About this opportunity

The Solid Waste Authority of Palm Beach County is soliciting bids under ITB 27-402/DL for the removal and replacement of 33 telemetry cabinets serving an existing SCADA system, with a non-mandatory pre-bid conference on December 3, 2026 at 10:00 a.m. and bids due December 16, 2026 at 2:00 p.m. Work must be performed by a licensed Florida General or Electrical Contractor. No Small Business Enterprise (SBE) or Affirmative Procurement Initiative (API) set-aside applies, though the Authority encourages SBE participation.

The contract is a single-source specification: Section 162914 designates SP Manufacturing LLC as the exclusive control panel supplier, with no substitutes permitted, and Section 160501 specifies LFS-3167 and LFS-3170 telemetry cabinet units from that manufacturer. Contractors must maintain an office within 150 miles of the project and submit three project references covering system engineering, programming, field testing, calibration, startup, and operator training. RTU panel fabricators must document at least five years of industrial SCADA/RTU panel design and construction experience. Scope includes demolition of existing cabinets, installation of new NEMA-rated cabinets with programmable logic controllers, rerouting and terminating field wiring, temporary control systems during cutover, and end-to-end loop verification to the SCADA screen, signed off by the Authority's SCADA integrator. Work sites include pump stations, surface water facilities, flare systems, and landfill, leachate, gas collection, and compost operations, with the contractor required to maintain two-way access for semi-trailer trucks.

The initial term is three years, with a one-year renewal at the Authority's sole discretion. No contract value is stated. Bid security is 5% of the total bid amount, and performance, payment, and maintenance/warranty bonds equal 100% of panel fabrication value. A public construction bond of 100% of contract amount is required for contracts exceeding $200,000, furnished within 21 days of the Notice of Award. Liquidated damages are $500 per day for failure to achieve substantial completion and $250 per day for final completion. Mobilization must begin within 30 days of notification. Award goes to the lowest responsive and responsible bidder on the grand total of Section 1 (mobilization/demobilization) and Section 2 (removal and replacement of RTU control panels). Bids remain valid for 90 business days after opening.

Required bid documents include proof of SBE status if applicable, trench safety compliance, three performance experience forms, authority to execute, and a vendor acknowledgement form. Questions are due December 7, 2026 at 5:00 p.m. through Bonfire's Q&A module. Bids are accepted only through Bonfire, with a public opening via Teams audio conferencing immediately following the December 16 deadline.

Opportunity text

The proposed work will be contracted to a licensed Florida General or Electrical Contractor for the removal and replacement of Telemetry Cabinets for the existing Supervisory, Control, And Data Acquisition (SCADA) System in a series of phased projects. Also, said Contractor shall provide all labor, materials, equipment, and incidentals required to construct as detailed in the contract documents. The overall work includes, but is not limited to the following: Replacement of thirty-three (33) telemetry cabinets as further specified in the Bid document. As previously stated, this will be a phased project. This contract will be an initial three (3) year period with the option to renew for an additional one (1) year, in the AUTHORITY's sole and unfettered discretion. Small Business Enterprise (SBE) Participation: No API Each bid submittal shall include a Bid Security in the form of a surety company Bid Bond or Cashier's check (check submitted in advance) in an amount of not less than five percent (5%) of the total bid amount. Questions and Answers: The AUTHORITY provides a specified time for BIDDERS to ask questions and seek clarification regarding the requirements of the solicitation. All questions or clarification inquiries must be submitted through Bonfire by the date and time specified in the bid document (including any addenda). The AUTHORITY will respond to all questions through Bonfire, that may include a written Addendum. Submittal Instructions: BIDDER MUST submit its solicitation response electronically and MUST confirm its submittal in order for the Authority to receive a valid response through Bonfire. Refer to Bonfire for submittal instructions. It is the BIDDER's sole responsibility to assure its response is submitted and received through Bonfire by the date and time specified in the solicitation. The AUTHORITY will not consider bid responses received by other means. BIDDERS are encouraged to submit their responses in advance of the due date and time specified in the solicitation document. In the event that the BIDDER is having difficulty submitting the solicitation document through Bonfire, immediately notify the Bid Contact (Purchasing Agent), and then contact Bonfire for technical assistance.

Files

File Type Posted
18-Section 01200 - Project Meetings - 08182026.pdf PDF
3-ITB 27-402 - Section 00300 - Bid Form.pdf PDF
5-ITB 27-402 - Section 00300 - Trench Safety Act.pdf PDF
25-Section 162914 - Telemetry Cabinets - 090826docx.pdf PDF
28-Section 160526 - Grounding and Bonding for Electrical Systems - 08182026.pdf PDF
15-Section 01153 - Change Order Procedures - 08182026.pdf PDF
19-Section 01300 - Submittals - 08182026.pdf PDF
2-ITB 27-402 - Section 00300 - Bid Bond.pdf PDF
26-Section 160502 - Miscellaneous Equipment - 08182026.pdf PDF
31-RTU-Locations Page03.jpg JPG image
1-ITB 27-402 - Removal Replacement of Telemetry Cabinets.pdf PDF
14-Section 01700 - Contract Closeout - 08182026.pdf PDF
6-Section 01005 - General Requirements - 09292026.pdf PDF
7-Section 01041 - Project Coordination - 09292026.pdf PDF
22-Section 160501 - Basic Electrical Materials and Methods - 08182026.pdf PDF
4-ITB 27-402 - Section 00300 - Project Experience Forms 1-3.pdf PDF
13-Section 01310 - Progress Schedules - 08182026.pdf PDF
12-Section 01102 - Safety Health and Emergency Response Requirements - 08182026.pdf PDF
8-Section 01014 - Construction Sequence - 08182026.pdf PDF
9-Section 01100 - Special Project Procedures - 09292026.pdf PDF
29-RTU-Locations Page01REV(1).jpg JPG image
21-Section 01610 - Material and Equipment - 08182026.pdf PDF
10-Section 01025 - Measurement and Payment - 09082026.pdf PDF
17-Section 01152 - Applications for Payment - 08182026.pdf PDF
32-ITB 27-402 - Section 00300 - Authority to Execute Contract.pdf PDF
23-Section 01740 - Warranties and Bonds - 08182026.pdf PDF
16-Section 01710 - Cleaning - 08182026.pdf PDF
20-Section 01370 - Schedule of Values - 08182026.pdf PDF
27-Section 160519 - Low Voltage Electrical Power Conductors and Cables.pdf PDF
11-Section 01010 - Summary of Work - 08182026.pdf PDF
24-Section 160533 - Raceways and Boxes for Electrical Systems - 08182026.pdf PDF
30-RTU-Locations Page02.jpg JPG image
Show all 32

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors