This is a specifications document for line painting and reflective glass beads services issued by the SHACOG Purchasing Alliance on behalf of its participating municipalities in Pennsylvania. The procurement solicits bids for traffic line painting services, including the application of paint and reflective glass beads to roadways in compliance with PennDOT standards. Contractors must be prepared to paint lines in four-inch widths at a coverage rate of 300 linear feet per gallon, apply reflective glass beads at six pounds per gallon, remove existing non-compliant lines, and layout new lines on newly resurfaced roads. Additionally, the alliance is accepting bids for Type I reflective glass beads (low index of refraction) manufactured from reclaimed soda lime cullet, packaged in moisture-proof containers, and available in two gradations for highway and pavement marking applications. Bids are due by 10:00 A.M. on April 9, 2026, via the PennBid electronic platform, with each participating municipality responsible for scheduling work and awarding contracts based on quoted prices.

Contractors must submit bids on paint brand selection and reflective bead brand identification as part of their proposals. All traffic paint must meet PennDOT specifications without thinning, and contractors must furnish traffic control devices, maintain compliance with the Manual on Uniform Traffic Control Devices and PennDOT standards, and arrange police protection at their own expense. Contractors shall possess line applicator equipment weighing not less than 19,000 GVW capable of painting parallel lines, single lines, and automatically dispensing beads and measuring line length. Each bid must be accompanied by a $1,000 bid bond payable to SHACOG Purchasing Alliance and Its Participating Municipalities. Upon contract award, contractors must provide proof of minimum insurance coverage including $500,000 automobile liability, $500,000 general liability, and statutory workers' compensation, along with performance and labor and materials bonds equal to 100 percent of contract price if requested. An economic price adjustment is permitted during the contract period; no other price adjustments, surcharges, or fuel surcharges are permitted. Reflective glass bead deliveries must be completed within five working days of order placement to designated municipal locations.

View the file

Other files

File Type Posted
2-CDBG Procurement Packet.pdf PDF
1-2026-10-29 Bid Specifications - CD 51 2025 ADA Ramp Project Mt Lebanon.pdf PDF
1-Brentwood Bid Specs - CDBG Year 50 Curb Ramps.pdf PDF
1-Heidelberg Borough CD 50 ADA Ramp Specifications Complete 2.pdf PDF
1-2026-7-2 Mt Lebanon 2024 ADA Ramp Project -bid specs.pdf PDF
1-IFB CD 50-3.11.2 Borough of Jefferson Hills Demolition Project.pdf PDF
2-CDBG Procurement Paperwork.pdf PDF
11-Hardwood Bark Mulch spec 26.pdf PDF
10-Ballfield Mixture spec 26.pdf PDF
9-Mushroom Compost spec 26.pdf PDF
22-Road Aggregates spec 26.pdf PDF
8-Guide Rails-Components spec 26.pdf PDF
17-Wood Carpet spec 26.pdf PDF
4-Plastic Pipe spec 26.pdf PDF
16-Thermoplastic Pavement Markings spec 26.pdf PDF
14-Wastewater Treatment Chemicals spec 26.pdf PDF
18-Precast Concrete Inlets spec 26.pdf PDF
21-Topsoil spec 26.pdf PDF
1-Bid Instructions Spring 26.pdf PDF
20-Weed Killer spec.26.pdf PDF
23-Swimming Pool Chemicals spec 26.pdf PDF
15-Traffic Signs-Sign Posts spec.26.pdf PDF
6-Fertilizer spec 26.pdf PDF
19-Liquid Asphalt spec 26.pdf PDF
12-Bituminous Surfacing Materials spec 26.pdf PDF
2-Manhole Inserts spec 26.pdf PDF
13-Frames, Rings, Grates spec 26.pdf PDF
3-Portable Toilet Rental Service spec 26.pdf PDF
7-Guide Rails-Installation spec 26.pdf PDF
2-CDBG Procurement Paperwork.pdf PDF
1-CD 50-7.5 Bid Specs.pdf PDF
3-Project Bid Form CD50-7.5.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHACOG Purchasing Alliance - 2026 Specifications for Line Painting and Reflective Glass Beads (1 of 3)

SHACOG PURCHASING ALLIANCE

SPECIFICATIONS FOR LINE PAINTING AND REFLECTIVE GLASS BEADS

1. Contractor shall provide the necessary tools, equipment and labor to paint the number of linear feet of traffic lines and markings set forth in the estimated requirements. Bids shall be accepted by, and work shall be scheduled by, each participating municipality. Each job awarded shall receive the benefit of the prices quoted.

2. For line application, the bid shall be premised on a line width of four (4") inches and a coverage of 300 linear feet of line per gallon of traffic paint.

3. All traffic marking shall comply with PennDOT Official Traffic Control Devices, Title 75, Chapter 212, Subchapter C, as amended. Application of traffic lines and markings shall be in accordance with PennDOT specifications as set forth in PennDOT Publication 408, Section 962 – Painting Traffic Lines and Markings and PennDOT Publication 111M, Traffic Control – Pavement Markings and Signing Standards, as awarded.

4. Traffic paint shall not be thinned.

5. Only paint identified by the manufacturer as meeting PennDOT specifications for color, ingredients and performance shall be used. Contractor shall identify on the proposal form the brand of paint that will be used.

