Construction Manager at Risk (CMAR) with Guaranteed Maximum Price for Construction of Transit Operations Maintenance Facility
Closed State & local contract opportunity Posted
- Solicitation number
- 2024-RFP-0493
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 909 Building Construction Services, New, Including Maintenance And Repair Services
- 90924 Building Construction, Commercial And Institutional
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91831 Construction Consulting
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- 94034 Construction, Transit Facility, Other (Including Rehab., Maintenance And Repair)
- UNSPSC codes
- 95120000 Permanent buildings and structures
- 95121500 Commercial and entertainment buildings and structures
- 95121704 Prison building
- 95121503 Cafeteria
- 95121703 Court building
- 95121606 Railway station
- 95121701 Post office
- 72121105 Shopping center and mall construction service
- 72141401 Detention facility construction service
- 95121604 Bus garage
Show all 36
- 95121607 Railway depot
- 95121605 Automotive repair or servicing building
- 95121711 Civic center
- 72140000 Heavy construction services
- 72121100 Commercial and office building construction services
- 95121700 Public buildings and structures
- 72111104 New dormitory construction service
- 72111105 New hotel or motel construction service
- 72121101 Commercial and office building new construction service
- 72141128 Public square construction and or remodelling service
- 95121702 Police station
- 95121603 Bus station
- 95122106 Hostel
- 95121505 Shopping center
- 95121504 Shop building
- 95121714 Public changing room and shower facility
- 95121507 Market
- 95121706 Ambulance station
- 72141400 Detention facility construction and repair services
- 72121104 Restaurant construction service
- 95121712 Art gallery
- 95121608 Underground railway station
- 95121501 Shopping mall
- 95121715 Public toilet facility
- 95121506 Theater
- 95121705 Fire station
- Point of contact
-
- Antonio Watson awatson@cityofpasadena.net (626) 744-8382
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Pasadena is procuring a Construction Manager at Risk (CMAR) contractor with Guaranteed Maximum Price authority to provide preconstruction and design-assist services in Phase 1, with an optional Phase 2 for construction services for the Transit Operations Maintenance Facility located at 2180 East Foothill Boulevard. This two-phase delivery project requires a contractor holding an active California Contractors State License Board license (Class A or B) with a minimum of five years of business experience, completion of at least three prevailing wage public contracts in California, and three similar projects exceeding $70 million in value within the preceding ten years. The facility will include demolition and grading, MEP systems, fire life safety systems, electrical infrastructure, Battery Electric Bus charging equipment, stormwater management, solar panels, and off-site improvements. Phase 1 preconstruction services are estimated to commence in July 2026 with completion by January 2027, while Phase 2 construction is estimated to commence in March 2027 with substantial completion required by June 2028 and final completion by July 2028, with liquidated delay damages assessed at $19,000 per day if Phase 2 substantial completion is not achieved. The mandatory pre-proposal meeting is scheduled for April 28, 2026, with a question submission deadline of May 22, 2026, and proposal submission deadline of June 8, 2026 at 2:00 PM; interviews are tentatively scheduled for June 22-25, 2026. Evaluation criteria are weighted as follows: experience and references (20%), organization and key personnel qualification (20%), project approach and methodology (30%), financial strength and stability (5%), safety record/Experience Modification Rate (5%), local Pasadena business preference (5%), small or micro-business certification (5%), CMAR price proposal (10%), and interview performance (50 additional points).
Proposers must maintain bonding capacity exceeding the City's estimate of direct construction costs of $60,000,000 and demonstrate financial strength through reviewed or audited financial statements showing profitability, liquidity, and positive net worth over the past three years. While no specific set-asides are designated as mandatory, the City grants preference points for local Pasadena business status and small or micro-business certifications by the California Department of General Services; disadvantaged business enterprise (DBE) and small business enterprise (SBE) certifications are evaluated for Phase 2 subcontractor listings. Contractors and all subcontractors must be registered with the California Department of Industrial Relations (DIR) and comply with prevailing wage requirements under California Labor Code; the project is partially funded by the Measure R Mobility Improvement Grant administered by the Metropolitan Transportation Authority. Insurance requirements for Phase 1 include Commercial General Liability of $1,000,000 per occurrence, Automobile Liability of $1,000,000 per accident, Workers' Compensation with statutory limits, and Professional Liability of $2,000,000 per occurrence; Phase 2 substantially increases requirements to $30,000,000 Commercial General Liability, $5,000,000 Automobile Liability, and Builder's Risk coverage equal to completed project value. The City is not obligated to authorize Phase 2 or issue a separate construction contract; however, it intends to negotiate a mutually agreeable Final Guaranteed Maximum Price prior to Phase 2 authorization, with the estimated direct construction cost of $60,000,000 exclusive of preconstruction services, general conditions, contingency, bonds, and insurance.
Opportunity text
The City of Pasadena is requesting CMAR Qualification Statements, technical proposals, and price proposals ("Proposal(s)") for a Construction Manager at Risk ("CMAR" or "Contractor" or "Proposer") to provide preconstruction/design-assist services and - if City's option to authorize Phase 2 is exercised - construction services, for the Construction of the Transit Operations Maintenance Facility (the "Project") as indicated below and described in greater detail in the Contract Documents enumerated in the City's Standard Form of Agreement. The City is seeking a CMAR that excels in five key areas: project experience, team composition, project approach and methodology, financial strength, and safety record, while also demonstrating a collaborative mindset to achieve optimal value within the City's Project budget and required schedule.
A Selection Committee shall review the Proposals received and, based on the criteria identified in the RFQ/P, the Selection Committee shall select no more than five(5) of the highest scoring finalists to shortlist, interview, and complete final scoring, pursuant to the P.M.C. section 4.08.047, competitive selection, using the CMAR alternative project delivery method. The Proposer recommended for award of the contract will be evaluated and determined on a best value basis, based on qualifications, organization/team composition, technical proposal, financial strength, safety record, local business, small business, price proposal, and interview scores.
Construction Manager at Risk is a two-phased delivery process: (1) Preconstruction/Design Assist Services Phase ("Phase 1") and an option for (2) Construction ("Phase 2"), If the City authorizes Phase 2, it will either issue an amendment to the Phase 1 contract or a separate contract for Phase 2. Note: The City is not obligated to authorize Phase 2 or issue a contract for Phase 2 - Construction. It is the City's intent to reach a mutually agreeable Final Guaranteed Maximum Price (GMP) prior to an award of Phase 2 contract/amendment. See Section 3. Scope of Work for further details on authorization of Phases.
The Project is funded, in part, by the Measure R Mobility Improvement Program (MIP) Grant administered by Metropolitan Transportation Authority (Metro) to support transportation system and mobility improvements, highway operational improvements, and transit investments.
Estimated Direct Cost of Construction Work Budget (includes escalation to midpoint of construction (but see AIA A133 section 3.2.10); excludes CMAR's preconstruction/design-assist services, OH & P, Contingency, Bonds, Insurance. General Conditions Costs, and General Requirement Costs $60,000,000 Estimated Commencement of Phase 1 - Preconstruction/Design Assist & Demolition and Grading Commencement (5 month duration) July 2026 Estimated Guaranteed Maximum Price (GMP)/ Completion of Phase 1 - Constructability Review Services January 2027 Estimated Phase 2 Notice to Proceed (NTP) - Construction Commencement (18 month duration) March 2027 Phase 2 - Construction Substantial Completion (Partial Occupancy or Use)* June 2028 Construction/Commissioning Complete* July 2028
*The Project must reach Substantial Completion by No Later Than ("NLT") June 2028 to ensure a seamless transition and uninterrupted operation of Pasadena Transit's services. The City's third party transit operator will begin mobilizing their equipment in July 2028 and will fully operate out of the new Transit Operations Maintenance Facility on July 1, 2028.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity