Subcontractor_Listing_-_Phase_2_Only.pdf
PDF 165 KB Posted
- Solicitation number
- 2024-RFP-0493
- Issued by
- Los Angeles County, California
About this file
This is a Subcontractor Listing form for Phase 2 of a Construction Manager at Risk (CMAR) project with Guaranteed Maximum Price for the Construction of Transit Operations Maintenance Facility being undertaken by the City of Pasadena, California. The form is used to document all subcontractors who will perform work amounting to more than 0.5% of the Total Base Bid or $10,000, whichever is greater. All contractors and subcontractors must be registered with the State Division of Industrial Relations and certified to bid on public works contracts through the California Division of Industrial Relations (DIR). The local agency will verify contractor and subcontractor registration at bid time and annually thereafter to ensure compliance throughout the project lifecycle. The form requires submission with the Guaranteed Maximum Price (GMP) proposal for Phase 2.
The subcontractor listing form requires documentation of contractor name and location, line item and description of work, subcontract amount, contractor license number, and certification status as a Disadvantaged Business Enterprise (DBE) or Small Business Enterprise (SBE). Each listed entity must provide their DIR registration number, DBE certification number if applicable, and SBE certification number if applicable. The form includes multiple rows to accommodate numerous subcontractor entries and is designed in accordance with Title 49, Section 26.11 of the Code of Federal Regulations and Section 4104 of the Public Contract Code of the State of California. This document serves as a compliance and transparency mechanism to ensure all subcontractors meet state registration and certification requirements prior to contract award and throughout project execution.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing Page ___ of ___
As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts must be registered with the State
Division of Industrial Relations and certified to bid on Public Works contracts. Please register at https://www.dir.ca.gov/Public-
Works/Contractor-Registration.html. The local agency will verify registration of all contractors and subcontractors on public works projects at bid and thereafter annually to assure that yearly registration is maintained throughout the life of the project.
In accordance with Title 49, Section 26.11 of the Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of the Total Base Bid or $10,000 (whichever is greater).
Project Name: ________________________________________________________________________
Subcontractor Name & Location Line Item & Description Subcontract Amount
Contractor License Number
DBE/SBE
(Y/N)
DBE Cert Number
DIR Reg Number SBE Cert Number
NAME DBE Number
City, State SBE Number https://www.dir.ca.gov/Public-Works/Contractor-Registration.html https://www.dir.ca.gov/Public-Works/Contractor-Registration.html tchen Text Box (To be submitted with GMP)
| Project Name: |
| NAME: |
| DIR Reg Number: |
| DBE Number: |
| City, State: |
| Text11: |
| Amount (1): |
| Text13: |
| Y/N (1): |
| SBE Number: |
| Text73: |
| Text77: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Text39: |
| Text40: |
| Text41: |
| Text42: |
| Text43: |
| Text44: |
| Text45: |
| Text46: |
| Text47: |
| Text48: |
| Text49: |
| Text50: |
| Text51: |
| Text52: |
| Text53: |
| Text54: |
| Text55: |
| Text56: |
| Text57: |
| Text58: |
| Text59: |
| Text60: |
| Text61: |
| Text62: |
| Text63: |
| Text64: |
| Text65: |
| Text66: |
| Text67: |
| Text68: |
| Text69: |
| Text70: |
| Text71: |
| Text72: |
| Text74: |
| Text75: |
| Text76: |
| Text78: |
File details come from the government source that posted it. Updated .