16-Section 01710 - Cleaning - 08182026.pdf
PDF 123 KB Posted
- Attached to
- Removal and Replacement of Telemetry Cabinets for Existing SCADA System - Phased Projects
- Solicitation number
- ITB No.: 27-402/DL
- Issued by
- Palm Beach County, Florida
About this file
This is a Section 01710 Cleaning specification document for ITB No. 27-402/DL, which pertains to the Removal and Replacement of Telemetry Cabinets for Existing SCADA Systems project administered by a Florida Authority. The project involves the replacement of thirty-three (33) telemetry cabinets through phased projects and requires a licensed Florida General or Electrical Contractor to provide all labor, materials, equipment, and incidentals necessary for completion. The contract terms include an initial three (3) year period with an option to renew for an additional one (1) year at the Authority's sole discretion. Bid responses must be submitted electronically through Bonfire by the specified deadline, with all questions and clarifications also submitted through Bonfire by the designated date and time. Each bid submittal must include bid security in the form of a surety company bid bond or cashier's check in an amount of not less than five percent (5%) of the total bid amount.
The cleaning specification requires the contractor to execute daily cleaning during construction to maintain the work site, adjacent properties, and surrounding areas free from waste materials, rubbish, and debris, with waste separated and stored in an approved onsite area. Prior to substantial completion or owner acceptance, the contractor must employ skilled workmen to conduct final cleaning, including broom cleaning of exterior paved surfaces, rake cleaning of other ground surfaces, and inspection of all sight-exposed interior and exterior surfaces to verify cleanliness to the owner's satisfaction. All cleaning and disposal operations must comply with applicable codes, ordinances, regulations, and anti-pollution laws.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB No.: 27-402/DL Removal & Replacement of Telemetry Cabinets for 01710 -1 Existing SCADA Systems – Phased Projects
SECTION 01710
CLEANING
PART 1 – GENERAL
1.01 REQUIREMENTS INCLUDED
A. Contractor shall execute cleaning, during progress of the Work, and at completion of the Work.
1.02 DISPOSAL REQUIREMENTS
A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations, and anti-pollution laws.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION
3.01 DURING CONSTRUCTION
A. Execute daily cleaning to keep the Work, the site and adjacent properties free from accumulations of waste materials, rubbish and windblown debris, resulting from construction operations.
B. Provide onsite containers for the collection of waste materials, debris and rubbish. All waste materials including containers, food debris and other miscellaneous materials must be disposed of daily in onsite containers.
C. Waste materials, debris and rubbish from the construction site shall be separated and stored on site in an approved area.
3.02 FINAL CLEANING
A. Employ skilled workmen for final cleaning.
B. Broom clean exterior paved surfaces; rake clean other surfaces of the grounds.
C. Prior to substantial completion, or OWNER acceptance, Contractor shall conduct an inspection of sight-exposed interior and exterior surfaces, and all work areas, to verify that the entire Work is clean to the satisfaction of OWNER.
END OF SECTION