Plan_Set_TOMF_05.13.26.pdf

PDF 110 MB Posted

Attached to
Construction Manager at Risk (CMAR) with Guaranteed Maximum Price for Construction of Transit Operations Maintenance Facility
Solicitation number
2024-RFP-0493
Issued by
Los Angeles County, California

About this file

This is a plan set document for the Transit Operations Maintenance Facility project being procured by the City of Pasadena, California through a Construction Manager at Risk (CMAR) delivery method. The project involves the construction of a new transit operations and maintenance facility located at 2180 East Foothill Boulevard, which will include demolition and grading, mechanical/electrical/plumbing systems, fire life safety systems, electrical infrastructure, Battery Electric Bus charging equipment, stormwater management, solar panels, and off-site improvements. The procurement is structured as a two-phase process with Phase 1 preconstruction and design-assist services estimated to commence in July 2026 and conclude by January 2027, followed by an optional Phase 2 for construction services commencing in March 2027 with substantial completion targeted for June 2028 and final completion by July 2028. The mandatory pre-proposal meeting is scheduled for April 28, 2026, with a question submission deadline of May 22, 2026, and proposal submission deadline of June 8, 2026 at 2:00 PM; interviews are tentatively scheduled for June 22-25, 2026. Liquidated delay damages are assessed at $19,000 per day if Phase 2 substantial completion is not achieved.

Qualified proposers must hold an active California Contractors State License Board license (Class A or B), possess a minimum of five years of business experience, have completed at least three prevailing wage public contracts in California, and demonstrate three similar projects exceeding $70 million in value within the preceding ten years. The estimated direct construction cost is $60,000,000, exclusive of preconstruction services, general conditions, contingency, bonds, and insurance. Proposers must maintain bonding capacity exceeding $60,000,000 and demonstrate financial strength through reviewed or audited financial statements showing profitability, liquidity, and positive net worth over three years. Evaluation criteria are weighted as follows: experience and references (20%), organization and key personnel qualification (20%), project approach and methodology (30%), financial strength and stability (5%), safety record/Experience Modification Rate (5%), local Pasadena business preference (5%), small or micro-business certification (5%), CMAR price proposal (10%), and interview performance (50 additional points). Phase 1 insurance requirements include Commercial General Liability of $1,000,000 per occurrence, Automobile Liability of $1,000,000 per accident, Workers' Compensation with statutory limits, and Professional Liability of $2,000,000 per occurrence; Phase 2 substantially increases requirements to $30,000,000 Commercial General Liability, $5,000,000 Automobile Liability, and Builder's Risk coverage. The project is partially funded by the Measure R Mobility Improvement Grant administered by the Metropolitan Transportation Authority, and all contractors and subcontractors must be registered with the California Department of Industrial Relations and comply with prevailing wage requirements under California Labor Code.

View the file

Other files

File Type Posted
Construction_Manager_at_Risk_(CMAR)_with_Guaranteed_Maximum_Price_for_Construction_of_Transit_Operations_Maintenance_Facility_(Addendum_#2_Revision).pdf PDF
TOMF_Agreement_General_Conditions_Exhibits_and_Appendix.pdf PDF
Construction_Manager_at_Risk_(CMAR)_with_Guaranteed_Maximum_Price_for_Construction_of_Transit_Operations_Maintenance_Facility.pdf PDF
Citys_Standard_Form_(Traditional)_CMAR_Agreement.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred).pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
[U]_-_CMAR_Price_Proposal_TOMF.pdf PDF
AFFIDAVIT_OF_JOINT_VENTURE_05.2025.pdf PDF
Proof_of_Authority_(8).pdf PDF
Public_Contract_Code_Disclosure.pdf PDF
Civil_Litigation_History_Certification_ver02_(1).pdf PDF
Contractor_Qualificiation_Statement_(CMAR)_TOMF.pdf PDF
Subcontractor_Listing_-_Phase_2_Only.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_(27).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Plan_Set_TOMF.pdf PDF
[H]_Insurance_Requirements_(Phase_1_and_Phase_2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
Indemnity_Agreement_Form_05.2025.pdf PDF
Agenda_Report_5_-_02.03.2025.pdf PDF
LA-01684-03_TOMFPas_PhaseIIESARpt_7-8-2025.pdf PDF
TOMF_Geotechnical_Report_02.28.2024.pdf PDF
50%_Technical_Specifications_(Project_Manual)_TOMF.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .