispose of all debris and excess building material off of BHA property on a daily basis.

Burning of trash, excess material, debris or any other material will not be permitted on the site.

PROGRESSION OF WORK:

The BHA shall release a maximum of 2 apartments, at any one time, to the possession of the contractor.

Once the contract is executed the owner has 90 days to vacate the first 2 apartments.

The Contractor shall receive 2 vacant apartments at the start of the contract to work in.

Once the apartments are completed and ready to be occupied, residents shall be moved from host apartments to the renovated apartments. Once the host apartments are vacated, 2 more residents will be moved to the host apartments and the contractor can then start renovating the 2 vacated apartments. This sequence shall be followed until all apartments are renovated. The contractor shall allow 15 business days for moves and cleaning of the host apartments to be completed. The owner shall be responsible for all moves and cleaning of the host apartments. The contractor shall be responsible for cleaning of the renovated apartments.

Each apartment released to the contractor shall become the complete responsibility of the contractor until the time the apartment is turned back to the owner for occupancy.

Any property damage which may occur during the time the apartment is in the possession of the contractor as a result of the renovation work, such as fire, vandalism, theft, or by any other means shall be the responsibility of the contractor.

The contractor shall be responsible for apartment security, all snow and ice removal from the property, and all required maintenance and upkeep of the structures during all times buildings are in their possession.

01010-4

CONSTRUCTION KEYING:

Once vacated the contractor shall be given a key for each of the existing apartment door locks. Certain BHA personnel also have a master key that will operate the existing locks.

It is the contractor’s option to utilize a “construction keying” system for the apartments while under the contractors possession. The contractor shall supply all material and labor required for the keying system if a construction keying system is utilized. Provide and deliver to the BHA four copies of each temporary key, properly labeled with its corresponding address.

Remove construction keying system, and provide keying system as specified on the drawings and specifications, when renovation work is complete and just prior to turning building back over to the possession of the BHA.

END OF SECTION

01010-5