Removal and Replacement of Telemetry Cabinets for Existing SCADA System - Phased Projects
Open State & local contract opportunity Posted
- Solicitation number
- ITB No.: 27-402/DL
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 28509 Cabinets, Electrical Service Entrance
- 91221 Construction, Energy Related (All Types)
- 91356 Construction, Utility/Underground Projects
- 91360 Construction, Water System/Plants, Main And Service Line
- 91438 Electrical
- 93921 Computers, Data Processing Equipment And Accessories (Not Word Processing Equipment), Maintenance And Repair
- 96848 Inspection Services, Electrical Instrumentation And Control
- UNSPSC codes
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 95121811 Aquaduct or other water supply conduit, except pipeline
- 72151500 Electrical system services
- 72151501 Lighting installation services
- 72151524 Industrial electrical service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 95121810 Irrigation and flood control waterworks
Show all 36
- 81112305 X86 server maintenance
- 39121335 Telephone termination cabinet
- 71121649 Conductor service
- 72141126 Underground utilities construction service
- 72121505 Waste water and sewage treatment plant construction service
- 72151522 Electrical luminary service
- 81112303 Mainframe computer maintenance
- 81112306 Printer, scanner and multifunctional equipment maintenance
- 81112308 Point of sale hardware maintenance and support service
- 81112310 Computer cabinet maintenance
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- 81112300 Computer hardware maintenance and support
- 81112301 Disk storage system maintenance
- 81112302 Nearline or backup system maintenance
- 81112304 UNIX server maintenance
- 81112307 PC or workstation or notebook maintenance
- 81112309 Point of sale hardware installation or implementation service
Opportunity details come from swa.bonfirehub.com. Updated .
About this opportunity
The Solid Waste Authority of Palm Beach County is soliciting bids under ITB 27-402/DL for the removal and replacement of 33 telemetry cabinets serving an existing SCADA system, with a non-mandatory pre-bid conference on December 3, 2026 at 10:00 a.m. and bids due December 16, 2026 at 2:00 p.m. Work must be performed by a licensed Florida General or Electrical Contractor. No Small Business Enterprise (SBE) or Affirmative Procurement Initiative (API) set-aside applies, though the Authority encourages SBE participation.
The contract is a single-source specification: Section 162914 designates SP Manufacturing LLC as the exclusive control panel supplier, with no substitutes permitted, and Section 160501 specifies LFS-3167 and LFS-3170 telemetry cabinet units from that manufacturer. Contractors must maintain an office within 150 miles of the project and submit three project references covering system engineering, programming, field testing, calibration, startup, and operator training. RTU panel fabricators must document at least five years of industrial SCADA/RTU panel design and construction experience. Scope includes demolition of existing cabinets, installation of new NEMA-rated cabinets with programmable logic controllers, rerouting and terminating field wiring, temporary control systems during cutover, and end-to-end loop verification to the SCADA screen, signed off by the Authority's SCADA integrator. Work sites include pump stations, surface water facilities, flare systems, and landfill, leachate, gas collection, and compost operations, with the contractor required to maintain two-way access for semi-trailer trucks.
The initial term is three years, with a one-year renewal at the Authority's sole discretion. No contract value is stated. Bid security is 5% of the total bid amount, and performance, payment, and maintenance/warranty bonds equal 100% of panel fabrication value. A public construction bond of 100% of contract amount is required for contracts exceeding $200,000, furnished within 21 days of the Notice of Award. Liquidated damages are $500 per day for failure to achieve substantial completion and $250 per day for final completion. Mobilization must begin within 30 days of notification. Award goes to the lowest responsive and responsible bidder on the grand total of Section 1 (mobilization/demobilization) and Section 2 (removal and replacement of RTU control panels). Bids remain valid for 90 business days after opening.
Required bid documents include proof of SBE status if applicable, trench safety compliance, three performance experience forms, authority to execute, and a vendor acknowledgement form. Questions are due December 7, 2026 at 5:00 p.m. through Bonfire's Q&A module. Bids are accepted only through Bonfire, with a public opening via Teams audio conferencing immediately following the December 16 deadline.
Opportunity text
The proposed work will be contracted to a licensed Florida General or Electrical Contractor for the removal and replacement of Telemetry Cabinets for the existing Supervisory, Control, And Data Acquisition (SCADA) System in a series of phased projects. Also, said Contractor shall provide all labor, materials, equipment, and incidentals required to construct as detailed in the contract documents. The overall work includes, but is not limited to the following: Replacement of thirty-three (33) telemetry cabinets as further specified in the Bid document. As previously stated, this will be a phased project. This contract will be an initial three (3) year period with the option to renew for an additional one (1) year, in the AUTHORITY's sole and unfettered discretion. Small Business Enterprise (SBE) Participation: No API Each bid submittal shall include a Bid Security in the form of a surety company Bid Bond or Cashier's check (check submitted in advance) in an amount of not less than five percent (5%) of the total bid amount. Questions and Answers: The AUTHORITY provides a specified time for BIDDERS to ask questions and seek clarification regarding the requirements of the solicitation. All questions or clarification inquiries must be submitted through Bonfire by the date and time specified in the bid document (including any addenda). The AUTHORITY will respond to all questions through Bonfire, that may include a written Addendum. Submittal Instructions: BIDDER MUST submit its solicitation response electronically and MUST confirm its submittal in order for the Authority to receive a valid response through Bonfire. Refer to Bonfire for submittal instructions. It is the BIDDER's sole responsibility to assure its response is submitted and received through Bonfire by the date and time specified in the solicitation. The AUTHORITY will not consider bid responses received by other means. BIDDERS are encouraged to submit their responses in advance of the due date and time specified in the solicitation document. In the event that the BIDDER is having difficulty submitting the solicitation document through Bonfire, immediately notify the Bid Contact (Purchasing Agent), and then contact Bonfire for technical assistance.
Files
Show all 32
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity