20-Section 01370 - Schedule of Values - 08182026.pdf

PDF 147 KB Posted

Attached to
Removal and Replacement of Telemetry Cabinets for Existing SCADA System - Phased Projects
Solicitation number
ITB No.: 27-402/DL
Issued by
Palm Beach County, Florida

About this file

This is a Schedule of Values document for ITB No. 27-402/DL, a Florida state and local contract opportunity for the removal and replacement of telemetry cabinets for an existing Supervisory, Control, and Data Acquisition (SCADA) system across phased projects. The project involves the replacement of thirty-three (33) telemetry cabinets and requires a licensed Florida General or Electrical Contractor to provide all labor, materials, equipment, and incidentals necessary for completion. The contract encompasses an initial three-year period with an option to renew for an additional one year at the Authority's discretion. Contractors must submit a Schedule of Values within ten calendar days after the effective date of the Agreement, formatted on standard 8.5-inch by 11-inch or 8.5-inch by 14-inch white paper that identifies the project title and location, Owner and Project Number, contractor name and address, contract designation, and submission date.

The Schedule of Values must itemize the replacement of telemetry cabinets with separate line-item breakdowns for each individual cabinet location, subdivided into five distinct phases: demolition and removal of existing cabinets and associated infrastructure; procurement and delivery of new cabinets and components eligible for stored materials payments; physical installation and mounting; field wiring, terminations, and electrical connections; and testing, calibration, SCADA integration, and commissioning. Each line item must include a proportional amount of the Contractor's overhead and profit, and the sum of all values must equal the total Contract Sum. The document requires submission of a sub-schedule of unit costs and quantities for materials eligible for progress payments, with paid invoices required upon request and mandatory submission with the second payment request in which materials appear, or payment will be deleted from the request. Bid Security in the form of a surety company Bid Bond or Cashier's check is required in an amount of not less than five percent of the total bid amount, and all bid responses must be submitted electronically through Bonfire by the specified due date and time.

View the file

Other files

File Type Posted
15-Section 01153 - Change Order Procedures - 08182026.pdf PDF
17-Section 01152 - Applications for Payment - 08182026.pdf PDF
32-ITB 27-402 - Section 00300 - Authority to Execute Contract.pdf PDF
16-Section 01710 - Cleaning - 08182026.pdf PDF
27-Section 160519 - Low Voltage Electrical Power Conductors and Cables.pdf PDF
21-Section 01610 - Material and Equipment - 08182026.pdf PDF
24-Section 160533 - Raceways and Boxes for Electrical Systems - 08182026.pdf PDF
22-Section 160501 - Basic Electrical Materials and Methods - 08182026.pdf PDF
2-ITB 27-402 - Section 00300 - Bid Bond.pdf PDF
3-ITB 27-402 - Section 00300 - Bid Form.pdf PDF
14-Section 01700 - Contract Closeout - 08182026.pdf PDF
19-Section 01300 - Submittals - 08182026.pdf PDF
26-Section 160502 - Miscellaneous Equipment - 08182026.pdf PDF
28-Section 160526 - Grounding and Bonding for Electrical Systems - 08182026.pdf PDF
18-Section 01200 - Project Meetings - 08182026.pdf PDF
8-Section 01014 - Construction Sequence - 08182026.pdf PDF
31-RTU-Locations Page03.jpg JPG image
13-Section 01310 - Progress Schedules - 08182026.pdf PDF
7-Section 01041 - Project Coordination - 09292026.pdf PDF
4-ITB 27-402 - Section 00300 - Project Experience Forms 1-3.pdf PDF
1-ITB 27-402 - Removal Replacement of Telemetry Cabinets.pdf PDF
29-RTU-Locations Page01REV(1).jpg JPG image
5-ITB 27-402 - Section 00300 - Trench Safety Act.pdf PDF
10-Section 01025 - Measurement and Payment - 09082026.pdf PDF
9-Section 01100 - Special Project Procedures - 09292026.pdf PDF
12-Section 01102 - Safety Health and Emergency Response Requirements - 08182026.pdf PDF
25-Section 162914 - Telemetry Cabinets - 090826docx.pdf PDF
6-Section 01005 - General Requirements - 09292026.pdf PDF
30-RTU-Locations Page02.jpg JPG image
23-Section 01740 - Warranties and Bonds - 08182026.pdf PDF
11-Section 01010 - Summary of Work - 08182026.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB No.: 27-402/DL Removal & Replacement of Telemetry Cabinets for 01370 -1 Existing SCADA Systems – Phased Projects