6. The contractor shall furnish the material and traffic control devices necessary for the maintenance and protection of traffic adjacent to and within the construction area. This may include flagging, traffic cones, signs or other traffic control devices. All such work shall be done as specified in the Manual on Uniform Traffic Control Devices (MUTCD), PennDOT Publication 213, current edition, and the approved Traffic Control Plan (TCP). The participating municipality shall be responsible for approving the TCP, which must be submitted by the contractor to the participating municipality at least five (5) working days prior to the commencement of work in the municipality. The participating municipality shall be responsible for enforcing the requirements of the TCP and contractor’s compliance with the MUTCD and PennDOT Publication 213.

7. EQUIPMENT:

Line Application. Contractor shall have a line applicator that is capable of: a) painting two (2) parallel lines of the width indicated (e.g., double yellow centerline), in either solid or broken patterns or various combinations thereof; b) capable of painting a single line (i.e., edge line, lane divider or center line), of the width indicated, in either solid or broken patterns, or various combinations thereof; c) automatically dispensing glass beads onto the painted surface, at the required application rate, by the pressurized glass-gun method; and d) automatically and continuously measuring the length of each line placed, to the nearest foot. A line applicator is typically a vehicle weighing not less than 19,000 GVW with steerable paint carriages in the paint apparatus operator’s compartment that is designed and manufactured for line painting purposes only.

Legend Application. Contractor shall have equipment capable of painting crosswalks, symbols, legends, stop lines and other miscellaneous items. The use of hand brushes or rollers for this type of application is not permitted. Glass beads may be hand-applied.

SHACOG Purchasing Alliance - 2026 Specifications for Reflective Glass Beads (2 of 3)

8. Contractor shall be prepared to work during hours consistent with the hours of the Public Works Department in the participating municipality. Contractor must assume that police protection will not be supplied by the participating municipality. Arrangements for police protection are contingent upon the resources in each participating municipality and must be made by the contractor with each participating municipality.

9. Contractor shall arrange and be responsible for the disposal of any paint cans from paint the Contractor supplies. Contractor shall flush and/or clean its equipment at its own facility unless other arrangements are made with the participating municipality.

10. Contractor shall be prepared to furnish a performance bond and a labor and materials bond in the amount of 100% of the contract price, if requested by the participating municipality. The amount of the bond will be determined by the quantity of work selected by the participating municipality.

11. Upon acceptance of the bid and scheduling of work by a participating municipality, Contractor shall provide to that municipality an insurance certificate or certificates evidencing the following minimum coverages of insurance:

Automobile Liability: $500,000.00 General Liability: $500,000.00 Workers Compensation: Statutory

These coverages of insurance shall remain in effect for the entire period for which the prices are guaranteed.

12. Contractor shall submit a bid for removing (not covering up with black paint) old, improperly located or conflicting lines. Removal shall be in accordance with PennDOT specifications as set forth in PennDOT Publication 408, Section 963 – Pavement Marking Removal. Contractor shall specify the method of removal that will be used.

13. Contractor shall submit bids for both application of paint only and for application of paint with reflective glass beads that may be required to provide nighttime reflectivity. When used, reflective glass beads shall be applied at the rate of six (6) pounds per gallon of paint. Contractor shall identify on the proposal form the brand of beads that will be used.

14. Contractor shall submit a bid for the layout of new lines on newly resurfaced roads, tar and chipped roads, or seal coated roads when the application of new or freshly painted lines is needed. Layout of new lines shall consist of inspecting the section of road to be marked with new lines, making any needed calculations for the proper placement of those new lines, and placing any needed preliminary markings to facilitate the installation of the new lines. Mere painting of new lines on newly surfaced roads, tar and chipped roads, or seal coated roads without having performed this additional work does not constitute the layout of new lines and will not entitle Contractor the additional charge for the layout of new lines. The participating municipality shall be responsible for identifying the section of road on which the layout of new lines is required together with the starting and stopping points of the new line.

15. An Economic Price Adjustment is permitted as provided for in Paragraph 9 of the General Instructions to Bidders. No other price adjustments or surcharges, including fuel surcharges, may be imposed during the contract period.

SHACOG Purchasing Alliance - 2026 Specifications for Reflective Glass Beads (3 of 3)

SHACOG PURCHASING ALLIANCE

SPECIFICATIONS FOR REFLECTIVE GLASS BEADS

1. Bids are being solicited on Type I Reflective Glass Beads (Low Index of Refraction).

2. The Reflective Glass Beads shall comply with the following specifications:

& They shall be manufactured from reclaimed scrap glass (soda lime cullet) & They shall be transparent, clean, dry, free-flowing and free from bubbles and foreign matter & They shall contain not less than 80% by weight true spheres & The Index of Refraction shall be 1.50 to 1.55 & They shall be resistant to surface haze or dulling from acid, calcium chloride, sodium sulfide and water & They shall be packaged in moisture proof containers & They shall be available in two gradations:

• Gradation A – Coarse-low index recycled glass beads for drop-on applications intended for marking highways

• Gradation B – Fine-low index glass beads for premixed paint for marking highways

3. Bidder shall identify on the proposal form the brand of the Reflective Glass Beads on which the bid is being submitted.

4. Bids shall include delivery to the participating municipality. Delivery is to be made to the participating municipality within five (5) working days of the placement of the order by the municipality. The five (5) working day period shall commence on the first working day following the day on which the order is placed. Delivery shall be to the site or location within the participating municipality designated at the time the Reflective Glass Beads are ordered by the municipality.

5. An Economic Price Adjustment is permitted as provided for in Paragraph 9 of the General Instructions to Bidders. No other price adjustments or surcharges, including fuel surcharges, may be imposed during the contract period.