This is a specification section for storage and protection procedures applicable to the Bethlehem Housing Authority's apartment renovation project in Parkridge, Pennsylvania. The document establishes mandatory requirements for contractors to protect all products, materials, and finished surfaces throughout the renovation of 20 apartments under Phase 2 of the project. Sealed bids were due on Thursday, October 22, 2026, at 11:00 AM, submitted electronically through the PennBid website. Contractors must comply with manufacturer recommendations for product handling, storage, and protection; deliver all materials in original manufacturer packaging with intact labels; and maintain finished surfaces, including floors in traffic areas, in a cleaned and unmarred condition until final acceptance by the owner. A bid bond in the amount of 10 percent of the bid value, secured by a surety company listed in Department of Treasury Circular #570, is required with each bid submission.

The successful bidder must furnish satisfactory Performance and Payment Bonds as determined by the Bethlehem Housing Authority. Any damage to products, materials, or finished surfaces must be promptly repaired or replaced at no additional cost to the owner, and delays in securing replacements or making repairs will not be grounds for contract time extensions. The owner retains the right to reject non-complying materials and products that do not meet specified requirements regarding manufacturer, grade, quality, and identification. Contract documents, specifications, and drawings are available on the PennBid website, with questions directed to Scott Speshok at 610-483-0322. The Bethlehem Housing Authority reserves the right to reject any or all bids or waive any informalities or irregularities in the bidding process.

View the file

Other files

File Type Posted
02900 Landscaping.pdf PDF
16200 Electrical.pdf PDF
2-Parkridge PH 2 wage rates.pdf PDF
09670 Vinyl Composition Tile.pdf PDF
01010 General Work Requirements.pdf PDF
7-Parkridge PH 2 Addendum.pdf PDF
9-Bid table for Parkridge Phase 2.pdf PDF
06100 Rough Carpentry.pdf PDF
02210 Selective Demolition.pdf PDF
5-Parkridge PH2 IFB.pdf PDF
1-Parkridge documents to be submitted.pdf PDF
06650 Solid Polymer Fabrication.pdf PDF
15400 Plumbing.pdf PDF
05500 Metal Fabrications.pdf PDF
06240 Plastic Laminate.pdf PDF
08110 Storm Doors.pdf PDF
08200 Flush Wood Doors and Frames.pdf PDF
07920 Sealants and Caulking.pdf PDF
01700 Project Close-out.pdf PDF
10300 Vinyl Coated Shelves.pdf PDF
3-Parkridge Ren. PH 2 Admin. Specs.pdf PDF
01545 Contractor Use of Premesis.pdf PDF
01500 Construction Facilities.pdf PDF
08100 Metal Doors and Frames.pdf PDF
6-Parkridge PH 2 Ren. Drawings.pdf PDF
09260 Gypsum Wallboard.pdf PDF
09650 Resilient Sheet Flooring.pdf PDF
8-Parkridge PH 2 Addendum 2.pdf PDF
09900 Painting.pdf PDF
0 Table of Contents.pdf PDF
01710 Cleaning.pdf PDF
12390 Kitchen Cabinetry.pdf PDF
06200 Finish Carpentry.pdf PDF
16000 Basic Electrical Requirements.pdf PDF
08541 Vinyl Windows.pdf PDF
10260 Fiberglass Wall Panels.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01620

STORAGE AND PROTECTION

SUMMARY:

Protect products scheduled for use in the work by means including, but not limited to those described in this section.

Additional procedures also may be detailed in other sections of these specifications.

Include with the contractor’s quality assurance program such procedures as are required to assure full protection of work and materials.

MANUFACTURER’S RECOMMENDATIONS:

Except as otherwise approved by the owner, determine and comply with manufacturer’s recommendations on product handling, storage and protection.

PACKAGING:

Deliver products to the job site in their manufacturer’s original container, with labels intact and legible.

Maintain packaged material with seals unbroken and labels intact until the time of use.

Promptly remove damaged material and unsuitable items from the job site, and promptly replace with materials meeting the specified requirements, at no additional cost to the owner.

The owner may reject as non-complying such material and products that do not bear the identification satisfactory with the owner as to the manufacturer, grade, quality, and all other pertinent characteristics.

PROTECTION:

Protect all finished surfaces, including jambs and soffits used as passageways, through which equipment and materials are handled.

01620-1

Provide protection for finished floor surfaces in traffic areas prior to allowing equipment or materials to be moved over such surfaces.

Maintain finished surfaces cleaned, unmarred, and suitably protected until final acceptance by the owner.

Provide protection for in-place equipment and materials as may be specified in other sections of these specifications.

REPAIRS AND REPLACEMENTS:

In the event of damage, promptly make replacements and/or repairs to the approval of the owner and at no additional cost to the owner.

Additional time to secure replacements and/or make repairs will not be considered by the owner as reasons to justify an extension in the Contract Time of Completion.

END OF SECTION