SECTION 01370

SCHEDULE OF VALUES

PART 1 – GENERAL

1.01 REQUIREMENTS INCLUDED

A. The Contractor shall submit to the OWNER a Schedule of Values allocated to the various portions of the Work, within ten (10) calendar days after the effective date of the Agreement.

B. Upon request of the OWNER, support the values with data which will substantiate their correctness.

C. The accepted Schedule of Values shall be used only as the basis for the Contractor’s Application for Payment.

1.02 RELATED REQUIREMENTS

A. The Contract Documents include, but are not limited to, the following related sections:

1. Section 01025: Measurement and Payment

2. Section 01152: Application for Payment

1.03 FORM AND CONTENT OF SCHEDULE OF VALUES

A. Format schedule on an 8-1/2-inch x 11-inch or 8-1/2-inch x 14-inch white paper using the Schedule of Cost for Major Structures and/or Areas of Work. Identify schedule with:

1. Title of Project and location.

2. OWNER and Project Number.

3. Name and Address of Contractor.

4. Contract designation.

5. Date of submission.

B. Schedule shall list the installed value of the component parts of the Work in sufficient detail to serve as a basis for computing values for progress payments during construction.

C. Identify each line item with the number and title of the respective major section of the specifications.

D. For each major line item list sub-values of major products or operations under the item.

E. For various portions of the Work:

Removal & Replacement of Telemetry Cabinets for 01370 -2 Existing SCADA Systems – Phased Projects

1. Each item shall include a directly proportional amount of the Contractor’s overhead and profit.

2. For items on which progress payments will be requested for stored materials, break down the value into:

a. The cost of the materials delivered and unloaded, with taxes paid. Paid invoices are required for materials upon request by the OWNER.

b. The total installed value.

F. The sum of all values listed in the schedule shall equal the total Contract Sum.

G. The Schedule of Values shall explicitly itemize the replacement of telemetry cabinets. If multiple sites or cabinets are included in the Work, provide a separate line-item breakdown for each individual telemetry cabinet location, further sub-divided into the following phases:

1. Demolition, removal, and disposal of existing telemetry cabinets and associated wiring/conduits.

2. Procurement and delivery of new telemetry cabinets, PLC/RTU components, surge protection, and internal panel hardware (eligible for stored materials payments per Section 1.03.E.2).

3. Physical installation and mounting of new telemetry cabinets.

4. Field wiring, terminations, and electrical/communication connections.

5. Testing, loop checks, calibration, SCADA integration, commissioning, and final startup.

1.04 SUBSCHEDULE OF UNIT MATERIAL VALUES

A. Submit a sub-schedule of unit costs and quantities for:

1. Products on which progress payments will be requested for stored products.

B. The form of submittal shall parallel that of the Schedule of Values, with each item identified the same as the line item in the Schedule of Values.

C. The unit quantity for bulk materials shall include an allowance for normal waste.

D. The unit values for the materials shall be broken down into:

1. Cost of the material, delivered and unloaded at the site, with taxes paid.

Removal & Replacement of Telemetry Cabinets for 01370 -3 Existing SCADA Systems – Phased Projects

2. Copies of invoices for component material shall be included with the payment request in which the material first appears.

3. Paid invoices shall be provided with the second payment request in which the material appears, or no payment shall be allowed and/or may be deleted from the request.

E. The installed unit value multiplied by the quantity listed shall equal the cost of that item in the Schedule of Values.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION