About this opportunity
Palm Beach County Board of County Commissioners, through its Water Utilities Department, is soliciting sealed bids for the 2026 Lift Station Rehabilitation Continuing Construction Contract (Project No. 26-041), with a non-mandatory pre-bid conference and site visit on December 2, 2026 at 10:00 a.m. and bids due December 16, 2026 at 2:30 p.m. A mandatory Small Business Enterprise (SBE) subcontracting goal of 12 percent participation applies. Local preference provisions allow a five percent bid reduction for local bidders, capped at a $100,000 difference, with additional reductions for Glades-based bidders or local bidders using Glades subcontractors.
The work is rehabilitation of submersible wastewater lift stations, including wet well, valve vault, and manhole repairs or replacements with corrosion barrier coatings; submersible pump, guide rail, piping, and electrical panel replacement; emergency bypass systems; gravity sanitary sewer main installation and point repairs; access driveways and site restoration; and remote telemetry units and control systems. Bidders and subcontractors must be licensed and certified in the State of Florida and hold valid Palm Beach County business tax receipts. The contractor must provide all labor, materials, equipment, permits, and testing, and must comply with OSHA, AASHTO MUTCD traffic control, and NPDES permit requirements. Site access is limited to 7:00 a.m. to 3:00 p.m. on weekdays, and no more than three lift stations within a single sanitary sub-catchment basin or zone may be on bypass simultaneously without prior written authorization.
The contract is a three-year (36-month) unit-price continuing construction contract performed through individual Work Authorizations, Work Orders, and Work Supplements, with no guaranteed minimum volume. Allowances total $45,000, consisting of a $25,000 Owner's Allowance and a $20,000 Utility Relocation Allowance. Mobilization and demobilization may not exceed 3.5 percent of the total contract price. Bid bonds or certified checks must equal at least five percent of the total bid price, and a 100 percent public construction bond is required within 14 calendar days of County notification. Liquidated damages are $500 per calendar day for missing substantial completion within 1,095 calendar days and $250 per calendar day for missing final completion within 30 days of substantial completion.
The County will award to up to two of the lowest responsive and responsible bidders. Front-end documents are available for free download from the County's Vendor Self Service portal beginning November 10, 2026, or from plan houses for a $100 non-refundable service charge per set. Access to protected bid plans requires a plan holder registration form submitted to bids@pbcwater.com.