16-Section 01710 - Cleaning - 08182026.pdf

PDF 123 KB Posted

Attached to
Removal and Replacement of Telemetry Cabinets for Existing SCADA System - Phased Projects
Solicitation number
ITB No.: 27-402/DL
Issued by
Palm Beach County, Florida

About this file

This is a Section 01710 Cleaning specification document for ITB No. 27-402/DL, which pertains to the Removal and Replacement of Telemetry Cabinets for Existing SCADA Systems project administered by a Florida Authority. The project involves the replacement of thirty-three (33) telemetry cabinets through phased projects and requires a licensed Florida General or Electrical Contractor to provide all labor, materials, equipment, and incidentals necessary for completion. The contract terms include an initial three (3) year period with an option to renew for an additional one (1) year at the Authority's sole discretion. Bid responses must be submitted electronically through Bonfire by the specified deadline, with all questions and clarifications also submitted through Bonfire by the designated date and time. Each bid submittal must include bid security in the form of a surety company bid bond or cashier's check in an amount of not less than five percent (5%) of the total bid amount.

The cleaning specification requires the contractor to execute daily cleaning during construction to maintain the work site, adjacent properties, and surrounding areas free from waste materials, rubbish, and debris, with waste separated and stored in an approved onsite area. Prior to substantial completion or owner acceptance, the contractor must employ skilled workmen to conduct final cleaning, including broom cleaning of exterior paved surfaces, rake cleaning of other ground surfaces, and inspection of all sight-exposed interior and exterior surfaces to verify cleanliness to the owner's satisfaction. All cleaning and disposal operations must comply with applicable codes, ordinances, regulations, and anti-pollution laws.

View the file

Other files

File Type Posted
15-Section 01153 - Change Order Procedures - 08182026.pdf PDF
17-Section 01152 - Applications for Payment - 08182026.pdf PDF
32-ITB 27-402 - Section 00300 - Authority to Execute Contract.pdf PDF
27-Section 160519 - Low Voltage Electrical Power Conductors and Cables.pdf PDF
21-Section 01610 - Material and Equipment - 08182026.pdf PDF
24-Section 160533 - Raceways and Boxes for Electrical Systems - 08182026.pdf PDF
22-Section 160501 - Basic Electrical Materials and Methods - 08182026.pdf PDF
2-ITB 27-402 - Section 00300 - Bid Bond.pdf PDF
3-ITB 27-402 - Section 00300 - Bid Form.pdf PDF
14-Section 01700 - Contract Closeout - 08182026.pdf PDF
19-Section 01300 - Submittals - 08182026.pdf PDF
26-Section 160502 - Miscellaneous Equipment - 08182026.pdf PDF
28-Section 160526 - Grounding and Bonding for Electrical Systems - 08182026.pdf PDF
18-Section 01200 - Project Meetings - 08182026.pdf PDF
8-Section 01014 - Construction Sequence - 08182026.pdf PDF
31-RTU-Locations Page03.jpg JPG image
13-Section 01310 - Progress Schedules - 08182026.pdf PDF
7-Section 01041 - Project Coordination - 09292026.pdf PDF
4-ITB 27-402 - Section 00300 - Project Experience Forms 1-3.pdf PDF
1-ITB 27-402 - Removal Replacement of Telemetry Cabinets.pdf PDF
29-RTU-Locations Page01REV(1).jpg JPG image
5-ITB 27-402 - Section 00300 - Trench Safety Act.pdf PDF
10-Section 01025 - Measurement and Payment - 09082026.pdf PDF
9-Section 01100 - Special Project Procedures - 09292026.pdf PDF
12-Section 01102 - Safety Health and Emergency Response Requirements - 08182026.pdf PDF
25-Section 162914 - Telemetry Cabinets - 090826docx.pdf PDF
6-Section 01005 - General Requirements - 09292026.pdf PDF
30-RTU-Locations Page02.jpg JPG image
23-Section 01740 - Warranties and Bonds - 08182026.pdf PDF
11-Section 01010 - Summary of Work - 08182026.pdf PDF
20-Section 01370 - Schedule of Values - 08182026.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB No.: 27-402/DL Removal & Replacement of Telemetry Cabinets for 01710 -1 Existing SCADA Systems – Phased Projects

SECTION 01710

CLEANING

PART 1 – GENERAL

1.01 REQUIREMENTS INCLUDED

A. Contractor shall execute cleaning, during progress of the Work, and at completion of the Work.

1.02 DISPOSAL REQUIREMENTS

A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations, and anti-pollution laws.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.01 DURING CONSTRUCTION

A. Execute daily cleaning to keep the Work, the site and adjacent properties free from accumulations of waste materials, rubbish and windblown debris, resulting from construction operations.

B. Provide onsite containers for the collection of waste materials, debris and rubbish. All waste materials including containers, food debris and other miscellaneous materials must be disposed of daily in onsite containers.

C. Waste materials, debris and rubbish from the construction site shall be separated and stored on site in an approved area.

3.02 FINAL CLEANING

A. Employ skilled workmen for final cleaning.

B. Broom clean exterior paved surfaces; rake clean other surfaces of the grounds.

C. Prior to substantial completion, or OWNER acceptance, Contractor shall conduct an inspection of sight-exposed interior and exterior surfaces, and all work areas, to verify that the entire Work is clean to the satisfaction of OWNER.

END OF SECTION