02900 Landscaping.pdf
PDF 128 KB Posted
- Attached to
- Renovate 20 Apartments in Parkridge - Phase 2
- Solicitation number
- US.245854
- Issued by
- Northampton County, Pennsylvania
About this file
This is a Technical Specifications document, Section 02900 Landscaping, for the Bethlehem Housing Authority's project to renovate 20 apartments at the Parkridge family development in Pennsylvania. The specifications detail comprehensive landscaping requirements for all areas disturbed during renovation work, including vehicular and foot traffic zones, lay-down areas, and staging areas. Key work requirements include supplying and placing clean fill material in 12-inch uncompacted layers with machine rolling; providing and installing a minimum of 6 inches of pure clean topsoil; raking and tilling to a depth of 3 inches to remove roots and coarse materials larger than 1.5 inches; and applying fertilizers including a 0:20:0 super phosphate fertilizer mixed throughout the topsoil and a 5:10:5 starter-type fertilizer applied at seeding. Seeding shall occur between September 1 to October 15 or April 1 to May 31, at a rate of 80 pounds per acre, using a specified seed mixture of Kentucky Bluegrass (40%), Perennial Ryegrass (20%), Red Top (10%), Chewing Fescue (15%), and Creeping Red Fescue (15%). Sealed bids are due electronically on PennBid by Thursday, October 22, 2026 at 11:00 AM, with a satisfactory Bid Bond of 10% of the bid amount required from each bidder.
The contractor shall provide all labor, materials, equipment, and services necessary for landscape work at no additional expense to the owner beyond the contract price. The contractor must mow newly seeded grass areas to a height of 2 inches when growth exceeds 3 inches during construction and perform two additional mowings during the construction period as directed by the Bethlehem Housing Authority, or after final acceptance if not required during construction. The contractor is responsible for producing satisfactory, even turf acceptable to the owner at project completion and must refertilize and reseed damaged areas at the contractor's expense. A one-year warranty is required following final acceptance of landscape work, during which the contractor shall correct all bare spots and eroded areas to the satisfaction of the Housing Authority, with all other maintenance performed by the owner. All bills of purchase and seed mixture certificates must be submitted for approval prior to sowing. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02900
LANDSCAPING
SUMMARY:
This Section of these specifications will describe the contractor’s responsibility for landscape work required under this contract.
Documents affecting work of this section include, but are not limited to, General Conditions, Supplementary Conditions, Drawings, and these Technical Specifications.
QUALITY ASSURANCE:
Use an adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for proper performance of the work of this section.
LOCATION:
All existing areas disturbed due directly to renovation work, vehicular or foot traffic, used for lay-down areas or staging areas, and all other grass areas which may be damaged or disturbed during this contract period.
Fill: The Contractor shall supply sufficient clean fill to achieve finished grade. Finished grade shall be the elevation of the top of the new slab, as shown on the drawings, or as directed by the Owner. Fill shall consist of good, clean excavated soil, free of organic matter.
Placement: Soil shall be moist fill material and shall be placed in uniform successive horizontal layers not exceeding 12” in uncompacted thickness. Each layer shall be machine rolled prior to laying the next layer. Ensure optimum moisture levels for compaction of new fill.
Final Grading: Consists of supplying and grading all topsoil used following backfill operations. The Contractor shall provide and install a minimum of 6” of pure clean topsoil on top of fill to all locations designated to be landscaped or restored.
Raking and Tilling: After the areas to be seeded have been approved for material quality, elevation and slope, the top surface shall be thoroughly loosened to a depth of at least three inches (3”) by disking and harrowing. All topsoil shall then be raked and cross-raked and receive equivalent machine operations to remove all roots, coarse materials and stone, etc., larger than 1-1/2” in any dimension, in the top 3” thickness of the topsoil. All such removed materials shall become the sole property of the Contractor, removed from the premises and disposed in a prompt and proper manner.
02900-1
Fertilizing: After all grass areas have been fined to remove coarse materials, the topsoil shall receive fertilizer, uniformly mixed throughout the entire thickness of the topsoil. Fertilizer shall be a super phosphate fertilizer in a chemical ratio of 0:20:0.
After the above-specified fertilizer has been mixed throughout the topsoil, a starter-type fertilizer shall be applied to the top surface or the topsoil at the same time as the seed.
The starter-type fertilizer shall be composed of nitrogen, phosphoric acid and potash in a chemical formula ratio of 5:10:5.
Surface Preparation: After all topsoil has been surface limed and fertilized, the topsoil shall be smoothed with a drag or smoothing harrow to prepare the surface to receive seeding. Topsoil shall be hand raked to prepare the surface in an equivalent manner.
Seeding: Seeding shall all be completed between September 1st to October 15th or between April 1st to May 31st. The actual seeding, however, shall be done only during periods within these periods which are suitable, as judged from the standpoint of weather conditions which are approved by the BHA. Hydronic seeding will be acceptable.
Grass seed shall be of fine quality with proportions and germination as hereinafter specified.
Seeding for all grass areas, except as hereinafter specified, shall be of the following proportions and germination, and shall be applied at the rate of 80 pounds per acre:
Germination Percentage Purity
Kentucky Bluegrass 40% 99% 85%
Perennial Ryegrass 20% 99% 97%
Red Top 10% 92% 85%
Chewing Fescue 15% 98% 90%
Creeping Fed Fescue 15% 98% 90%
All bills of purchase and a certificate substantiating the above seed mixture shall be submitted for approval, prior to sowing. Seed shall be uniformly batch mixed by machine operations, and be sown at the indicated rate.
02900-2
All seeding performed by manually operated push-type spreaders or by the broadcasting method, either by hand or approved sowing equipment, shall be applied seeding one-half of the rate each way to insure a uniform distribution. All seed applied shall be lightly raked into the topsoil to a coverage not exceeding one-fourth inch (1/4”).
At the Contractor’s option, raked seeded areas may be rolled and cross-rolled.
All grass areas may be seeded with precision-metered seeders, power drawn seeders or approved type power drawn hydraulic seeders. All seeders shall be specifically designed and approved for grass seeding purposes, and be of the type to deposit and cover seeds at the indicated rate simultaneously. Starter type fertilizer as heretofore specified, may also be applied during the seeding operations. All seeding applied with metered or hydraulic seeders will not require raking or rolling operations.
Mulching: All straw mulching shall be either clean wheat or oat straw, (SALT, HAY OR OTHER SALINE MARSH GRASSES ARE NOT ACCEPTABLE), applied in a thickness not to restrict soil aeration or prevent proper growth and be kept in place by either continuous watering procedures or be anchored by the use of twine or tape lines. Straw mulching on slopes greater than 10% shall be placed at the rate of one (1) ton per acre.
Burlap cloth mulching shall be applied in a continuous blanket and be held in place with stakes, wire staples or nails placed into the ground.
All straw mulching shall be removed from the premises when directed, except on banks or grades exceeding a 10% slope where mulching shall remain. All burlap mulching shall be removed from the grass area, remain the property of the Contractor and be completely removed from the premises as directed by the Owner.
Maintenance: The Contractor shall be responsible for producing a satisfactory even turf acceptable to the Owners at the time of completion and final acceptance of the project. All procedures deemed necessary by the Contractor, in order to provide the satisfactory turf will be performed by the Contractor at his expense. All newly seeded grass areas will be mowed by the Contractor to a clipping height of not less than two inches (2”) when the growth exceeds three inches (3”) in height during the construction period as hereinafter specified. Damaged grass areas not progressing well, shall be refertilized and reseeded as originally specified, without any additional expense to the Owner.
Mowing: The Contractor shall include within his proposal, all costs, labor, material, equipment and services, necessary to mow all newly planted grass areas a total of two times during the construction period when directed by BHA, in addition to the hereinafter specified mowing performed immediately before the final acceptance of the project. In the event the two mowings are not required during the construction period, the Contractor shall mow all new grass areas after final acceptance of the project, when directed by the Owner.
02900-3
All grass areas shall be mowed to a height of 2”, and be reasonably free of weeds, objectionable coarse native grasses and foreign matter, and provide a satisfactory even turf, placed in first-class condition immediately before the final acceptance of the site work. Scattered bare spots, smaller than one square foot will be allowed up to one percent (1%) of the lawn area at the time of final acceptance of the project.
Warranty: The Contractor shall provide a one-year warranty following final acceptance of landscape work, as hereinafter specified.
The Contractor is hereby alerted to the fact that the correction of bare spots and eroded areas will be reviewed just prior to the termination of the one year warranty period following the acceptance of the project, and he will be held responsible to correct these items to the complete satisfaction of BHA.
All fungicidal spraying, fertilizing, watering, cutting, weeding and general maintenance, etc., excluding bare spots and erosion during the one-year warranty period, which is required to maintain the accepted turf in first-class condition, will be performed by the Owner.
Damaged and eroded areas will be repaired by the placement of new topsoil by this Contractor, and the application of seed and fertilizer same as originally specified for this area.
END OF SECTION
02900-5
File details come from the government source that posted it. Updated .