Summary: Borough of Jefferson Hills Demolition Project
This is an Invitation for Bids (IFB) document prepared by the South Hills Area Council of Governments (SHACOG) on behalf of the Borough of Jefferson Hills in Allegheny County, Pennsylvania for demolition services. The project, designated CD 50-3.11.2, encompasses the demolition of two buildings in the base bid (1412 Worthington Avenue and 1420 High Road) and one additional building as an alternate bid item (317 Coal Valley Road). The scope of work for each location includes containment and offsite disposal of asbestos-containing materials, removal of all structures and contents with proper offsite disposal, utility disconnection coordination, sanitary sewer lateral capping, clean fill import, site grading and restoration, traffic control, and resident notification. Bidding documents became available May 14, 2026, through the PennBid electronic platform. Bids must be submitted electronically through PennBid by 10:00 A.M. on June 2, 2026, with electronic opening occurring at 10:01 A.M. the same day. The contract requires substantial completion within 30 calendar days and final completion within 45 calendar days from the commencement date, with liquidated damages assessed at $500 per calendar day for delays beyond the deadline. No pre-bid conference is specified in the available documents.
The base bid is structured as lump sum pricing for two separate demolition line items plus asbestos abatement at 1420 High Road, with an additional alternate bid for the third property. All bids must be accompanied by a bid bond equal to 10 percent of the maximum bid price (base bid plus all alternates). The successful bidder must provide performance and payment bonds each equal to 100 percent of the contract price, along with a two-year maintenance bond of 50 percent of the final contract value. Required insurance coverage includes workers' compensation with statutory limits, commercial general liability of $2,000,000 aggregate, and business auto liability of $1,000,000 combined single limit. The project is funded in part through U.S. Department of Housing and Urban Development (HUD) Community Development Block Grant (CDBG) funds, making it a Section 3 Project requiring contractors to utilize lower-income residents for employment and training opportunities to the greatest extent feasible and to preferentially engage Section 3 business concerns. Compliance is mandatory with the Davis-Bacon Act (though demolitions are excluded from wage requirements), Title VI of the Civil Rights Act, Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act of 1990, Executive Order 11625 on minority business enterprise utilization, and Executive Order 12138 on female business enterprise utilization. All contractors must obtain and maintain a Unique Entity Identification (UEID) number through SAM.gov. Award is contingent upon HUD fund release, and payment processing may require 4 to 8 weeks from processing at the SHACOG office.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTH HILLS AREA COUNCIL OF GOVERNMENTS
ALLEGHENY COUNTY
PENNSYLVANIA
CONTRACT DOCUMENTS
FOR:
Borough of Jefferson Hills Demolition Project
CD 50-3.11.2
South Hills Area Council of Governments
C-50203-2026
Base Bid
This project includes demolition of two (2) buildings within the Borough of Jefferson Hills as follows:
• 1412 Worthington Avenue – 880-G-108
• 1420 High Road – 1003-S-059
The scope of the work includes containment and offsite disposal of all asbestos containing material, removal of all structures and their contents including proper offsite disposal, coordination to disconnect utilities, capping of the sanitary sewer lateral, import of clean fill, site grading, restoration, traffic control and resident notification.
Add Alternate No. 1
Includes demolition of one (1) building within the Borough of Jefferson Hills as follows:
• 317 Coal Valley Road – 560-M-074
The scope of the work includes containment and offsite disposal of all asbestos containing material, removal of all structures and their contents including proper offsite disposal, coordination to disconnect utilities, capping of the sanitary sewer lateral, import of clean fill, site grading, restoration, traffic control and resident notification.
Bid Opening Date:
June 2, 2026
Bid Opening Time:
10:00 AM
2600 Old Greentree Road, Second Floor Phone: (412) 429-1130
Carnegie, PA, 15106 Facsimile: (412) 429-3830
Project Directory Copyright © 2022 The Gateway Engineers, Inc. All rights reserved.
00002-1
Project Directory
OWNER: Borough of Jefferson Hills
925 Old Clairton Road
Jefferson Hills, PA 15025
Phone: 412-655-7735
Fax: 412-655-3143
ENGINEER: The Gateway Engineers, Inc.
100 McMorris Road
Pittsburgh, PA 15205
Phone: 412-921-4030
Fax: 412-921-9960
ADMINISTRATOR: South Hills Area Council of Governments
2600 Old Greentree Road, Second Floor
Carnegie, PA 15106
Phone: 412-429-1130
Fax: 412-429-3830
Table of Contents
00010-1
TABLE OF CONTENTS
DIVISION 0 – BIDDING DOCUMENTS AND CONTRACT
00001 – Project Title Page (cover)
00002 – Project Directory
00010 – Table of Contents
SHACOG Instructions to Bidders
Invitation for Bids – Advertisement
00110 – Bid Form and Proposal
00130 – Bid Bond
00180 – Non-Collusion Affidavit
00190 – Public Works Employment Verification Form
00200 – Instructions to Bidders
00490 – Bidding Addenda
00510 – Notice of Award
00520 – Agreement
00550 – Notice to Proceed
00605 – Certificate of Insurance
00610 – Performance Bond
00615 – Payment Bond
00620 – Application for Payment
00700 – General Conditions
00800 – Supplementary Conditions
00830 – Davis Bacon Wage Rates
00940 – Work Change Directive
00941 – Change Order
00942 – Field Order
DIVISION 1 – GENERAL REQUIREMENTS
01100 – Summary
01110 – General Specifications
01210 – Allowances
01250 – Contract Modification Procedures
01270 – Unit Prices
01290 – Payment Procedures
01310 – Project Management and Coordination
01320 – Construction Progress Documentation
01322 – Photographic Documentation
01330 – Submittal Procedures
01400 – Quality Requirements
01500 – Temporary Facilities and Controls
01524 – Construction Waste Management
01700 – Execution Requirements
01770 – Closeout Procedures
Table of Contents
00010-2
DIVISION 2 – SITE CONSTRUCTION
02051 – Abandonment of Storm Sewers
02220 – Traffic Control Requirements
02221 – Selective Demolition
02222 – Structure Demolition
02230 – Site Clearing and Preparation
02320 – Asbestos Abatement
02850 – Incidental Restoration Requirements
02920 – Site Restoration
ATTACHMENTS
Allegheny Global Environmental, Inc. Asbestos Survey Reports
CDBG Procurement Compliance Package Paperwork
SOUTH HILLS AREA COUNCIL OF GOVERNMENTS
INSTRUCTIONS TO BIDDERS
1. All proposals must be submitted electronically through pennbid.net
2. The communities for which bids are being requested have different specifications and instructions for construction of projects identified, bidders must submit proposals in accordance with the specifications of these communities, including using their forms for the submission of proposals as well as completing any required SHACOG forms.
3. If the specifications provide for the submission of alternate bids, the bid must clearly indicate whether an alternate bid is included. Each alternate bid must be clearly and separately set forth.
4. Proposals must be accompanied by a bid bond in the amount of ten (10%) percent of the bid, made payable to SHACOG.
5. The bids will remain firm for a period of ninety (90) days.
6. The successful bidder must furnish a Surety Company Performance Bond in the amount of one hundred (100%) percent of the contract price. The successful bidder must also furnish a Surety Company Labor and Materials Bond in the amount of one hundred (100%) percent of the contract price. Upon completion of the project a TWO (2) year maintenance bond must be provided, dated as of the day of acceptance by the appropriate municipal engineer, in the amount and terms specified in the bid material for that project. In the event no provision for maintenance bond is set forth, the amount shall be fifty (50%) of the contract price for the stipulated two (2) year period.
7. The successful bidder shall furnish certificates of insurance evidencing the following coverage as follows:
• Automobile Liability Insurance $1,000,000 Aggregate Bodily Injury and Property Damage
• Comprehensive General Liability Insurance $1,000,000
Aggregate Bodily injury and Property Damage
• Workers Compensation Insurance $500,000
The above listed coverages are minimums. If higher limits are stipulated in the detailed specifications, those higher limits shall prevail and shall be met by the successful bidder.
8. If the bidder is a Corporation, the proposal must be signed by the President or Vice President and attested to by the Secretary. Alternate signatures must be accompanied by a corporate resolution certifying and authorizing those individuals to submit and sign the proposal. If the bidder is a Sole Proprietor or Partnership, the proposal must be signed by the sole proprietor or a partner. Alternate signatures must be accompanied by a Power of Attorney certifying and authorizing those individuals to submit and sign the proposal.
9. No bid may be withdrawn after the bid opening. (In submitting this bid the bidder specifically waives the provisions of 73 P.S. Section 1601 et seq. Pertaining to Public Contracts and withdrawal of Bids.) All bids will then remain firm for a period of ninety (90) days.
10. Compliance is required with the Davis-Bacon Act (Demolitions are excluded from the Davis-Bacon Act wage requirements) and other Federal and local labor and minority standards. The bidder is cautioned to examine all pertinent bid materials and submit all required bid documents. FAILURE TO SUBMIT ALL REQUIRED FORMS MAY
INVALIDATE THE BID.
11. This project is being funded, in part, through the U.S. Department of Housing and
Urban Development (HUD). The successful bidder must be prepared to comply with all Federal statutes regarding the use of Federal Funds. This includes the submission of weekly payroll forms and other reports as required by HUD, the Department of Labor and the Allegheny County Department of Economic Development.
12. Award of the bid is contingent upon the release of funds by HUD.
13. SHACOG and/or the host municipality reserves the right to waive any informality or to reject any or all proposals.
14. Unique Entity Identification and CAGE Numbers: In accordance with HUD regulations, organizations receiving Federal funding are required to register via the System for Award Management (SAM) to obtain a Unique Entity Identification Number & CAGE Number. In order to get a CAGE number, you must first obtain a UEID number. To obtain this unique identification number go to the following website:
SAM.gov or call 1-866-606-8220 for further information. The UEID number must be renewed on a yearly basis. Proof of registration is mandatory, to be considered for funding.
SPECIAL NOTICE TO BIDDERS
Although SHACOG is the official signatory to the contract with the successful bidder (contractor), SHACOG is acting as agent for the municipality in soliciting this proposal, awarding the contract and monitoring contract performance. All work must be performed to the satisfaction of the subject municipality. Any construction problems or disputes must be resolved by the contractor and the municipality. All requests for payment must be processed through the municipality. No payments will be made unless first approved by the municipality. Although all payments will be made through the SHACOG office, SHACOG will be directly responsible only for that share of the project being paid from Community Development Block Grant Funds. Any and all portions of the project payable by the municipality cannot and will not be paid until those funds are received from the municipality. Payment from Allegheny County Economic Development Funds may take between 4 to 8 weeks from the time it is processed from the SHACOG office. When submitting payment requests, the contractor should, therefore, anticipate the approval time required by the municipality and the processing time required by the County.
SOUTH HILLS AREA COUNCIL OF
GOVERNMENTS
Compliance Paperwork and Instructions for Contractors
1. All signatures must be signed in BLUE INK.
2. Complete all forms as necessary.
3. Submit completed forms electronically with bid.
Invitation for Bids South Hills Area Council of Governments HEREBY GIVES NOTICE that specifications and proposal forms for furnishing all labor and materials and professional consulting and/or construction services for the following project entitled:
CD 50-3.11.2: Jefferson Hills Building Demolitions Project may be obtained through pennbid.net (“PennBid”) available May 14, 2026.
A complete set of bidding documents and bid specifications are available at no cost and may ONLY be received and accepted via the online electronic bid service of PennBid.
Questions regarding these projects shall be submitted via the “Clarifications from Vendors” feature within PennBid. Bids will be received until 10:00 A.M. June 2nd, 2026, by the SHACOG through PennBid. Bids will be electronically opened at 10:01 A.M. on Tuesday, June 2nd, 2026. Bids must be accompanied by a bid bond of not less than 10%.
“Compliance is required with the Davis-Bacon Act and other Federal Labor Standard Provisions; Title VI and other applicable provisions of the Civil Rights Act of 1964; the Department of Labor Equal Opportunity Clause (41 CFR 60 – 1.4); Section 109 of the Housing and Community Development Act of 1974; Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with Section 504 of the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990.
Further, notice is hereby given that this is a Section 3 Project under the Housing and Urban Development Act of 1968, (as amended) and must to the greatest extent feasible, utilize lower income residents for employment and training opportunities and Section 3 Business concerns and all contracts and subcontracts for this project shall contain the “Section 3 Clause” as set forth in 24 CFR, Part 135.38. Moreover, compliance is required by the prime contractor and all subcontractors with the Federal General Conditions included in the contract documents between the County of Allegheny through its Department of Economic Development and the operating agency. These Federal General Conditions are to be incorporated by reference into all construction contracts between operating agency and contractor, contractor and subcontractor(s), and subcontractor(s) and lower tiered subcontractor(s).”
The South Hills Area Council of Governments and/or Jefferson Hills Borough reserves the right to reject any and all bids, alternates or parts of bids and to waive any informality in the proposals received.
Patrick Conners, SHACOG Executive Director
00110 BID FORM & PROPOSAL
00110 – 1
C-50203-2026 Proposal From
BID FORM AND PROPOSAL
ARTICLE 1 – BID RECIPIENT
This Bid is submitted to: South Hills Area Council of Governments
2600 Old Greentree Road, Second Floor
Carnegie, PA 15106
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with
Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – PROPOSAL FOR:
CD 50-3.11.2 BOROUGH OF JEFFERSON HILLS DEMOLITION PROJECT
Base Bid
This project includes demolition of two (2) buildings within the Borough of Jefferson Hills as follows:
• 1412 Worthington Avenue – 880-G-108
• 1420 High Road – 1003-S-059
The scope of the work includes containment and offsite disposal of all asbestos containing material, removal of all structures and their contents including proper offsite disposal, coordination to disconnect utilities, capping of the sanitary sewer lateral, import of clean fill, site grading, restoration, traffic control and resident notification.
Add Alternate No. 1
Includes demolition of one (1) building within the Borough of Jefferson Hills as follows:
• 317 Coal Valley Road – 560-M-074
The scope of the work includes containment and offsite disposal of all asbestos containing material, removal of all structures and their contents including proper offsite disposal, coordination to disconnect utilities, capping of the sanitary sewer lateral, import of clean fill, site grading, restoration, traffic control and resident notification.
ARTICLE 3 – TIME OF COMPLETION
Bidder agrees that the Work will be substantially complete within thirty (30) calendar days after the date when the Contract Times commence to run as provided in Article 4 of the General Conditions, and will be completed and ready for final payment in accordance with Article 15 of the General Conditions within forty-five (45) calendar days after the date when the Contract Times commence to run or liquidated damages liquidated damages in the amount of five hundred dollars ($500.00) per calendar day will be charged. As actual damages for any delay in completion are impossible to compute and ascertain with certainty as a basis of recovery by the Borough of Jefferson Hills of actual damages, the Contractor and its Surety shall be liable for, and shall pay to the Borough of Jefferson Hills the sum of five hundred dollars ($500.00) as fixed and agreed for each business day of delay until the work is complete and accepted. Such liquidated damages are intended to represent actual damages and are not intended as a penalty. Contractor shall pay to Owner without limiting Owner’s right to terminate this Agreement for default as provided elsewhere herein.
Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times.
00110 – 2
ARTICLE 4 – BASIS OF BID
Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
BIDDING SCHEDULE
BASE BID
Item
No.
Item Description Unit Quantity Unit Price Amount
Demolition and disposal of all structures at 1412 Worthington Avenue, lot and block number 880-G-108, utility and sewer capping, site access, site fill, grading and restoration, site protection, construction documentation, traffic control, and resident notification, complete in place
L.S. 1 $_____________
Demolition and disposal of all structures at 1420 High Road, lot and block number
1003-S-059, utility and sewer capping, site access, site fill, grading and restoration, site protection, construction documentation, traffic control, and resident notification, complete in place
L.S. 1 $_____________
Asbestos Abatement at 1420 High Road, complete in place L.S. 1 $_____________
BASE BID TOTAL $____________________________
BIDDING SCHEDULE
ADD ALTERNATE BID NO. 1
Item
No.
Item Description Unit Quantity Unit Price Amount
Demolition and disposal of all structures at 317 Coal Valley Road, lot and block number 560-M-074 utility and sewer capping, site access, site fill, grading and restoration, site protection, construction documentation, traffic control, and resident notification, complete in place
L.S. 1 $_____________
Asbestos Abatement at 317 Coal Valley
Road, complete in place L.S. 1 $_____________
ADD ALTERNATE BID NO. 1 TOTAL $____________________________
00110 – 3
The Owner shall award the Contract to the lowest pre-qualified, responsible, and responsive Bidder whose Bid meets the requirements and criteria set forth in these Specifications unless all bids are rejected, or the lowest qualified, responsible, and responsive Bidder is allowed to withdraw their Bid upon compliance with the Public Contract Bid Withdrawal Law. The Owner retains the right to award each
Contract after consideration of the following: quality of previous work performed in the Borough; the
Contractor’s record of completing projects on time; the Contractor’s history of payments to subcontractors and suppliers; the maintenance of a permanent place of business; the adequacy of equipment and plant to perform the work; the technical experience of the Contractor’s staff; a proven solid financial base to guarantee contract completion; and any and all other factors deemed relative by the
Owner.
The Borough reserves the right to determine the lowest total Bid price based on the Base Bid and Add
Alternate at its sole discretion.
Bidders acknowledge that each Bid Unit Price shown on the Bid Form and Proposal includes an amount considered by the Bidder to be adequate to cover the overhead and profit for each separately identified item. Bidder acknowledges that estimated quantities are not guaranteed, and are solely for comparison of
Bids, and final payment for all Bid Items will be based on actual installed quantities, determined as provided in the Contract Documents.
In addition, Bidders acknowledge that the Owner reserves the right to increase or decrease listed Bid
Form and Proposal quantities (including elimination of quantities in their entirety) without consideration for recovery of any or all direct or indirect costs associated with the adjusted or eliminated quantity subject to all applicable Sections of this Document.
All specified cash allowances are included in the price(s) set forth above and have been computed in accordance with Article 13 of the General Conditions.
Unit Prices have been computed in accordance with Article 13 of the General Conditions.
A price adjustment for any material will not be permitted. Contractors shall include all costs necessary to complete the project in accordance with the Contract Documents by the listed date of final completion in their total bid price. A time adjustment due to material availability may be considered by the Owner upon submittal of acceptable documentation by the Contractor. Contractors shall note the material submittals shall be made no later than fifteen (15) days after Notice of Award (NOA). Material shall be ordered no later than ten (10) days after submittal approval.
Payments for “stored materials” including deposits or conditional payments required by Suppliers will not be considered for payment. All work must be “complete in place” for payment consideration.
Contractors shall include all costs necessary to complete the project in accordance with the Contract
Documents by the listed date of final completion following the requirements of this Paragraph.
In addition, the Owner reserves the right to increase or decrease estimated quantities with applicable changes to the corresponding final contract price. No additional compensation, including claims for lost overhead and profit, will be considered in the event of decreased quantities regardless of the change in scope, including compete elimination of Bid items.
The Owner retains the right to reject any or all Bids, including without limitation, non-conforming, non-responsive, unbalanced, or conditional Bids. All Bidders shall note applicable language regarding unbalanced Bids elsewhere in these Specifications.
00110 – 4
ARTICLE 5 – BIDDER’S ACKNOWLEDGEMENTS
Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for sixty
(60) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of the Owner.
In the event the low bidder is more than fifteen percent (15%) lower than the second low bidder, the bonding company for the low bidder shall supply a signed and notarized statement that they will provide the proper bonding for the project. This statement shall be supplied prior to award.
ARTICLE 6 – BIDDER’S REPRESENTATIONS
In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Specific Site Conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Federal, State and Local Laws and
Regulations that may affect cost, progress and performance of the Work.
D. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
E. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the
Bidding Documents.
F. Bidder is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents.
G. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the
Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by
Engineer is acceptable to Bidder.
00110 – 5
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work for which this Bid is submitted.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article, and that without exception the
Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
K. Bidder will submit written evidence of its authority to do business in the state where the
Project is located not later than the date of its execution of the Agreement.
L. All notices, demands, requests, instructions, approvals, proposals, and claims must be in writing.
ARTICLE 7 – FURTHER REPRESENTATIONS
Bidder further represents that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 7.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.
00110 – 6
ARTICLE 8 – ATTACHMENTS TO THIS BID
The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of a Certified Check or Surety Company Bond in the amount of 10% in favor of South Hills Council of Governments, as a proposal deposit which, it is understood, will be forfeited in case of failure to comply with the requirements and provisions of this proposal.
B. List of Proposed Subcontractors
C. List of Proposed Suppliers
D. Affidavit of Non-Collusion
E. Public Works Employment Verification Form
F. ACED Grant Procurement Packet
ARTICLE 9 – DEFINED TERMS
The terms used in this Bid with initial capital letters have meanings stated in the Instruction to Bidders, the General Conditions, and the Supplementary Conditions.
00110 – 7
ARTICLE 10 – BID SUBMITTAL
This Bid submitted by: _________________________________________________________________
If Bidder is:
An Individual
Name (typed or printed): _____________________________________________________
By: ______________________________________________________________ (SEAL)
(Individual’s signature)
Doing business as: __________________________________________________________
A Partnership
Partnership Name: __________________________________________________ (SEAL)
By: ______________________________________________________________________
(Signature of general partner)
Name (typed or printed): _____________________________________________________
A Corporation
Corporation Name: __________________________________________________ (SEAL)
State of Incorporation: _________________________________
Type (General Business, Professional, Service, Limited Liability): _____________________
By: _______________________________________________
(Signature )
Name (typed or printed): ______________________________
Title: _____________________________________________ (CORPORATE SEAL)
Attest _____________________________________________
Date of Authorization to do business in _________________________ is ____/____/____.
Bidder’s Business Address _________________________________________________________
Phone No. _________________________ Fax No. _____________________________
Email _________________________
SUBMITTED on ________________________, 20____.
PENAL SUM FORM
Bid Bond EJCDC C-430 (2013 Edition)
000130-1
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
BID
Bid Due Date:
Description (Project Name— Include Location):
BOND
Bond Number:
Date:
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this
Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
Bid Bond EJCDC C-430 (2013 Edition)
000130-2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be
Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by
Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States
Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
Non Collusion Affidavit Copyright © 2013 The Gateway Engineers, Inc. All rights reserved.
000180-1
NON_COLLUSION AFFIDAVIT
Contract/Bid No._______________
State of_________________________________:
:s.s.
County of_______________________________:
I state that I am_____________________________________________________________
(Title) of________________________________________________________________________
(Name of my firm) and that I am authorized to make this affidavit on behalf of my firm, and its owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this bid.
I state that:
(1) The price(s) and amount of this bid have been arrived at independently and without consultation, communication or agreement with any other contractor, bidder or potential bidder.
(2) Neither the price(s) nor the amount of this bid, and neither the approximate price(s) nor approximate amount of this bid, have been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before bid opening.
(3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit a bid higher than this bid, or to submit any intentionally high or noncompetitive bid or other form of complementary bid.
(4) The bid of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive bid.
(5) _______________________________________, its affiliate’s subsidiaries, (Name of my firm) officers, directors and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted or found liable for any act prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as follows:
Non Collusion Affidavit
000180-2
I state that ________________________________understands and acknowledges
(Name of my firm) that the above representations are material important, and will be relied on by
(Name of public entity) in awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from ____________________________________of the true facts relating
(Name of public entity) to the submission of bids for this contract.
(Name)
(Title)
SWORN TO AND SUBSCRIBED
BEFORE ME THIS________DAY
OF____________________20____.
Notary Public My Commission Expires:
(Seal)
Public Works Employment Verification Form Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.
000190-1
COMMONWEALTH OF PENNSYLVANIA
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM
Date _______________________
Business or Organization Name (Employer)_______________________________________ Address ____________________________________________________________________ City _____________________________________ State___________ Zip Code __________
___Contractor ___ Subcontractor (check one)
Contracting Public Body ______________________________________________________ Contract/Project No __________________________________________________________ Project Description ___________________________________________________________ Project Location _____________________________________________________________
As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired post January 1, 2013 are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature
Public Works Employment Verification Form Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.
000190-2
Instructions to Bidders
000200 – 1
INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
B. Successful Bidder – The lowest, qualified, responsible bidder to whom the Owner (on the basis of Owner’s evaluation as hereinafter provided) makes an award.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the
Notice to Bidders may be obtained from the Issuing Office. The deposit is non-refundable.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
2.04 During the bidding period, Bidders may be furnished with Addenda for additions to or alterations of the plans or specifications which shall be included in the work covered by the Proposal and become part of the Contract Documents. Such Addenda shall be signed by the Bidder and submitted with the Bid.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. Evidence of Bidder’s authority to do business in the state where the Project is located.
B. Bidder’s state or other contractor license number, if applicable.
C. Subcontractor and Supplier qualification information; coordinate with provisions of Article
12 of these Instructions, “Subcontractors, Suppliers, and Others.”
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
3.05 If the Owner requires pre-qualification for the Project, the Bidder shall include the pre-qualification documentation for himself/herself/theirselves and his/her/their subcontractors and suppliers in the Bid documents.
000200 – 2
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION
OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and
Engineer by owners of such Underground Facilities, including Owner, or others.
C. No claims for additional compensation will be allowed because of obstructions or conditions on the location of the work which may add to the difficulties or costs of construction, even though such obstructions or conditions are not shown on the Contract Plans. The bidder shall make his own investigation to determine all underground structures and utility lines.
D. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and
Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the
Site, if any, and possible changes in the Contract Documents due to any Hazardous
Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
000200 – 3
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the
Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the
General Conditions indicate, if an Owner safety program exists, it will be noted in the
Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the
Site by Owner or others (such as utilities and other prime contractors) and relates to the
Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given
Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
000200 – 4
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to
Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by
Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the
Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A pre-Bid conference may be held in accordance with the requirements of the Bidding Documents and the Notice to Bidders. Representatives of Owner and Engineer will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of…