About this file

Summary

This is a Selective Demolition specification document (Section 02210) for the Bethlehem Housing Authority's project to renovate 20 apartments at the Parkridge family development in Bethlehem, Pennsylvania. The specification outlines comprehensive demolition requirements for areas scheduled for removal as identified in the project drawings. Contractors are required to visit the site during the bidding process to verify the extent and locations of demolition work. Sealed bids are due electronically through the PennBid site on Thursday, October 22, 2026 at 11:00 AM, with all bids to be electronically opened at that time. Questions regarding the project should be directed to Scott Speshok at 610-483-0322, and additional information is available at www.Bethlehemhousing.org.

The specification requires contractors to employ skilled workers, confine demolition to designated areas, and maintain structural integrity of the building throughout the process. All cutting must be approved by the owner and performed with appropriate tools to avoid damage. Contractors must provide dust and debris protection, properly shut off and cap utilities per City of Bethlehem requirements, and patch all affected surfaces professionally. Demolished materials become contractor property and must be disposed of off BHA property promptly, though the owner retains first refusal rights on existing fixtures, trim, and equipment, which must be transported to the BHA warehouse at 1411 Pembroke Road if claimed. A satisfactory Bid Bond equal to 10% of the bid amount, secured by a Department of Treasury Circular #570-listed surety, must accompany each bid submission, with the successful bidder required to furnish Performance and Payment Bonds.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
09670 Vinyl Composition Tile.pdf PDF
01010 General Work Requirements.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
06650 Solid Polymer Fabrication.pdf PDF
15400 Plumbing.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
08200 Flush Wood Doors and Frames.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01710 Cleaning.pdf PDF
01620 Storage and Protection.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02210

SELECTIVE DEMOLITION

SUMMARY:

Provide all material, labor and equipment necessary to perform the complete and proper demolition of existing areas scheduled for demolition as noted on the drawings and specifications.

Documents affecting work of this section include, but are not limited to, General Conditions, Supplementary Conditions, Drawings, and these Technical Specifications.

DEMOLITION:

The contractor shall use an adequate number of workmen skilled in each individual trade.

Demolition work shall be confined to the areas as depicted on the drawings. Extreme care is to be taken during demolition to avoid damage to existing structures or equipment at adjacent areas. In the event of damage, promptly make replacements or repairs to the owner’s approval at no additional cost to the owner.

Examine all areas and conditions under which demolition work will be performed.

Correct all conditions detrimental to the timely and proper completion of the work. Do not proceed until all unsatisfactory conditions are corrected.

All contractors shall visit the site to verify the extent and locations of demolition work as a part of the bidding process.

Prepare and follow an organized plan for demolition and removal of material, equipment, miscellaneous items and debris.

Shut off, cap and otherwise protect existing utilities in accordance with the requirements of the City of Bethlehem and the utility company having jurisdiction.

Completely remove items scheduled to be demolished and removed, leaving surfaces clean, solid, and ready to receive new material. Patch all areas, be it walls, floors or ceilings in a professional manner and matching the existing plane to the owner’s approval.

All demolition work shall be performed keeping dust and debris from becoming a nuisance or hazardous to the building’s occupants. The contractor shall provide protection, barricades or tarpaulins as necessary to the owner’s satisfaction.

02210-1

Demolition work is to be complete leaving the existing apartment and/or building in a structurally sound condition.

No cutting shall be done which may affect the building structurally or architecturally without first securing approval from the Owner.

Cutting shall be accomplished in such a manner as not to cause damage to the building or leave unsightly surfaces. Where such unsightly conditions occur, the contractor shall repair the damaged areas at his expense and to the Owner’s approval. Items/areas to be demolished shall be cut out with an appropriate tool as opposed to being removed by banging with a hammer.

The contractor shall confine operations at the site to the specific areas designated on the contract drawings. Portions of the site beyond the areas of which work is indicated to be performed at shall not be disturbed.

The contractor shall properly brace and support all bearing structures during demolition, until the new support walls are erected and in place.

Demolished materials shall be considered the property of the contractor and be disposed of off BHA property promptly and properly. However, the owner has the right of first refusal to all existing fixtures, trim and equipment slated for demolition. If the owner requests any demolished material the contractor shall remove the item from the construction area and transport the material to the BHA warehouse, located at 1411 Pembroke Road, in Bethlehem.

END OF SECTION

02210-2