4-ITB 27-402 - Section 00300 - Project Experience Forms 1-3.pdf

PDF 56 KB Posted

Attached to
Removal and Replacement of Telemetry Cabinets for Existing SCADA System - Phased Projects
Solicitation number
ITB No.: 27-402/DL
Issued by
Palm Beach County, Florida

About this file

This document is a Bid Form Section 00300 for Invitation to Bid (ITB) No. 27-402/DL issued by a Florida authority for the removal and replacement of telemetry cabinets for an existing Supervisory, Control, and Data Acquisition (SCADA) system. The project will be executed in phased projects and requires a licensed Florida General or Electrical Contractor to provide all labor, materials, equipment, and incidentals. The work encompasses the replacement of thirty-three (33) telemetry cabinets as specified in the contract documents. The contract is structured as an initial three-year period with an option to renew for an additional one-year term at the authority's sole discretion. Bidders must submit responses electronically through Bonfire by the specified deadline and date, with all questions and clarification inquiries also submitted through Bonfire within the designated timeframe.

Each bid submittal must include bid security in the form of a surety company bid bond or cashier's check in an amount not less than five percent (5%) of the total bid amount. The document provided consists of three blank Project Experience Forms that bidders are required to complete, detailing relevant past project information including project name, location, owner, contract amounts, completion dates, and project management personnel. This form serves as documentation of the bidder's qualifications and experience with similar telemetry cabinet replacement and SCADA system work. No Small Business Enterprise (SBE) participation set-aside is indicated for this solicitation.

View the file

Other files

File Type Posted
15-Section 01153 - Change Order Procedures - 08182026.pdf PDF
17-Section 01152 - Applications for Payment - 08182026.pdf PDF
32-ITB 27-402 - Section 00300 - Authority to Execute Contract.pdf PDF
16-Section 01710 - Cleaning - 08182026.pdf PDF
27-Section 160519 - Low Voltage Electrical Power Conductors and Cables.pdf PDF
21-Section 01610 - Material and Equipment - 08182026.pdf PDF
24-Section 160533 - Raceways and Boxes for Electrical Systems - 08182026.pdf PDF
22-Section 160501 - Basic Electrical Materials and Methods - 08182026.pdf PDF
2-ITB 27-402 - Section 00300 - Bid Bond.pdf PDF
3-ITB 27-402 - Section 00300 - Bid Form.pdf PDF
14-Section 01700 - Contract Closeout - 08182026.pdf PDF
19-Section 01300 - Submittals - 08182026.pdf PDF
26-Section 160502 - Miscellaneous Equipment - 08182026.pdf PDF
28-Section 160526 - Grounding and Bonding for Electrical Systems - 08182026.pdf PDF
18-Section 01200 - Project Meetings - 08182026.pdf PDF
8-Section 01014 - Construction Sequence - 08182026.pdf PDF
31-RTU-Locations Page03.jpg JPG image
13-Section 01310 - Progress Schedules - 08182026.pdf PDF
7-Section 01041 - Project Coordination - 09292026.pdf PDF
1-ITB 27-402 - Removal Replacement of Telemetry Cabinets.pdf PDF
29-RTU-Locations Page01REV(1).jpg JPG image
5-ITB 27-402 - Section 00300 - Trench Safety Act.pdf PDF
10-Section 01025 - Measurement and Payment - 09082026.pdf PDF
9-Section 01100 - Special Project Procedures - 09292026.pdf PDF
12-Section 01102 - Safety Health and Emergency Response Requirements - 08182026.pdf PDF
25-Section 162914 - Telemetry Cabinets - 090826docx.pdf PDF
6-Section 01005 - General Requirements - 09292026.pdf PDF
30-RTU-Locations Page02.jpg JPG image
23-Section 01740 - Warranties and Bonds - 08182026.pdf PDF
11-Section 01010 - Summary of Work - 08182026.pdf PDF
20-Section 01370 - Schedule of Values - 08182026.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00300

BID FORM

ITB No.: 27-402/DL - 21 – Removal & Replacement of Telemetry Cabinets for Existing SCADA Systems – Phased Projects

PROJECT EXPERIENCE FORM # 1

Project Name: __________________________________________________________________________________________

Project Location: ________________________________________________________________________________________

Owner: ________________________________________________________________________________________________

Primary Contact (Owner’s Project Manager): __________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Secondary Contact: ______________________________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Original Contract Amount: $ _______________________________________________________________________________

Original Scheduled Completion Date: ________________________________________________________________________

Change Order Amount: $ _________________________________________________________________________________

Actual Completion Date: __________________________________________________________________________________

Project Manager Name: ___________________________________________________________________________________

Project Superintendent Name: ______________________________________________________________________________

Project Summary:

ITB No.: 27-402/DL - 22 –

PROJECT EXPERIENCE FORM # 2

Project Name: __________________________________________________________________________________________

Project Location: ________________________________________________________________________________________

Owner: ________________________________________________________________________________________________

Primary Contact (Owner’s Project Manager): __________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Secondary Contact: ______________________________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Original Contract Amount: $ _______________________________________________________________________________

Original Scheduled Completion Date: ________________________________________________________________________

Change Order Amount: $ _________________________________________________________________________________

Actual Completion Date: __________________________________________________________________________________

Project Manager Name: ___________________________________________________________________________________

Project Superintendent Name: ______________________________________________________________________________

ITB No.: 27-402/DL - 23 –

PROJECT EXPERIENCE FORM # 3

Project Name: __________________________________________________________________________________________

Project Location: ________________________________________________________________________________________

Owner: ________________________________________________________________________________________________

Primary Contact (Owner’s Project Manager): __________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Secondary Contact: ______________________________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Original Contract Amount: $ _______________________________________________________________________________

Original Scheduled Completion Date: ________________________________________________________________________

Change Order Amount: $ _________________________________________________________________________________

Actual Completion Date: __________________________________________________________________________________

Project Manager Name: ___________________________________________________________________________________

Project Superintendent Name: ______________________________________________________________________________

File details come from the government source that posted it. Updated .